April 2001============================================================================= DATE:01-Apr-2001 DOY: 91 OPERATIONS ENGINEER(S): W. Hammond / B. Donaldson SCIENTIST: A. Fludra CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operation COMMENTS: ============================================================================= DATE:02-Apr-2001 DOY: 92 OPERATIONS ENGINEER(S): R. Yurow SCIENTIST: W. Thompson CDS INSTRUMENT: One run of FFCAL (NIS Flat Field Calibration) was completed at ~17:00 UT. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operation COMMENTS: An X17 Flare occurred at ~22:00 UT. ============================================================================= DATE:03-Apr-2001 DOY: 93 OPERATIONS ENGINEER(S): R. Yurow SCIENTIST: W. Thompson CDS INSTRUMENT: Due to the flare yesterday, the science plan was aborted at 2:52 UT and CDS was placed in a safe mode. The science plan was resumed at 16:30 UT. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operation COMMENTS: ============================================================================= DATE:04-Apr-2001 DOY: 94 OPERATIONS ENGINEER(S): R. Yurow / C. Maroney SCIENTIST: W. Thompson CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations COMMENTS: ============================================================================= DATE:05-Apr-2001 DOY: 95 OPERATIONS ENGINEER(S): R. Yurow / C. Maroney SCIENTIST: W. Thompson CDS INSTRUMENT: A lubrication study was completed at 16:46 UT. The NIS was reset at 16:58 UT. Due to problems discovered after the NIS reset, the science plan was aborted at 20:19 UT and cpt/UPDATE was run. The science plan was resumed at 20:55 UT. Studies between 16:58 UT and 20:19 UT were run using the wrong NIS readout mode and MCP voltage. CDS GROUND SYSTEM: Nominal. DAY PLAN: Lubrication Study, Science Operations COMMENTS: ============================================================================= DATE:06-Apr-2001 DOY: 96 OPERATIONS ENGINEER(S): R. Yurow / C. Maroney SCIENTIST: W. Thompson CDS INSTRUMENT: A submode switch from submode 5 to submode 6 occured at 18:34 UT. CDS is nominal after the submode switch. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations COMMENTS: ============================================================================= DATE:07-Apr-2001 DOY: 97 OPERATIONS ENGINEER(S): W. Hammond / B. Donaldson SCIENTIST: W. Thompson CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations COMMENTS: ============================================================================= DATE:08-Apr-2001 DOY: 98 OPERATIONS ENGINEER(S): W. Hammond / B. Donaldson SCIENTIST: W. Thompson CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations COMMENTS: ============================================================================= DATE:09-Apr-2001 DOY: 99 OPERATIONS ENGINEER(S): R. Yurow / C. Maroney SCIENTIST: D. Zarro CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations COMMENTS: ============================================================================= DATE:10-Apr-2001 DOY: 100 OPERATIONS ENGINEER(S): C. Maroney SCIENTIST: D. Zarro CDS INSTRUMENT: An NIS Setup Register A Failure system error was detected. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations COMMENTS: ============================================================================= DATE:11-Apr-2001 DOY: 101 OPERATIONS ENGINEER(S): R. Yurow SCIENTIST: D. Zarro CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations COMMENTS: ============================================================================= DATE:12-Apr-2001 DOY: 102 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: D. Zarro CDS INSTRUMENT: A VDS RESET was completed at 21:45UT. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations COMMENTS: ============================================================================= DATE:13-Apr-2001 DOY: 103 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: D. Zarro CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations COMMENTS: ============================================================================= DATE:14-Apr-2001 DOY: 104 OPERATIONS ENGINEER(S): W. Hammond / B. Donaldson SCIENTIST: D. Zarro CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations COMMENTS: ============================================================================= DATE:15-Apr-2001 DOY: 105 OPERATIONS ENGINEER(S): R. Yurow / B. Donaldson SCIENTIST: D. Zarro CDS INSTRUMENT: A parity error was detected in the secondary (science) processor memory space. The science plan was aborted and CDS placed in a safe mode (NIS HV disabled) at 17:01 UT due to an ongoing proton storm. As an additional precaution, all of the GIS HVs were disabled at 21:56 UT. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations COMMENTS: An X14 flare occured at 13:19 UT ============================================================================= DATE:16-Apr-2001 DOY: 106 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: A. Young CDS INSTRUMENT: The Science Plan was resumed at 17:30 UT after Proton Counts had dropped down to a safe level. The Secondary Process was Reset at 21:21 UT. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations COMMENTS: ============================================================================= DATE:17-Apr-2001 DOY: 107 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: A. Young CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations COMMENTS: ============================================================================= DATE:18-Apr-2001 DOY: 108 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: A. Young CDS INSTRUMENT: After monitoring Increasing Proton Activity, the Science Plan was aborted at 06:54 UT. And NIS and GIS High Voltages were DISABLED at 07:00 UT. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations COMMENTS: ============================================================================= DATE:19-Apr-2001 DOY: 109 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: A. Young CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations COMMENTS: ============================================================================= DATE:20-Apr-2001 DOY: 110 OPERATIONS ENGINEER(S): C. Maroney SCIENTIST: A. Young CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations COMMENTS: ============================================================================= DATE:21-Apr-2001 DOY: 111 OPERATIONS ENGINEER(S): W. Hammond / B. Donaldson SCIENTIST: A. Young CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations COMMENTS: ============================================================================= DATE:22-Apr-2001 DOY: 112 OPERATIONS ENGINEER(S): C. Maroney SCIENTIST: A. Young CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations COMMENTS: ============================================================================= DATE:23-Apr-2001 DOY: 113 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: T. Kucera CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: cdso8 was rebooted at about 21:50UT due to admin problems. DAY PLAN: Science Operations COMMENTS: ============================================================================= DATE:24-Apr-2001 DOY: 114 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: T. Kucera CDS INSTRUMENT: A parity error was detected on the Secondary Processor at address #800709c7. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations COMMENTS: ============================================================================= DATE:25-Apr-2001 DOY: 115 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: T. Kucera CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations COMMENTS: ============================================================================= DATE:26-Apr-2001 DOY: 116 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: T. Kucera CDS INSTRUMENT: A VDS Register A Failure was detected. CDS GROUND SYSTEM: The following studies were imported to the EOF: fw_ctxt_1.def fw_fast_1.def DAY PLAN: Science Operations COMMENTS: ============================================================================= DATE:27-Apr-2001 DOY: 117 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: T. Kucera CDS INSTRUMENT: A Mechanism Lube was completed at 19:38UT. VDS and Secondary Processor were rebooted at 20:00UT. CDS GROUND SYSTEM: Nominal. DAY PLAN: Mechanism Lube, Science Operations COMMENTS: Reboot VDS/Secondary (time permitting) ============================================================================= DATE:28-Apr-2001 DOY: 118 OPERATIONS ENGINEER(S): W. Hammond / B. Donaldson SCIENTIST: T. Kucera CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations COMMENTS: ============================================================================= DATE:29-Apr-2001 DOY: 119 OPERATIONS ENGINEER(S): W. Hammond / B. Donaldson SCIENTIST: T. Kucera CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations COMMENTS: ============================================================================= DATE:30-Apr-2001 DOY: 120 OPERATIONS ENGINEER(S): W. Hammond / B. Donaldson SCIENTIST: A. Fludra CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations COMMENTS: ============================================================================= From the CDS Operations Management Team in the Space Science & Technology Department at CCLRC Rutherford Appleton Laboratory Site maintained by John Rainnie. Last revised on Friday ( 7/Sep/2001) at 14:11. |