Scientific Operations | ||
|
April 2002============================================================================= DATE:1-April-2002 DOY: 091 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: P. Gallagher CDS INSTRUMENT: A VDS Register A Failure was detected. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:2-April-2002 DOY: 092 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: P. Gallagher CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:3-April-2002 DOY: 093 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: P. Gallagher CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:4-April-2002 DOY: 094 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: P. Gallagher CDS INSTRUMENT: An error was detected on the Primary Processor at memory location #80016447 (Two Transputer). SAFE. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:5-April-2002 DOY: 095 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: P. Gallagher CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: A telemetry submode change was made from submode 6 to submode 5 @ 16:46 UT. CDS is nominal after the submode change. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:6-April-2002 DOY: 096 OPERATIONS ENGINEER(S): B. Donaldson SCIENTIST: P. Gallagher CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:7-April-2002 DOY: 097 OPERATIONS ENGINEER(S): R. Yurow SCIENTIST: P. Gallagher CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:8-April-2002 DOY: 098 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: T. Fredvik CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:9-April-2002 DOY: 099 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: T. Fredvik CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:10-April-2002 DOY: 100 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: T. Fredvik CDS INSTRUMENT: GIS detector 1 tripped at 23:48 UT during GIMCP2 study. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:11-April-2002 DOY: 101 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: T. Fredvik CDS INSTRUMENT: GIS detector 1 was reset at 22:28 UT. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:12-April-2002 DOY: 102 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: T. Fredvik CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:13-April-2002 DOY: 103 OPERATIONS ENGINEER(S): B. Donaldson SCIENTIST: T. Fredvik CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:14-April-2002 DOY: 104 OPERATIONS ENGINEER(S): R. Yurow SCIENTIST: T. Fredvik CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:15-April-2002 DOY: 105 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: T. Fredvik CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:16-April-2002 DOY: 106 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: T. Fredvik CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:17-April-2002 DOY: 107 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: T. Fredvik CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:18-April-2002 DOY: 108 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: T. Fredvik CDS INSTRUMENT: A Mechanism Lubrication study was completed at 18:15 UT. A VDS reset was completed at 18:40 UT. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:19-April-2002 DOY: 109 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: T. Fredvik CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:20-April-2002 DOY: 110 OPERATIONS ENGINEER(S): B. Donaldson SCIENTIST: T. Fredvik CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:21-April-2002 DOY: 111 OPERATIONS ENGINEER(S): R. Yurow / C. Maroney SCIENTIST: T. Fredvik CDS INSTRUMENT: A primary memory error was detected at address #80060db3. The science plan was aborted at 04:22 UT and the high voltage was disabled to both the NIS & GIS detectors in order to safe for a proton storm. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:22-April-2002 DOY: 112 OPERATIONS ENGINEER(S): R. Yurow SCIENTIST: P. Young CDS INSTRUMENT: A primary memory error was detected at address #8000448b. A CDS reboot was initiated at 22:47 UT with a transition to STANDBY mode, followed by SNOOZE mode at 22:56 UT. A WATCHDOG error was triggered at 22:53 to reset the CDHS. Recovery operations completed nominally at 23:54 UT. Finally, the NIS & GIS high voltages were disabled due to an ongoing proton storm. CDS GROUND SYSTEM: Nominal. DAY PLAN: Monitor Proton Storm, CDS Recovery. COMMENTS: MEDOC Campaign ============================================================================= DATE:23-April-2002 DOY: 113 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: P. Young CDS INSTRUMENT: CDS high voltages to both the GIS and the NIS were reenabled to 20:26 UT. The science plan was resumed at 21:45 UT. CDS GROUND SYSTEM: Nominal. DAY PLAN: CDS Recovery. COMMENTS: MEDOC Campaign ============================================================================= DATE:24-April-2002 DOY: 114 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: P. Young CDS INSTRUMENT: A VDS Register A Failure was detected. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: MEDOC Campaign ============================================================================= DATE:25-April-2002 DOY: 115 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: P. Young CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: The file study_counter_anomaly.dat was updated. DAY PLAN: Science Operations. COMMENTS: MEDOC Campaign ============================================================================= DATE:26-April-2002 DOY: 116 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: P. Young CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: MEDOC Campaign ============================================================================= DATE:27-April-2002 DOY: 117 OPERATIONS ENGINEER(S): B. Donaldson SCIENTIST: P. Young CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: MEDOC Campaign ============================================================================= DATE:28-April-2002 DOY: 118 OPERATIONS ENGINEER(S): R. Yurow SCIENTIST: P. Young CDS INSTRUMENT: A parity error was detected in the Secondary (Science) processor memory space at address #8006ca73. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: MEDOC Campaign ============================================================================= DATE:29-April-2002 DOY: 119 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: J. Ireland CDS INSTRUMENT: A parity error was detected in the Secondary (Science) processor memory space at address #8007ca1f. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:30-April-2002 DOY: 120 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: J. Ireland CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= From the CDS Operations Management Team in the Space Science & Technology Department at CCLRC Rutherford Appleton Laboratory Site maintained by John Rainnie. Last revised on Friday ( 7/Sep/2001) at 14:11. |