Scientific Operations
 Front Page
 Scientific Ops
  » Plans
  » Pointings
  » Report
  » Requests
  » Log
  » Notes
  » Tech Info
 Engineering
 Software
 Results
 Gallery
 Atlas
>  Press
 Links
 Project
 Newsletter
 Copyright
April 2006
 
=============================================================================
DATE: 1-Apr-2006
DOY: 091
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: P. Young (RAL)
CDS INSTRUMENT: 
  GIS raw dumps were conducted from 21:30 UT to 01:00 UT (DOY 092).
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE: 2-Apr-2006
DOY: 092
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: P. Young (RAL)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE: 3-Apr-2006
DOY: 093
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: P. Young (RAL)
CDS INSTRUMENT: 
  A parity error was detected in the primary memory space at address
#8001447b (IMIF Module - Not Safe).
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE: 4-Apr-2006
DOY: 094
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: P. Young (RAL)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: 
  The following changes were made to raster durations at the EOF:
    NIMCP    (RID/50    Var/1)    1500s - 1520s
    NISAT_W  (RID/77    Var/4)    5110s - 5130s
    STRE4W   (RID/11    Var/120)  6150s - 6180s
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE: 5-Apr-2006
DOY: 095
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: P. Young (RAL)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: 
  Raw data file 97 was added to the EOF database.
  GSET 80 was added to the EOF database. 
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE: 6-Apr-2006
DOY: 096
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: P. Young (RAL)
CDS INSTRUMENT: 
  A Mechanism Lubrication was performed at 16:35 UT.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE: 7-Apr-2006
DOY: 097
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: P. Young (RAL)
CDS INSTRUMENT: 
  A Flat Field Calibrations study was performed at 16:54 UT.
  A parity error was detected on the primary processor at address #8005f2eb
(Compression Module - SAFE).
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE: 8-Apr-2006
DOY: 098
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: P. Young (RAL)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE: 9-Apr-2006
DOY: 099
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: P. Young (RAL)
CDS INSTRUMENT: 
  A CDHS reboot was triggered using the CB3RESET command at 00:05 UT.  
The LOBT was sent to the instrument at 00:07 UT.  The study counter was 
incremented to 34658.  Reboot was completed successfully at 01:10 UT.  
Science plan will resume at 02:35 UT.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE: 10-Apr-2006
DOY: 100
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: J. Brosius (GSFC)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE: 11-Apr-2006
DOY: 101
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: J. Brosius (GSFC)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE: 12-Apr-2006
DOY: 102
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: J. Brosius (GSFC)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: EUNIS	Rocket Launch (18:40 UT)
=============================================================================
DATE: 13-Apr-2006
DOY: 103
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: J. Brosius (GSFC)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE: 14-Apr-2006
DOY: 104
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: J. Brosius (GSFC)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE: 15-Apr-2006
DOY: 105
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: J. Brosius (GSFC)
CDS INSTRUMENT: 
  The science plan was aborted at 19:05 UT to allow an unscheduled submode
change (from Submode 6 to 5) to occur (SUMER Request).
CDS GROUND SYSTEM: 
  A telemetry submode change occurred at 19:09 UT.  CDS Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE: 16-Apr-2006
DOY: 106
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: J. Brosius (GSFC)
CDS INSTRUMENT: 
  A primary parity error was detected at address #800187bf (IIF Detect 
Module - SAFE).
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE: 17-Apr-2006
DOY: 107
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: J. Brosius (GSFC)
CDS INSTRUMENT: 
  The science plan was aborted at 14:57 UT for a scheduled submode change.
  After two failed memory dumps of the IIF Detect Module, it was necessary to
perform a CDS Reboot:  A Reboot was initiated at 19:05 UT using the CB3RESET.
The Reboot was successfully completed at 20:14 UT.  The science plan will 
resume at 22:00 UT.
CDS GROUND SYSTEM: 
  A telemetry submode change (from Submode 5 to 6) occurred at 15:02 UT.
  CDS Nominal after submode change.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE: 18-Apr-2006
DOY: 108
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: D. Bewsher (RAL)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE: 19-Apr-2006
DOY: 109
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: D. Bewsher (RAL)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE: 20-Apr-2006
DOY: 110
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: D. Bewsher (RAL)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE: 21-Apr-2006
DOY: 111
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: D. Bewsher (RAL)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE: 22-Apr-2006
DOY: 112
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: D. Bewsher (RAL)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE: 23-Apr-2006
DOY: 113
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: D. Bewsher (RAL)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE: 24-Apr-2006
DOY: 114
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: P. Young / D. Tripathi (RAL)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE: 25-Apr-2006
DOY: 115
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: P. Young / D. Tripathi (RAL)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE: 26-Apr-2006
DOY: 116
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: P. Young / D. Tripathi (RAL)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: 
  The following studies were imported to the EOF database:
    VARDYN_C    (Study_ID/319    Var/1)
    VARDYN_D    (Study_ID/320    Var/1)
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE: 27-Apr-2006
DOY: 117
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: P. Young / D. Tripathi (RAL)
CDS INSTRUMENT: 
  A primary parity error was detected at address #8000b6c7 - This is in the
CDS HK Module (Unsafe).  A reboot will be planned as soon as possible.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE: 28-Apr-2006
DOY: 118
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: P. Young / D. Tripathi (RAL)
CDS INSTRUMENT: 
  GIS raw dumps were performed from 16:00 - 18:00 UT.
  At 18:35 UT, the CDHS was reset using the CB3RESET procedure.  LOBT was 
reset at 18:55 UT.  At 19:39 UT, CDS was returned to READY_BOTH_RAM and 
reboot was completed at 19:50 UT.
  GIS raw dumps were performed from 20:00 - 22:00 UT.
  A Mechanism Lubrication was performed by engineering study at 23:30 UT.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE: 29-Apr-2006
DOY: 119
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: P. Young / D. Tripathi (RAL)
CDS INSTRUMENT: 
  GIS raw dumps were performed 15:00 - 20:00 UT.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE: 30-Apr-2006
DOY: 120
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: P. Young / D. Tripathi (RAL)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================





From the CDS Operations Management Team in the Space Science & Technology Department at CCLRC Rutherford Appleton Laboratory
Site maintained by John Rainnie.
Last revised on Thursday (19/Jan/2006) at 11:09.