Scientific Operations | ||
|
April 1996==================================================================================== DOY -- 92 INSTRUMENT STATUS: Nominal CDS GROUND SYSTEM: IWS Commanding Rate set to 3 seconds. PLANNING : Comments : ==================================================================================== DOY -- 93 INSTRUMENT STATUS: Nominal CDS GROUND SYSTEM: Nominal PLANNING : Comments : Performed GIS raw dumps using slit 1 on detector 2. Also performed dumps using slit 4 on detectors 1,2,3,4. Upload problem CPT. ==================================================================================== DOY -- 94 INSTRUMENT STATUS: Nominal CDS GROUND SYSTEM: Nominal PLANNING : J3 Test - CDS running GIS. Comments : Upload problem- CPT ==================================================================================== DOY -- 95 INSTRUMENT STATUS: Nominal CDS GROUND SYSTEM: Nominal PLANNING : J3 E/W Limb show. Comments : Detector 3 trip. New Alarm db Command db ==================================================================================== DOY -- 96 INSTRUMENT STATUS: Nominal CDS GROUND SYSTEM: Nominal PLANNING : Comments : Bill Thompson performing s/w update. Ran sequence fits.lub.dt lubrication seq(engineering) ==================================================================================== DOY -- 97 INSTRUMENT STATUS: Nominal CDS GROUND SYSTEM: Nominal PLANNING : Comments : Bright Point studies did not execute properly. ==================================================================================== DOY -- 99 INSTRUMENT STATUS: Nominal CDS GROUND SYSTEM: Nominal PLANNING : Comments : Deleted files on cdsd1. ==================================================================================== DOY -- 100 INSTRUMENT STATUS: Nominal CDS GROUND SYSTEM: Nominal PLANNING : Bright Point campaign. Comments : ==================================================================================== DOY -- 101 INSTRUMENT STATUS: Nominal CDS GROUND SYSTEM: Nominal PLANNING : Intercal1/Bright Point Comments : System was not writing to cdsd4. Restarted s/w -- ok. ==================================================================================== DOY -- 102 INSTRUMENT STATUS: Nominal. Secondary Transputer SEU discovered. CDS GROUND SYSTEM: Nominal PLANNING : More XBP campaign Comments : ==================================================================================== DOY -- 103 INSTRUMENT STATUS: Nominal CDS GROUND SYSTEM: Nominal PLANNING : Comments : Installed new coms-mgr. ==================================================================================== DOY -- 104 INSTRUMENT STATUS: Nominal CDS GROUND SYSTEM: Nominal PLANNING : Comments : ==================================================================================== DOY -- 105 INSTRUMENT STATUS: Nominal CDS GROUND SYSTEM: Nominal PLANNING : Comments : GIS raw dumps. Some problems with slit 4 detector 2 during raw dumps. Not setting proper counts. ==================================================================================== DOY -- 106 INSTRUMENT STATUS: Nominal CDS GROUND SYSTEM: Nominal PLANNING : Bright Point campaign. GIS raw dumps. Comments : Performed s/w update to correct STM. ==================================================================================== DOY -- 107 INSTRUMENT STATUS: Nominal CDS GROUND SYSTEM: Nominal PLANNING : Change s/c pointing. Comments : Upload new s/w update; change in pointing put into state db. ==================================================================================== DOY -- 108 INSTRUMENT STATUS: Nominal CDS GROUND SYSTEM: Nominal. "Metronome Error" --Unknown cause or error.Rebooted cds8 PLANNING : Comments : ==================================================================================== DOY -- 109 INSTRUMENT STATUS: Nominal CDS GROUND SYSTEM: Nominal PLANNING : Run lubrication sequence. GIS raw dumps. Comments : ==================================================================================== DOY -- 110 INSTRUMENT STATUS: Nominal CDS GROUND SYSTEM: Nominal. However GS was flaky. PLANNING : GIS raw dumps. Comments : ==================================================================================== DOY -- 111 INSTRUMENT STATUS: Nominal CDS GROUND SYSTEM: Nominal PLANNING : GIS raw dumps. Comments : ==================================================================================== DOY -- 112 INSTRUMENT STATUS: Nominal CDS GROUND SYSTEM: Nominal PLANNING : Comments : s/c went into RMW mode. Guiding star lost. At start of TGRAD detector1 counts went sky-high. NRT was paused so we disabled GIS HV from EPS. Then AIEG+12V went to 313mA warning, so we sent cbeq12vf to turn it off & cbeg5vf as well. ==================================================================================== DOY -- 113 INSTRUMENT STATUS: Nominal CDS GROUND SYSTEM: Nominal PLANNING : Performed s/w update for new xcpt @ 23:00. Comments : ==================================================================================== DOY -- 114 INSTRUMENT STATUS: Nominal CDS GROUND SYSTEM: Nominal PLANNING : Comments : Deleted files from /fits-gli using a script from Bill Thompson. ==================================================================================== DOY -- 115 INSTRUMENT STATUS: Nominal CDS GROUND SYSTEM: Nominal PLANNING : Comments : Temp left actuator went high. Aborted all science. ==================================================================================== DOY -- 116 INSTRUMENT STATUS: Nominal CDS GROUND SYSTEM: Nominal PLANNING : Comments : Recovering from MCU problems last night. VDS immages ratty, reset VDS, still bad, must go to standby and reboot. Rebooted, ran NISAT. ==================================================================================== DOY -- 117 INSTRUMENT STATUS: Nominal CDS GROUND SYSTEM: Nominal PLANNING : JOP 12, 28; possibly recover VDS. Comments : Rebooted CDHS; chabged disk to /cdsr3; cleaned tape jukebox. ==================================================================================== DOY -- 118 INSTRUMENT STATUS: Nominal CDS GROUND SYSTEM: Nominal PLANNING : VDS Engineering Studies. Science Operations. Comments : ==================================================================================== DOY -- 119 INSTRUMENT STATUS: Nominal; GIS High Count Rate Anomaly. CDS GROUND SYSTEM: Nominal PLANNING : Comments : ==================================================================================== DOY -- 120 INSTRUMENT STATUS: Nominal CDS GROUND SYSTEM: Nominal PLANNING : Comments : Plan uplink failed.Sent dump requests before loading data to tables.Dont know why.Yes we dp cpt run twice w/out uploading. ==================================================================================== DOY -- 121 INSTRUMENT STATUS: Nominal CDS GROUND SYSTEM: Nominal PLANNING : Test GIS after high raw counts. Comments : changed /cdsfits to /cdsfits2 ==================================================================================== From the CDS Operations Management Team in the Space Science & Technology Department at CCLRC Rutherford Appleton Laboratory Site maintained by John Rainnie. Last revised on Friday ( 7/Sep/2001) at 14:10. |