![]() |
Scientific Operations | ![]() |
|
April 1996
====================================================================================
DOY -- 92
INSTRUMENT STATUS: Nominal
CDS GROUND SYSTEM: IWS Commanding Rate set to 3 seconds.
PLANNING :
Comments :
====================================================================================
DOY -- 93
INSTRUMENT STATUS: Nominal
CDS GROUND SYSTEM: Nominal
PLANNING :
Comments : Performed GIS raw dumps using slit 1 on detector 2.
Also performed dumps using slit 4 on detectors 1,2,3,4.
Upload problem CPT.
====================================================================================
DOY -- 94
INSTRUMENT STATUS: Nominal
CDS GROUND SYSTEM: Nominal
PLANNING : J3 Test - CDS running GIS.
Comments : Upload problem- CPT
====================================================================================
DOY -- 95
INSTRUMENT STATUS: Nominal
CDS GROUND SYSTEM: Nominal
PLANNING : J3 E/W Limb show.
Comments : Detector 3 trip.
New Alarm db
Command db
====================================================================================
DOY -- 96
INSTRUMENT STATUS: Nominal
CDS GROUND SYSTEM: Nominal
PLANNING :
Comments : Bill Thompson performing s/w update.
Ran sequence fits.lub.dt lubrication seq(engineering)
====================================================================================
DOY -- 97
INSTRUMENT STATUS: Nominal
CDS GROUND SYSTEM: Nominal
PLANNING :
Comments : Bright Point studies did not execute properly.
====================================================================================
DOY -- 99
INSTRUMENT STATUS: Nominal
CDS GROUND SYSTEM: Nominal
PLANNING :
Comments : Deleted files on cdsd1.
====================================================================================
DOY -- 100
INSTRUMENT STATUS: Nominal
CDS GROUND SYSTEM: Nominal
PLANNING : Bright Point campaign.
Comments :
====================================================================================
DOY -- 101
INSTRUMENT STATUS: Nominal
CDS GROUND SYSTEM: Nominal
PLANNING : Intercal1/Bright Point
Comments : System was not writing to cdsd4. Restarted s/w -- ok.
====================================================================================
DOY -- 102
INSTRUMENT STATUS: Nominal. Secondary Transputer SEU discovered.
CDS GROUND SYSTEM: Nominal
PLANNING : More XBP campaign
Comments :
====================================================================================
DOY -- 103
INSTRUMENT STATUS: Nominal
CDS GROUND SYSTEM: Nominal
PLANNING :
Comments : Installed new coms-mgr.
====================================================================================
DOY -- 104
INSTRUMENT STATUS: Nominal
CDS GROUND SYSTEM: Nominal
PLANNING :
Comments :
====================================================================================
DOY -- 105
INSTRUMENT STATUS: Nominal
CDS GROUND SYSTEM: Nominal
PLANNING :
Comments : GIS raw dumps.
Some problems with slit 4 detector 2 during raw dumps. Not
setting proper counts.
====================================================================================
DOY -- 106
INSTRUMENT STATUS: Nominal
CDS GROUND SYSTEM: Nominal
PLANNING : Bright Point campaign.
GIS raw dumps.
Comments : Performed s/w update to correct STM.
====================================================================================
DOY -- 107
INSTRUMENT STATUS: Nominal
CDS GROUND SYSTEM: Nominal
PLANNING : Change s/c pointing.
Comments : Upload new s/w update; change in pointing put into state db.
====================================================================================
DOY -- 108
INSTRUMENT STATUS: Nominal
CDS GROUND SYSTEM: Nominal. "Metronome Error" --Unknown cause or error.Rebooted cds8
PLANNING :
Comments :
====================================================================================
DOY -- 109
INSTRUMENT STATUS: Nominal
CDS GROUND SYSTEM: Nominal
PLANNING : Run lubrication sequence. GIS raw dumps.
Comments :
====================================================================================
DOY -- 110
INSTRUMENT STATUS: Nominal
CDS GROUND SYSTEM: Nominal. However GS was flaky.
PLANNING : GIS raw dumps.
Comments :
====================================================================================
DOY -- 111
INSTRUMENT STATUS: Nominal
CDS GROUND SYSTEM: Nominal
PLANNING : GIS raw dumps.
Comments :
====================================================================================
DOY -- 112
INSTRUMENT STATUS: Nominal
CDS GROUND SYSTEM: Nominal
PLANNING :
Comments : s/c went into RMW mode. Guiding star lost.
At start of TGRAD detector1 counts went sky-high. NRT was paused
so we disabled GIS HV from EPS.
Then AIEG+12V went to 313mA warning, so we sent cbeq12vf to turn
it off & cbeg5vf as well.
====================================================================================
DOY -- 113
INSTRUMENT STATUS: Nominal
CDS GROUND SYSTEM: Nominal
PLANNING : Performed s/w update for new xcpt @ 23:00.
Comments :
====================================================================================
DOY -- 114
INSTRUMENT STATUS: Nominal
CDS GROUND SYSTEM: Nominal
PLANNING :
Comments : Deleted files from /fits-gli using a script from Bill Thompson.
====================================================================================
DOY -- 115
INSTRUMENT STATUS: Nominal
CDS GROUND SYSTEM: Nominal
PLANNING :
Comments : Temp left actuator went high. Aborted all science.
====================================================================================
DOY -- 116
INSTRUMENT STATUS: Nominal
CDS GROUND SYSTEM: Nominal
PLANNING :
Comments : Recovering from MCU problems last night. VDS immages ratty, reset
VDS, still bad, must go to standby and reboot.
Rebooted, ran NISAT.
====================================================================================
DOY -- 117
INSTRUMENT STATUS: Nominal
CDS GROUND SYSTEM: Nominal
PLANNING : JOP 12, 28; possibly recover VDS.
Comments : Rebooted CDHS; chabged disk to /cdsr3; cleaned tape jukebox.
====================================================================================
DOY -- 118
INSTRUMENT STATUS: Nominal
CDS GROUND SYSTEM: Nominal
PLANNING : VDS Engineering Studies. Science Operations.
Comments :
====================================================================================
DOY -- 119
INSTRUMENT STATUS: Nominal; GIS High Count Rate Anomaly.
CDS GROUND SYSTEM: Nominal
PLANNING :
Comments :
====================================================================================
DOY -- 120
INSTRUMENT STATUS: Nominal
CDS GROUND SYSTEM: Nominal
PLANNING :
Comments : Plan uplink failed.Sent dump requests before loading data to
tables.Dont know why.Yes we dp cpt run twice w/out uploading.
====================================================================================
DOY -- 121
INSTRUMENT STATUS: Nominal
CDS GROUND SYSTEM: Nominal
PLANNING : Test GIS after high raw counts.
Comments : changed /cdsfits to /cdsfits2
====================================================================================
From the CDS Operations Management Team in the Space Science & Technology Department at CCLRC Rutherford Appleton Laboratory Site maintained by John Rainnie. Last revised on Friday ( 7/Sep/2001) at 14:10. |