April 1996
 
====================================================================================
DOY -- 92

INSTRUMENT STATUS: Nominal      
CDS GROUND SYSTEM: IWS Commanding Rate set to 3 seconds.     
PLANNING         : 
Comments	 : 
====================================================================================
DOY -- 93

INSTRUMENT STATUS: Nominal      
CDS GROUND SYSTEM: Nominal     
PLANNING         : 
Comments	 : Performed GIS raw dumps using slit 1 on detector 2.
		   Also performed dumps using slit 4 on detectors 1,2,3,4.
		   Upload problem CPT. 
====================================================================================
DOY -- 94

INSTRUMENT STATUS: Nominal      
CDS GROUND SYSTEM: Nominal     
PLANNING         : J3 Test - CDS running GIS.
Comments	 : Upload problem-  CPT
====================================================================================
DOY -- 95

INSTRUMENT STATUS: Nominal      
CDS GROUND SYSTEM: Nominal     
PLANNING         : J3 E/W Limb show.
Comments	 : Detector 3 trip.
		   New Alarm db
		       Command db
====================================================================================
DOY -- 96

INSTRUMENT STATUS: Nominal      
CDS GROUND SYSTEM: Nominal     
PLANNING         : 
Comments	 : Bill Thompson performing s/w update.
	           Ran sequence fits.lub.dt lubrication seq(engineering)
====================================================================================
DOY -- 97

INSTRUMENT STATUS: Nominal      
CDS GROUND SYSTEM: Nominal     
PLANNING         : 
Comments	 : Bright Point studies did not execute properly.
====================================================================================
DOY -- 99

INSTRUMENT STATUS: Nominal      
CDS GROUND SYSTEM: Nominal     
PLANNING         : 
Comments	 : Deleted files on cdsd1.
====================================================================================
DOY -- 100

INSTRUMENT STATUS: Nominal      
CDS GROUND SYSTEM: Nominal     
PLANNING         : Bright Point campaign.
Comments	 : 
====================================================================================
DOY -- 101

INSTRUMENT STATUS: Nominal      
CDS GROUND SYSTEM: Nominal     
PLANNING         : Intercal1/Bright Point 
Comments	 : System was not writing to cdsd4. Restarted s/w -- ok.
====================================================================================
DOY -- 102

INSTRUMENT STATUS: Nominal. Secondary Transputer SEU discovered.      
CDS GROUND SYSTEM: Nominal     
PLANNING         : More XBP campaign
Comments	 : 
====================================================================================
DOY -- 103

INSTRUMENT STATUS: Nominal      
CDS GROUND SYSTEM: Nominal     
PLANNING         : 
Comments	 : Installed new coms-mgr.
====================================================================================
DOY -- 104

INSTRUMENT STATUS: Nominal      
CDS GROUND SYSTEM: Nominal     
PLANNING         : 
Comments	 : 
====================================================================================
DOY -- 105

INSTRUMENT STATUS: Nominal      
CDS GROUND SYSTEM: Nominal     
PLANNING         : 
Comments	 : GIS raw dumps.
		   Some problems with slit 4 detector 2 during raw dumps. Not
		   setting proper counts.
====================================================================================
DOY -- 106

INSTRUMENT STATUS: Nominal      
CDS GROUND SYSTEM: Nominal     
PLANNING         : Bright Point campaign.
		   GIS raw dumps.
Comments	 : Performed s/w update to correct STM.
====================================================================================
DOY -- 107

INSTRUMENT STATUS: Nominal      
CDS GROUND SYSTEM: Nominal     
PLANNING         : Change s/c pointing.
Comments	 : Upload new s/w update; change in pointing put into state db.
====================================================================================
DOY -- 108

INSTRUMENT STATUS: Nominal      
CDS GROUND SYSTEM: Nominal. "Metronome Error" --Unknown cause or error.Rebooted cds8     
PLANNING         : 
Comments	 : 
====================================================================================
DOY -- 109

INSTRUMENT STATUS: Nominal      
CDS GROUND SYSTEM: Nominal     
PLANNING         : Run lubrication sequence. GIS raw dumps.
Comments	 : 
====================================================================================
DOY -- 110

INSTRUMENT STATUS: Nominal      
CDS GROUND SYSTEM: Nominal. However GS was flaky.
PLANNING         : GIS raw dumps.
Comments	 : 
====================================================================================
DOY -- 111

INSTRUMENT STATUS: Nominal      
CDS GROUND SYSTEM: Nominal     
PLANNING         : GIS raw dumps.
Comments	 : 
====================================================================================
DOY -- 112

INSTRUMENT STATUS: Nominal      
CDS GROUND SYSTEM: Nominal     
PLANNING         : 
Comments	 : s/c went into RMW mode. Guiding star lost.
		   At start of TGRAD detector1 counts went sky-high. NRT was paused
		   so we disabled GIS HV from EPS.
		   Then AIEG+12V went to 313mA warning, so we sent cbeq12vf to turn 
                   it off & cbeg5vf as well.
====================================================================================
DOY -- 113

INSTRUMENT STATUS: Nominal      
CDS GROUND SYSTEM: Nominal     
PLANNING         : Performed s/w update for new xcpt @ 23:00. 
Comments	 : 
====================================================================================
DOY -- 114

INSTRUMENT STATUS: Nominal      
CDS GROUND SYSTEM: Nominal     
PLANNING         : 
Comments	 : Deleted files from /fits-gli using a script from Bill Thompson. 
====================================================================================
DOY -- 115

INSTRUMENT STATUS: Nominal      
CDS GROUND SYSTEM: Nominal     
PLANNING         : 
Comments	 : Temp left actuator went high. Aborted all science.
====================================================================================
DOY -- 116

INSTRUMENT STATUS: Nominal      
CDS GROUND SYSTEM: Nominal     
PLANNING         : 
Comments	 : Recovering from MCU problems last night. VDS immages ratty, reset
		   VDS, still bad, must go to standby and reboot.
		   Rebooted, ran NISAT. 
====================================================================================
DOY -- 117

INSTRUMENT STATUS: Nominal      
CDS GROUND SYSTEM: Nominal     
PLANNING         : JOP 12, 28; possibly recover VDS.
Comments	 : Rebooted CDHS; chabged disk to /cdsr3; cleaned tape jukebox.
====================================================================================
DOY -- 118

INSTRUMENT STATUS: Nominal      
CDS GROUND SYSTEM: Nominal     
PLANNING         : VDS Engineering Studies. Science Operations.
Comments	 : 
====================================================================================
DOY -- 119

INSTRUMENT STATUS: Nominal; GIS High Count Rate Anomaly.      
CDS GROUND SYSTEM: Nominal     
PLANNING         : 
Comments	 : 
====================================================================================
DOY -- 120

INSTRUMENT STATUS: Nominal      
CDS GROUND SYSTEM: Nominal     
PLANNING         : 
Comments	 : Plan uplink failed.Sent dump requests before loading data to 
		   tables.Dont know why.Yes we dp cpt run twice w/out uploading.
====================================================================================
DOY -- 121

INSTRUMENT STATUS: Nominal      
CDS GROUND SYSTEM: Nominal     
PLANNING         : Test GIS after high raw counts.
Comments	 : changed /cdsfits to /cdsfits2
====================================================================================