Scientific Operations | ||
|
April 1997============================================================================== DATE: 1-Apr-1997 16:31:48 DOY: 91 OPERATIONS ENGINEER(S): G. Dimitoglou/C. Haskell/R. Yurow SCIENTIST: R. Thomas CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations COMMENTS: ============================================================================== DATE: 2-Apr-1997 16:31:48 DOY: 92 OPERATIONS ENGINEER(S): G. Dimitoglou/C. Haskell SCIENTIST: R. Thomas CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations COMMENTS: ============================================================================== DATE: 3-Apr-1997 16:31:48 DOY: 93 OPERATIONS ENGINEER(S): R. Yurow/C. Haskell SCIENTIST: R. Thomas CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Changed the following raster durations: 62/2 from 6149 to 6251 92/2 from 1556 to 1587 DAY PLAN: Science Operations COMMENTS: ============================================================================== DATE: 4-Apr-1997 DOY: 94 OPERATIONS ENGINEER(S): C. Haskell/R. Yurow SCIENTIST: R. Thomas CDS INSTRUMENT: SEU at 8005eecb. This location is the Science module and is a safe area. No reboot will be performed. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations COMMENTS: ============================================================================== DATE: 5-Apr-1997 DOY: 95 OPERATIONS ENGINEER(S): C. Haskell SCIENTIST: P. Brekke CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations COMMENTS: ============================================================================== DATE: 6-Apr-1997 DOY: 96 OPERATIONS ENGINEER(S): C. Haskell SCIENTIST: P. Brekke CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations COMMENTS: ============================================================================== DATE: 7-Apr-1997 DOY: 97 OPERATIONS ENGINEER(S): C. Haskell SCIENTIST: P. Brekke CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations COMMENTS: ============================================================================== DATE: 8-Apr-1997 DOY: 98 OPERATIONS ENGINEER(S): C. Haskell / R. Yurow SCIENTIST: P. Brekke CDS INSTRUMENT: A WATCHDOG error occured at 00:35 UT. LOBT was sent at 1:50 UT. The instrument was recovered nominally. Science was resumed at 07:11 UT. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations COMMENTS: ============================================================================== DATE: 9-Apr-1997 DOY: 99 OPERATIONS ENGINEER(S): C. Haskell / R. Yurow SCIENTIST: P. Brekke CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations COMMENTS: ============================================================================== DATE: 10-Apr-1997 DOY: 100 OPERATIONS ENGINEER(S): R. Yurow SCIENTIST: P. Brekke CDS INSTRUMENT: SEU on secondary science processor. Since this does not appear to be affecting science operations, reboot of the secondary processor will be delayed until after door close on DOY 101. SEU detected on the primary at location 800506C7 - Science module - no reboot will be necessary. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations COMMENTS: ============================================================================== DATE: 11-Apr-1997 DOY: 101 OPERATIONS ENGINEER(S): C. Haskell/R. Yurow SCIENTIST: P. Brekke CDS INSTRUMENT: Doors closed @ 13:56 UT today. script NIS_COM_9 (Dark Exposures) was run as part of NIS engineering work. 5 of 9 planned exposures were taken. CDS GROUND SYSTEM: Modified the following raster durations: 10/39 from 4145 to 4462 12/2 from 22 to 27 35/2 from 511 to 567 DAY PLAN: Science Operations COMMENTS: ============================================================================== DATE: 12-Apr-1997 DOY: 102 OPERATIONS ENGINEER(S): R. Yurow SCIENTIST: A. Fludra CDS INSTRUMENT: Doors opened at 20;49 UT. Performed lube study. Rebooted Secondary (Science) Processor. CDS GROUND SYSTEM: Nominal. DAY PLAN: Open Doors, Lubrication Study COMMENTS: ============================================================================== DATE: 13-Apr-1997 DOY: 103 OPERATIONS ENGINEER(S): R. Yurow SCIENTIST: A. Fludra CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations COMMENTS: ============================================================================== DATE: 14-Apr-1997 DOY: 104 OPERATIONS ENGINEER(S): C. Haskell SCIENTIST: A. Fludra CDS INSTRUMENT: VDS register A setup failure. VDS rebooted. CDS GROUND SYSTEM: Updated the following raster durations: 10/23 from 6281 to 6329 10/41 from 8894 to 9373 11/34 from 4482 to 4683 34/15 from 278 to 285 36/36 from 826 to 917 71/6 from 155 to 167 127/2 from 1060 to 1144 DAY PLAN: Science Operations COMMENTS: ============================================================================== DATE: 15-Apr-1997 DOY: 105 OPERATIONS ENGINEER(S): C. Haskell / R. Yurow SCIENTIST: A. Fludra CDS INSTRUMENT: An SEU occured in the primary processor memory space. Since the SEU was in the science module, no reboot was needed. CDS GROUND SYSTEM: Changed the fits archive disk to /cdsfits10. DAY PLAN: Science Operations COMMENTS: ============================================================================== DATE: 16-Apr-1997 DOY: 106 OPERATIONS ENGINEER(S): C. Haskell / R. Yurow SCIENTIST: A. Fludra CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations COMMENTS: ============================================================================== DATE: 17-Apr-1997 DOY: 107 OPERATIONS ENGINEER(S): C. Haskell / R. Yurow SCIENTIST: A. Fludra CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations COMMENTS: ============================================================================== DATE: 18-Apr-1997 DOY: 108 OPERATIONS ENGINEER(S): C. Haskell / R. Yurow SCIENTIST: A. Fludra CDS INSTRUMENT: A timetagged command of 'cbmslitn 0' was included in the DCS which caused an slit invalid error. The slit was recovered to its normal position and science resumed. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations COMMENTS: ============================================================================== DATE: 19-Apr-1997 DOY: 109 OPERATIONS ENGINEER(S): C. Haskell SCIENTIST: D. Zarro CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations COMMENTS: ============================================================================== DATE: 20-Apr-1997 DOY: 110 OPERATIONS ENGINEER(S): C. Haskell SCIENTIST: D. Zarro CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations COMMENTS: ============================================================================== DATE: 21-Apr-1997 DOY: 111 OPERATIONS ENGINEER(S): C. Haskell/R. Yurow SCIENTIST: D. Zarro CDS INSTRUMENT: Found that 6 deferred commands were not loaded to the instrument when the plan was loaded on April 18. One of the deferred commands was to run 3 other studies. 2 of the studies were lost, and the third was able to be run. The cause is under investigation. Also, rebooted the secondary due to an SEU. CDS GROUND SYSTEM: Updated the following raster durations: 10/32 from 6286 to 6333 10/42 from 2330 to 2545 10/43 from 7768 to 8145 13/15 from 2649 to 3325 36/37 from 880 to 978 38/15 from 4123 to 4807 93/1 from 2904 to 2933 112/2 from 2212 to 2313 125/1 from 4871 to 4889 133/1 from 748 to 789 134/1 from 2649 to 3065 DAY PLAN: Science Operations COMMENTS: ============================================================================== DATE: 22-Apr-1997 DOY: 112 OPERATIONS ENGINEER(S): C. Haskell SCIENTIST: D. Zarro CDS INSTRUMENT: SEU detected at 80065ebf (Compression module), which is a safe area. No reboot necessary. CDS GROUND SYSTEM: Changed archive disk to /cdsd2. DAY PLAN: Science Operations COMMENTS: ============================================================================== DATE: 23-Apr-1997 DOY: 113 OPERATIONS ENGINEER(S): C. Haskell SCIENTIST: D. Zarro CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Network outage between GSFC and RAL has delayed a software update. DAY PLAN: Science Operations COMMENTS: ============================================================================== DATE: 24-Apr-1997 DOY: 114 OPERATIONS ENGINEER(S): C. Haskell SCIENTIST: D. Zarro CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Network outage continues... DAY PLAN: Science Operations COMMENTS: ============================================================================== DATE: 25-Apr-1997 DOY: 115 OPERATIONS ENGINEER(S): C. Haskell SCIENTIST: D. Zarro CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Network outage has been fixed. S/W update will be done on Tuesday of next week. A DCS overflow occurred while loading the plan, this will be corrected on Sunday. DAY PLAN: Science Operations COMMENTS: ============================================================================== DATE: 26-Apr-1997 DOY: 116 OPERATIONS ENGINEER(S): C. Haskell SCIENTIST: L.H.-M. CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal DAY PLAN: Science Operations COMMENTS: ============================================================================== DATE: 27-Apr-1997 DOY: 117 OPERATIONS ENGINEER(S): C. Haskell SCIENTIST: L.H.-M. CDS INSTRUMENT: Corrected the DCS overflow problem. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations COMMENTS: ============================================================================== DATE: 28-Apr-1997 DOY: 118 OPERATIONS ENGINEER(S): C. Haskell / R. Yurow SCIENTIST: L.H.-M. CDS INSTRUMENT: An SEU was detected in the secondary processor memory space. The secondary (science) processor was restarted at 21:53 UT. Also, it was discovered that 3 studies were run with a slit problem. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations COMMENTS: ============================================================================== DATE: 29-Apr-1997 DOY: 119 OPERATIONS ENGINEER(S): C. Haskell / R. Yurow SCIENTIST: L.H.-M. CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal DAY PLAN: Science Operations COMMENTS: ============================================================================== DATE: 30-Apr-1997 DOY: 120 OPERATIONS ENGINEER(S): C. Haskell / R. Yurow SCIENTIST: L.H.-M. CDS INSTRUMENT: A Watchdog error occured on DOY 119 at ~23:13 UT. The instrument was recovered at 2:41 UT. The science plan resumed at 9:02 UT. The recovery was nominal. CDS GROUND SYSTEM: Processing of CDROM data continues. DAY PLAN: Science Operations COMMENTS: ============================================================================== From the CDS Operations Management Team in the Space Science & Technology Department at CCLRC Rutherford Appleton Laboratory Site maintained by John Rainnie. Last revised on Friday ( 7/Sep/2001) at 14:10. |