DATE:  1-Apr-1997 16:31:48
DOY: 91
OPERATIONS ENGINEER(S): G. Dimitoglou/C. Haskell/R. Yurow
SCIENTIST: R. Thomas
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations
COMMENTS:
==============================================================================
DATE:  2-Apr-1997 16:31:48
DOY: 92
OPERATIONS ENGINEER(S): G. Dimitoglou/C. Haskell
SCIENTIST: R. Thomas
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations
COMMENTS:
==============================================================================
DATE:  3-Apr-1997 16:31:48
DOY: 93
OPERATIONS ENGINEER(S): R. Yurow/C. Haskell
SCIENTIST: R. Thomas
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Changed the following raster durations:
	62/2 from 6149 to 6251
	92/2 from 1556 to 1587
DAY PLAN: Science Operations
COMMENTS:
==============================================================================
DATE:  4-Apr-1997
DOY: 94
OPERATIONS ENGINEER(S): C. Haskell/R. Yurow
SCIENTIST: R. Thomas
CDS INSTRUMENT: SEU at 8005eecb.  This location is the Science module 
 and is a safe area.  No reboot will be performed.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations
COMMENTS:
==============================================================================
DATE:  5-Apr-1997
DOY: 95
OPERATIONS ENGINEER(S): C. Haskell
SCIENTIST: P. Brekke
CDS INSTRUMENT:  Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations
COMMENTS:
==============================================================================
DATE:  6-Apr-1997
DOY: 96
OPERATIONS ENGINEER(S): C. Haskell
SCIENTIST: P. Brekke
CDS INSTRUMENT:  Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations
COMMENTS:
==============================================================================
DATE:  7-Apr-1997
DOY: 97
OPERATIONS ENGINEER(S): C. Haskell
SCIENTIST: P. Brekke
CDS INSTRUMENT:  Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations
COMMENTS:
==============================================================================
DATE:  8-Apr-1997
DOY: 98
OPERATIONS ENGINEER(S): C. Haskell / R. Yurow
SCIENTIST: P. Brekke
CDS INSTRUMENT: 
  A WATCHDOG error occured at 00:35 UT.  LOBT was sent at 1:50 UT.
  The instrument was recovered nominally.  Science was resumed at 
  07:11 UT.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations
COMMENTS:
==============================================================================
DATE:  9-Apr-1997
DOY: 99
OPERATIONS ENGINEER(S): C. Haskell / R. Yurow
SCIENTIST: P. Brekke
CDS INSTRUMENT:  Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations
COMMENTS:
==============================================================================
DATE:  10-Apr-1997
DOY: 100
OPERATIONS ENGINEER(S): R. Yurow
SCIENTIST: P. Brekke
CDS INSTRUMENT: 
  SEU on secondary science processor.  Since this does not appear to be
  affecting science operations, reboot of the secondary processor will
  be delayed until after door close on DOY 101.
  SEU detected on the primary at location 800506C7 - Science module -
  no reboot will be necessary.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations
COMMENTS:
==============================================================================
DATE:  11-Apr-1997
DOY: 101
OPERATIONS ENGINEER(S): C. Haskell/R. Yurow
SCIENTIST: P. Brekke
CDS INSTRUMENT:  
  Doors closed @ 13:56 UT today.
  script NIS_COM_9 (Dark Exposures) was run as part of NIS engineering
  work. 5 of 9 planned exposures were taken.
CDS GROUND SYSTEM: 
 Modified the following raster durations:
 10/39 from 4145 to 4462
 12/2 from 22 to 27
 35/2 from 511 to 567
DAY PLAN: Science Operations
COMMENTS:
==============================================================================
DATE:  12-Apr-1997
DOY: 102
OPERATIONS ENGINEER(S): R. Yurow
SCIENTIST: A. Fludra
CDS INSTRUMENT: 
  Doors opened at 20;49 UT. 
  Performed lube study.  Rebooted Secondary (Science) Processor.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Open Doors, Lubrication Study
COMMENTS:
==============================================================================
DATE:  13-Apr-1997
DOY: 103
OPERATIONS ENGINEER(S): R. Yurow
SCIENTIST: A. Fludra
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations
COMMENTS:
==============================================================================
DATE:  14-Apr-1997
DOY: 104
OPERATIONS ENGINEER(S): C. Haskell
SCIENTIST: A. Fludra
CDS INSTRUMENT: VDS register A setup failure.  VDS rebooted.
CDS GROUND SYSTEM: Updated the following raster durations:
 10/23 from 6281 to 6329
 10/41 from 8894 to 9373
 11/34 from 4482 to 4683
 34/15 from 278 to 285
 36/36 from 826 to 917
 71/6 from 155 to 167
 127/2 from 1060 to 1144
DAY PLAN: Science Operations
COMMENTS:
==============================================================================
DATE:  15-Apr-1997
DOY: 105
OPERATIONS ENGINEER(S): C. Haskell / R. Yurow
SCIENTIST: A. Fludra
CDS INSTRUMENT: 
  An SEU occured in the primary processor memory space.  Since the SEU was 
  in the science module, no reboot was needed.
CDS GROUND SYSTEM: 
  Changed the fits archive disk to /cdsfits10.
DAY PLAN: Science Operations
COMMENTS:
==============================================================================
DATE:  16-Apr-1997
DOY: 106
OPERATIONS ENGINEER(S): C. Haskell / R. Yurow
SCIENTIST: A. Fludra
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations
COMMENTS:
==============================================================================
DATE:  17-Apr-1997
DOY: 107
OPERATIONS ENGINEER(S): C. Haskell / R. Yurow
SCIENTIST: A. Fludra
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations
COMMENTS:
==============================================================================
DATE:  18-Apr-1997
DOY: 108
OPERATIONS ENGINEER(S): C. Haskell / R. Yurow
SCIENTIST: A. Fludra
CDS INSTRUMENT: A timetagged command of 'cbmslitn 0' was included in the 
 DCS which caused an slit invalid error.  The slit was recovered to its
 normal position and science resumed.  
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations
COMMENTS:
==============================================================================
DATE:  19-Apr-1997
DOY: 109
OPERATIONS ENGINEER(S): C. Haskell 
SCIENTIST: D. Zarro
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations
COMMENTS:
==============================================================================
DATE:  20-Apr-1997
DOY: 110
OPERATIONS ENGINEER(S): C. Haskell
SCIENTIST: D. Zarro
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations
COMMENTS:
==============================================================================
DATE:  21-Apr-1997
DOY: 111
OPERATIONS ENGINEER(S): C. Haskell/R. Yurow
SCIENTIST: D. Zarro
CDS INSTRUMENT: Found that 6 deferred commands were not loaded to the
 instrument when the plan was loaded on April 18.  One of the deferred
 commands was to run 3 other studies.  2 of the studies were lost, and
 the third was able to be run.  The cause is under investigation.  Also,
 rebooted the secondary due to an SEU. 
CDS GROUND SYSTEM: Updated the following raster durations:
 10/32 from 6286 to 6333
 10/42 from 2330 to 2545
 10/43 from 7768 to 8145
 13/15 from 2649 to 3325
 36/37 from 880 to 978
 38/15 from 4123 to 4807 
 93/1 from 2904 to 2933
 112/2 from 2212 to 2313
 125/1 from 4871 to 4889
 133/1 from 748 to 789
 134/1 from 2649 to 3065
DAY PLAN: Science Operations
COMMENTS:
==============================================================================
DATE:  22-Apr-1997
DOY: 112
OPERATIONS ENGINEER(S): C. Haskell
SCIENTIST: D. Zarro
CDS INSTRUMENT: SEU detected at 80065ebf (Compression module), which
 is a safe area.  No reboot necessary.
CDS GROUND SYSTEM: Changed archive disk to /cdsd2.  
DAY PLAN: Science Operations
COMMENTS:
==============================================================================
DATE:  23-Apr-1997
DOY: 113
OPERATIONS ENGINEER(S): C. Haskell
SCIENTIST: D. Zarro
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Network outage between GSFC and RAL has delayed a 
 software update.    
DAY PLAN: Science Operations
COMMENTS:
==============================================================================
DATE:  24-Apr-1997
DOY: 114
OPERATIONS ENGINEER(S): C. Haskell
SCIENTIST: D. Zarro
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Network outage continues...    
DAY PLAN: Science Operations
COMMENTS:
==============================================================================
DATE:  25-Apr-1997
DOY: 115
OPERATIONS ENGINEER(S): C. Haskell
SCIENTIST: D. Zarro
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Network outage has been fixed.  S/W update will
 be done on Tuesday of next week.  A DCS overflow occurred while
 loading the plan, this will be corrected on Sunday.  
DAY PLAN: Science Operations
COMMENTS:
==============================================================================
DATE:  26-Apr-1997
DOY: 116
OPERATIONS ENGINEER(S): C. Haskell
SCIENTIST: L.H.-M.
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal    
DAY PLAN: Science Operations
COMMENTS:
==============================================================================
DATE:  27-Apr-1997
DOY: 117
OPERATIONS ENGINEER(S): C. Haskell
SCIENTIST: L.H.-M.
CDS INSTRUMENT: Corrected the DCS overflow problem.
CDS GROUND SYSTEM: Nominal.     
DAY PLAN: Science Operations
COMMENTS:
==============================================================================
DATE:  28-Apr-1997
DOY: 118
OPERATIONS ENGINEER(S): C. Haskell / R. Yurow
SCIENTIST: L.H.-M.
CDS INSTRUMENT: 
  An SEU was detected in the secondary processor memory space.  The 
  secondary (science) processor was restarted at 21:53 UT.  Also, it 
  was discovered that 3 studies were run with a slit problem.  
CDS GROUND SYSTEM: Nominal.  
DAY PLAN: Science Operations
COMMENTS:
==============================================================================
DATE:  29-Apr-1997
DOY: 119
OPERATIONS ENGINEER(S): C. Haskell / R. Yurow
SCIENTIST: L.H.-M.
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal    
DAY PLAN: Science Operations
COMMENTS: 
==============================================================================
DATE:  30-Apr-1997
DOY: 120
OPERATIONS ENGINEER(S): C. Haskell / R. Yurow
SCIENTIST: L.H.-M.
CDS INSTRUMENT: 
  A Watchdog error occured on DOY 119 at ~23:13 UT.  The instrument was 
  recovered at 2:41 UT.  The science plan resumed at 9:02 UT.  The recovery
  was nominal.
CDS GROUND SYSTEM: 
  Processing of CDROM data continues.  
DAY PLAN: Science Operations
COMMENTS: 
==============================================================================








From the CDS Operations Management Team in the Space Science & Technology Department at CCLRC Rutherford Appleton Laboratory
Site maintained by John Rainnie.
Last revised on Friday ( 7/Sep/2001) at 14:10.