Scientific Operations | ||
|
Aprl 1998============================================================================== DATE: 01-April-1998 DOY: 091 OPERATIONS ENGINEER(S): R. Yurow SCIENTIST: A. Fludra CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================== DATE: 02-April-1998 DOY: 092 OPERATIONS ENGINEER(S): R. Yurow SCIENTIST: A. Fludra CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================== DATE: 03-April-1998 DOY: 093 OPERATIONS ENGINEER(S): C. Haskell/R. Yurow SCIENTIST: A. Fludra CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================== DATE: 04-April-1998 DOY: 094 OPERATIONS ENGINEER(S): C. Haskell/W. Hammond SCIENTIST: S. White CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Changed the FITS disk to /cdsfits19 DAY PLAN: Science Operations. COMMENTS: ============================================================================== DATE: 05-April-1998 DOY: 095 OPERATIONS ENGINEER(S): C. Haskell/E. Donaldson SCIENTIST: S. White CDS INSTRUMENT: Watchdog error occurred at 10:56 UT. LOBT was sent at 12:44 UT, and science resumed at 15:00 UT. During the recovery, the GIS software patch required reloading. CDS was nominal after the recovery. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================== DATE: 06-April-1998 DOY: 096 OPERATIONS ENGINEER(S): C. Haskell / R. Yurow SCIENTIST: S. White CDS INSTRUMENT: A parity error was detected in the primary processor memory space. Since the error occured in a safe location, no reboot was necessary. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================== DATE: 07-April-1998 DOY: 097 OPERATIONS ENGINEER(S): C. Haskell / R. Yurow SCIENTIST: S. White CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================== DATE: 08-April-1998 DOY: 098 OPERATIONS ENGINEER(S): C. Haskell / R. Yurow SCIENTIST: S. White CDS INSTRUMENT: A parity error was detected in the primary processor memory space. Since the error occured in a safe location, no reboot was necessary. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================== DATE: 09-April-1998 DOY: 099 OPERATIONS ENGINEER(S): C. Haskell / R. Yurow SCIENTIST: S. White CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================== DATE: 10-April-1998 DOY: 100 OPERATIONS ENGINEER(S): C. Haskell / R. Yurow SCIENTIST: S. White CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: A software update was performed. DAY PLAN: Science Operations. COMMENTS: ============================================================================== DATE: 11-April-1998 DOY: 101 OPERATIONS ENGINEER(S): C. Haskell SCIENTIST: C. Haskell CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================== DATE: 12-April-1998 DOY: 102 OPERATIONS ENGINEER(S): R. Yurow SCIENTIST: C. Haskell CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================== DATE: 13-April-1998 DOY: 103 OPERATIONS ENGINEER(S): C. Haskell / R. Yurow SCIENTIST: C. Haskell CDS INSTRUMENT: A parity error was detected in the primary processor memory space. Since the parity error was in an unsafe location, it was decided to reboot the instrument. The science plan was halted at 20:00 UT and the reboot was completed at 21:07 UT. However, the new sceince plan could not be loaded before commanding was lost at 21:10 UT. Therefore, the new science plan was loaded at 23:42 after commanding was regained. A second parity error was detected in the secondary (science) processor memory space. This parity error was cleared as part of the instrument reboot. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================== DATE: 14-April-1998 DOY: 104 OPERATIONS ENGINEER(S): C. Haskell / R. Yurow SCIENTIST: C. Haskell CDS INSTRUMENT: CDS was rebooted at 19:27 UT in order to correct a GIS anomaly. The science plan was restarted at 21:10 and the GIS appears to be nominal after the reboot. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================== DATE: 15-April-1998 DOY: 105 OPERATIONS ENGINEER(S): C. Haskell / R. Yurow SCIENTIST: C. Haskell CDS INSTRUMENT: A parity error was detected in the secondary (science) processor memory space. The secondary processor was rebooted at 19:13 UT. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================== DATE: 16-April-1998 DOY: 106 OPERATIONS ENGINEER(S): C. Haskell / R. Yurow SCIENTIST: C. Haskell CDS INSTRUMENT: A WATCHDOG error occured at 03:16 UT. The instrument reboot was completed at 5:03 UT and the science plan was resumed at 5:40 UT. CDS is nominal after the reboot. CDS GROUND SYSTEM: The following studies were imported to the EOF: ar_mon_39.def coho33_4.def cole4w_40.def stat33w_5.def stat33w_6.def DAY PLAN: Science Operations. COMMENTS: ============================================================================== DATE: 17-April-1998 DOY: 107 OPERATIONS ENGINEER(S): C. Haskell / R. Yurow SCIENTIST: C. Haskell CDS INSTRUMENT: Doors were closed at 15:01 UT for spacecraft maneuvers. CDS GROUND SYSTEM: Nominal. DAY PLAN: Close Doors, Science Operations. COMMENTS: ============================================================================== DATE: 18-April-1998 DOY: 108 OPERATIONS ENGINEER(S): C. Haskell SCIENTIST: A. Fludra CDS INSTRUMENT: A lubrication study was performed at 12:00 UT. Doors were opened at 20:12 UT. A SEU in the secondary (science) processor memory space caused the secondary processor to fail sometime during the day. As a result, no science data was collected. CDS GROUND SYSTEM: Nominal. DAY PLAN: Open Doors, Lubrication Study, Science Operations. COMMENTS: ============================================================================== DATE: 19-April-1998 DOY: 109 OPERATIONS ENGINEER(S): C. Haskell SCIENTIST: A. Fludra CDS INSTRUMENT: A WATCHDOG error occured at 09:15 UT. The probable cause of this error was a communication deadlock between the primary processor and the secondary (science) processor. It is theorized the seconary processor had failed on DOY 108 after due to an SEU. The instrument reboot was completed at 14:20 UT and the science plan was resumed at 15:30 UT. CDS is nominal after the reboot. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================== DATE: 20-April-1998 DOY: 110 OPERATIONS ENGINEER(S): C. Haskell / R. Yurow SCIENTIST: A. Fludra CDS INSTRUMENT: Due to a massive CME on the southwest limb, a proton storm has encircled the satellite. This event is reminiscent of the one observed on November 6, 1997. Observations will continue with ============================================================================== DATE: 21-April-1998 DOY: 111 OPERATIONS ENGINEER(S): C. Haskell / R. Yurow SCIENTIST: A. Fludra CDS INSTRUMENT: During the telemetry submode transition at 20:00 UT, a process deadlock occured on CDS and the instrument stoped sending science packets. CDS was restarted at 20:31 UT and the recovery procedures were completed at 23:36 UT. The science plan resumed at 00:15 UT on DOY 112. Prior to this anomally, a parity error was detected on the primary processor. The parity error was cleared during the reboot. The high voltages on each of the GIS detectors was set to 0 to preserve the detectors during the proton storm. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================== DATE: 23-April-1998 DOY: 113 OPERATIONS ENGINEER(S): C. Haskell / R. Yurow SCIENTIST: A. Fludra CDS INSTRUMENT: A Setup Register A Failure system error was detected on the NIS. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================== DATE: 24-April-1998 DOY: 114 OPERATIONS ENGINEER(S): C. Haskell / R. Yurow SCIENTIST: A. Fludra CDS INSTRUMENT: One run of the flat field calibration study was performed at 16:56 UT. A telemetry submode switch at 19:05 UT caused CDS to cease responding commands and sending telemetry. CDS was rebooted at 21:13 UT and the science planned resumed at 00:00 UT on DOY 115 CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================== DATE: 25-April-1998 DOY: 115 OPERATIONS ENGINEER(S): E. Donaldson/W. Hammond SCIENTIST: P. Young CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================== DATE: 26-April-1998 DOY: 116 OPERATIONS ENGINEER(S): E. Donaldson/W. Hammond SCIENTIST: P. Young CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================== DATE: 27-April-1998 DOY: 117 OPERATIONS ENGINEER(S): C. Haskell/R. Yurow SCIENTIST: P. Young CDS INSTRUMENT: Secondary and Primary SEUs were recorded. The primary was in a safe location. The secondary was rebooted at 18:38 UT. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================== DATE: 28-April-1998 DOY: 118 OPERATIONS ENGINEER(S): C. Haskell / R. Yurow SCIENTIST: P. Young CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================== DATE: 29-April-1998 DOY: 119 OPERATIONS ENGINEER(S): C. Haskell / R. Yurow SCIENTIST: P. Young CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: Post flare observations were conducted from 17:41 UT onward. ============================================================================== DATE: 30-April-1998 DOY: 120 OPERATIONS ENGINEER(S): C. Haskell / R. Yurow SCIENTIST: P. Young CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================== From the CDS Operations Management Team in the Space Science & Technology Department at CCLRC Rutherford Appleton Laboratory Site maintained by John Rainnie. Last revised on Friday ( 7/Sep/2001) at 14:10. |