August 2003
 
=============================================================================
DATE:1-Aug-2003
DOY: 213
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: J. Ireland
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:2-Aug-2003
DOY: 214
OPERATIONS ENGINEER(S): J. Siedel
SCIENTIST: J. Ireland
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:3-Aug-2003
DOY: 215
OPERATIONS ENGINEER(S): C. King
SCIENTIST: J. Ireland
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:4-Aug-2003
DOY: 216
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: T. Kucera
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: 
  The IWS command rate was changed to 1/3 sec. for faster commanding on a
good station.
  The IWS command rate was changed back to 1/10 sec. for commanding on
DSN-27.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:5-Aug-2003
DOY: 217
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: T. Kucera
CDS INSTRUMENT: 
  GIS Detectors 3 and 4 Tripped at 09:13 UT.  This event occured while the 
G2AL_V4B study was running.  This study and GSET (66) was defined for quiet 
sun. However, the study was not run on quiet sun.
  The study itself is a sit and stare study using slit 2.  Counts were
initially elevated when the study started at 8:07 UT.  As an active region
rotated into the field of view, the number of counts on the detectors quickly
spiked until detectors 3 and 4 were finally safed due to excessive count 
rates. 
  GIS Detectors 3 and 4 were recovered at 16:32 UT.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:6-Aug-2003
DOY: 218
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: T. Kucera
CDS INSTRUMENT: 
  Due to insufficient NRT the science plan will begin at 00:00 UT (DOY 219).
This will leave CDS idle from 22:00 UT - 00:00 UT.
  A possibly unnecessary pointing adjustment was made at 00:06 UT (DOY 219)
in order to get the plan to run.  Due to late NRT, the plan was not quite
uploaded in time.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:7-Aug-2003
DOY: 219
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: T. Kucera
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:8-Aug-2003
DOY: 220
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: T. Kucera
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: 
  A test of a new version of CPT was run from 19:15 UT to 20:45 UT.  The test
involved running a VIEWF study at [0, -962] (the south pole) then running
the ARC_CAL study at the same location.  Because the initial VIEWF study run
during a gap in contact, a second VIEWF was scheduled to run at 20:35 UT.
  Unfortunately, due to operator error the rest of the day's plan could not
be loaded in time.  Instead, the science plan will resume at 22:00 UT with
the Hilda AR Obs.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:9-Aug-2003
DOY: 221
OPERATIONS ENGINEER(S): J. Seidel / C. King
SCIENTIST: T. Kucera
CDS INSTRUMENT: 
  A Primary event error was detected at address #8007a1f3.  This location is
in Sequence Table 34, so it should be safe.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:10-Aug-2003
DOY: 222
OPERATIONS ENGINEER(S): J. Seidel / C. King
SCIENTIST: T. Kucera
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:11-Aug-2003
DOY: 223
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: P. Gallagher
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:12-Aug-2003
DOY: 224
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: P. Gallagher
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: 
  The following study was imported to the EOF:
    g2ns_2.def
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:13-Aug-2003
DOY: 225
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: P. Gallagher
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: 
  The following studies were imported to the EOF:
    jop169_c_107.def
    jop169_f_1.def
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:14-Aug-2003
DOY: 226
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: P. Gallagher
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
  Goldstone Passes (DSN-27, 16 & 46) Unreliable due to network problems.  
DSN-66 is only commandable pass at this time.
=============================================================================
DATE:15-Aug-2003
DOY: 227
OPERATIONS ENGINEER(S): On Call
SCIENTIST: P. Gallagher
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
  Goldstone Passes (DSN-27, 16 & 46) Unreliable due to network problems.  
DSN-66 is only commandable pass at this time.
=============================================================================
DATE:16-Aug-2003
DOY: 228
OPERATIONS ENGINEER(S): C. Maroney
SCIENTIST: P. Gallagher
CDS INSTRUMENT: 
  A Mechanism Lubrication was completed at 15:00 UT.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
  Goldstone Passes (DSN-27, 16 & 46) Unreliable due to network problems.  
DSN-66 is only commandable pass at this time.  However DSN-66 was having 
telemetry drop-outs during the Mechanism Lubrication.
=============================================================================
DATE:17-Aug-2003
DOY: 229
OPERATIONS ENGINEER(S): On Call
SCIENTIST: P. Gallagher
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
=============================================================================
DATE:18-Aug-2003
DOY: 230
OPERATIONS ENGINEER(S): C. Maroney
SCIENTIST: A. Fludra
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: 
  The IWS command rate was changed to 1/10 sec. for commanding on DSN-27.
  The following raster duration changes were made:
    ARDIAG_2    rid/11     var/106    5083s - 5184s
    JOP169_C    rid/11     var/115    5025s - 5029s
    JOP169_F    rid/235    var/1       565s -  582s
DAY PLAN: Science Operations.
COMMENTS:
=============================================================================
DATE:19-Aug-2003
DOY: 231
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: A. Fludra
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:20-Aug-2003
DOY: 232
OPERATIONS ENGINEER(S): R. Yurow
SCIENTIST: A. Fludra
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:21-Aug-2003
DOY: 233
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: A. Fludra
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: 
  A Telemetry Submode Switch (from Submode 6 to 5) occurred at 18:00 UT.
CDS Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:22-Aug-2003
DOY: 234
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: A. Fludra
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:23-Aug-2003
DOY: 235
OPERATIONS ENGINEER(S): C. Maroney
SCIENTIST: A. Fludra
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:24-Aug-2003
DOY: 236
OPERATIONS ENGINEER(S): J. Siedel / C. King
SCIENTIST: A. Fludra
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:25-Aug-2003
DOY: 237
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: J. Ireland
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:26-Aug-2003
DOY: 238
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: J. Ireland
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:27-Aug-2003
DOY: 239
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: J. Ireland
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: 
  A Telemetry Submode Switch (from Submode 5 to 6) occurred at 15:40 UT.
CDS Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:28-Aug-2003
DOY: 240
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: J. Ireland
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:29-Aug-2003
DOY: 241
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: J. Ireland
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:30-Aug-2003
DOY: 242
OPERATIONS ENGINEER(S): J. Seidel / C. King
SCIENTIST: J. Ireland
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:31-Aug-2003
DOY: 243
OPERATIONS ENGINEER(S): J. Seidel / C. King
SCIENTIST: J. Ireland
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================




From the CDS Operations Management Team in the Space Science & Technology Department at CCLRC Rutherford Appleton Laboratory
Site maintained by John Rainnie.
Last revised on Friday ( 2/Aug/2002) at 10:45.