Scientific Operations | ![]() |
|
August 1996
==============================================================================
AUGUST 1, 1996 -- 204
INSTRUMENT STATUS: nominal
CDS GROUND SYSTEM: nominal, ftp'd studies tdq33_1 and nis_ff_1_1 to EOF, &
changed the fits disk to /cdsfits4.
PLANNING : JOP021
=====
AUGUST 2, 1996 -- 205
INSTRUMENT STATUS: nominal, ran the lubrication sequence
CDS GROUND SYSTEM: nominal
PLANNING : JOP021 & part of JOP018
=====
AUGUST 3, 1996 -- 206
INSTRUMENT STATUS: nominal, ran feature tracking (@ 22:30)
CDS GROUND SYSTEM: nominal
PLANNING : no JOPs planned
=====
AUGUST 4, 1996 -- 207
INSTRUMENT STATUS: nominal
CDS GROUND SYSTEM: nominal
PLANNING : no JOPs planned
=====
AUGUST 5, 1996 -- 208
INSTRUMENT STATUS: nominal
CDS GROUND SYSTEM: nominal, imported the following studies: o_trlmf1_9,
o_trlmf2_2, o_ntherm_1, nsgscan1_1, cloops1_2, cloops2_2.
PLANNING : no JOPs planned
=====
AUGUST 6, 1996 -- 209
INSTRUMENT STATUS: nominal
CDS GROUND SYSTEM: Software update, imported the following studies to EOF:
chmap_a_1, chmap_b_2, chbopt1_1, htbndss1_1, coho22_3.
PLANNING : JOP001
=====
AUGUST 7, 1996 -- 210
INSTRUMENT STATUS: nominal.
Two studies, PY24W/v5 (Prominence Temperature Diag.)
were not run due to an accidentally deleted VDS window
table. The table was deleted while manually editing the
LTB file and associated CVT files in order to correct
for a previous switch in table indexes performed on DOY
209. This switch was done to allow a plan which was
created by CPT with the /NEW switch set to be uploaded
without aborting the studie(s) which were currently
running.
CDS GROUND SYSTEM: Software crash of the Comms Manager. Otherwise Nominal.
PLANNING : JOP 1
Collaberation with Yohkoh/SXT
=====
AUGUST 8, 1996 -- 211
INSTRUMENT STATUS: nominal
CDS GROUND SYSTEM: nominal
PLANNING :
=====
AUGUST 9, 1996 -- 212
INSTRUMENT STATUS: nominal. VDS engineering performed today. Changed the
baseline offset voltage to different values: from 1.65 to
1.57, 1.73, 1.81, and back to 1.65. See Bill Thompson's
e-mail regarding the test for more info. and results.
CDS GROUND SYSTEM: nominal
PLANNING :
=====
AUGUST 10, 1996 -- 213
INSTRUMENT STATUS: nominal, completed raw dumps for slit 4, detector 2 at
voltage settings C7, C8, and C9.
CDS GROUND SYSTEM: nominal
PLANNING :
=====
AUGUST 11, 1996 -- 214
INSTRUMENT STATUS: nominal
CDS GROUND SYSTEM: nominal
PLANNING :
=====
AUGUST 12, 1996 -- 215
INSTRUMENT STATUS: nominal
CDS GROUND SYSTEM: nominal, GSET #50 created - quiet sun, slit 4
PLANNING :
=====
AUGUST 13, 1996 -- 216
INSTRUMENT STATUS: nominal
CDS GROUND SYSTEM: nominal, software update
PLANNING :
=====
AUGUST 14, 1996 -- 217
INSTRUMENT STATUS: nominal
CDS GROUND SYSTEM: nominal
PLANNING : JOP044 & JOP041
=====
AUGUST 15, 1996 -- 218
INSTRUMENT STATUS: nominal
CDS GROUND SYSTEM: nominal, changed raster 11/7 to 563 seconds due to a
problem seen with study 4186. See e-mail for all of the
info. Basically, FSUN ran way over and the ops had
to take more time than allotted to reach their positions.
Stein caught the problem by analysing the data from
study 4186. Imported studies deepsp_1 and o_fflows_10.
PLANNING :
=====
AUGUST 16, 1996 -- 219
INSTRUMENT STATUS: nominal
CDS GROUND SYSTEM: nominal
PLANNING :
=====
AUGUST 17, 1996 -- 220
INSTRUMENT STATUS: nominal
CDS GROUND SYSTEM: nominal
PLANNING : JOP 44
=====
AUGUST 18, 1996 -- 221
INSTRUMENT STATUS: nominal
CDS GROUND SYSTEM: nominal
PLANNING : JOP 44
=====
AUGUST 19, 1996 -- 222
INSTRUMENT STATUS: nominal
CDS GROUND SYSTEM: nominal, changed real-time archive disk to /cdsd4
PLANNING :
=====
AUGUST 20, 1996 -- 223
INSTRUMENT STATUS: Investigation into a strange occurrence in which a series
of untagged studies did not run. The next time-tagged
study ran properly at 1300, but after the SYNOP at 0630,
the untagged studies after it did not run until the 1300
time-tagged study. Also found that a time-tagged study at
1900 did not run, either. This is very strange since a
replay through STM showed the commands as being loaded
properly. Ran cpt/update to the instrument for
changes made to ops_ltheta and ops_lphi in the state DB.
CDS GROUND SYSTEM: nominal, updated raster 79v2 duration from 691 to 725.
Imported the follwing studies: dynhel1_2, o_netw1,
o_netw2, and o_netw3.
PLANNING :
=====
AUGUST 21, 1996 -- 224
INSTRUMENT STATUS: nominal, previous day's investigation turned up nothing,
so the problem just seems to be an unexplained anomaly.
CPT was run with /new, and these problems have not been
seen.
CDS GROUND SYSTEM: nominal
PLANNING :
=====
AUGUST 22, 1996 -- 225
INSTRUMENT STATUS: nominal
CDS GROUND SYSTEM: nominal, began regenerating FITS files w/ CDROM data from
15/Apr to 15/June.
PLANNING :
=====
AUGUST 23, 1996 -- 226
INSTRUMENT STATUS: nominal, changed pointing on study NSGSCAN1/v1 to run at
Aug 24 1:51 at the request of the scientist. Pointing
was changed by manually editing the CVT file series_57.dt
and inserting the new OPS pointing. This file was then
uplinked to the instrument.
CDS GROUND SYSTEM: nominal, changed the state database y-centering parameter
and loaded update to the instrument.
PLANNING :
=====
AUGUST 24, 1996 -- 227
INSTRUMENT STATUS: nominal
CDS GROUND SYSTEM: nominal
PLANNING :
=====
AUGUST 25, 1996 -- 228
INSTRUMENT STATUS: nominal
CDS GROUND SYSTEM: nominal
PLANNING :
=====
AUGUST 26, 1996 -- 229
INSTRUMENT STATUS: nominal
CDS GROUND SYSTEM: nominal
PLANNING :
=====
AUGUST 27, 1996 -- 230
INSTRUMENT STATUS: Detector 1 trip during GIS study @1425 UT today. Analysis
showed no unusual count rates, currents, or voltages. The
raw count rate peaked at around 2200 before tripping, the
voltage was around 4.05 kV and the current at 22.8 uA. The
detector was reset @1509 UT while the GIS study was still
running.
CDS GROUND SYSTEM: nominal. Changed the following raster durations:
31/v3 from 315 to 280
31/v4 from 315 to 280
36/v16 from 1477 to 1561
38/v8 from 1644 to 1704
41/v2 from 212 to 200
68/v1 from 24094 to 24173
74/v3 from 1644 to 1835
PLANNING :
=====
AUGUST 28, 1996 -- 231
INSTRUMENT STATUS: nominal
CDS GROUND SYSTEM: nominal
PLANNING :
=====
AUGUST 29, 1996 -- 232
INSTRUMENT STATUS: nominal
CDS GROUND SYSTEM: nominal
PLANNING :
=====
AUGUST 30, 1996 -- 233
INSTRUMENT STATUS: Instrument anomally occured at aproximately 13:26 UT
when a CDHS Macro Error was detected. This error occured
when series ID 3860 (table 41) attempted to start series
ID 3861 (table 38). Table 38 at the time contained
series ID 3845, which caused a Macro Series ID error to
be generated. The reason table 38 contained the wrong
series is that series ID 3845 was mistakenly loaded into
table 38 by the operater the night before. Once the
macro error occured, the processing of study G2AL/v1
halted and the CDS entered READY_BOTH mode. The CDS
remained in this state until the study LIMB/v6 was started
manually at 16:04 UT. Also lost was study GEAST/v1.
CDS GROUND SYSTEM: nominal
PLANNING :
=====
AUGUST 31, 1996 -- 234
INSTRUMENT STATUS: Two SEU's were detected on the secondary processor. The
secondary processor was restarted. The instrument was
nominal after restart.
CDS GROUND SYSTEM: nominal
PLANNING :
From the CDS Operations Management Team in the Space Science & Technology Department at CCLRC Rutherford Appleton Laboratory Site maintained by John Rainnie. Last revised on Monday (13/Aug/2001) at 14:02. |