Scientific Operations | ||
|
December 2002============================================================================= DATE:1-Dec-2002 DOY: 335 OPERATIONS ENGINEER(S): R. Yurow SCIENTIST: J. Ireland CDS INSTRUMENT: A NIS Reboot was performed at 17:21 UT. A Mechanism Lubrication was completed at 18:21 UT. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:2-Dec-2002 DOY: 336 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: S. McIntosh CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: A Telemetry Submode switch (from Submode 6 to 5) occured at 19:10 UT. CDS nominal post Submode Switch. The following study was imported to the EOF: blink_hp_2.def DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:3-Dec-2002 DOY: 337 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: S. McIntosh CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: The following raster duration change was made: O_LOOP11 rid/210 var/1 617s - 620s. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:4-Dec-2002 DOY: 338 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: S. McIntosh CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: A Telemetry Submode change (from Submode 5 to 6) occured at 19:55 UT. CDS nominal post Submode change. DAY PLAN: Submode Change (5 to 6), Science Operations. COMMENTS: ============================================================================= DATE:5-Dec-2002 DOY: 339 OPERATIONS ENGINEER(S): C. Maroney (On Call) SCIENTIST: S. McIntosh CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: GSFC was closed due to Weather. Ops on-call. ============================================================================= DATE:6-Dec-2002 DOY: 340 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: S. McIntosh CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: The following study was imported to the EOF: ardiag_3_1.def. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:7-Dec-2002 DOY: 341 OPERATIONS ENGINEER(S): J. Siedel SCIENTIST: S. McIntosh CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:8-Dec-2002 DOY: 342 OPERATIONS ENGINEER(S): C. King SCIENTIST: S. McIntosh CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:9-Dec-2002 DOY: 343 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: J. Ireland CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:10-Dec-2002 DOY: 344 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: J. Ireland CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:11-Dec-2002 DOY: 345 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: J. Ireland CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:12-Dec-2002 DOY: 346 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: J. Ireland CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:13-Dec-2002 DOY: 347 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: J. Ireland CDS INSTRUMENT: One run of Flat Field Calibration (FFCAL) was run at 18:31 UT. CDS GROUND SYSTEM: Nominal. DAY PLAN: FFCAL, Science Operations. COMMENTS: ============================================================================= DATE:14-Dec-2002 DOY: 348 OPERATIONS ENGINEER(S): J. Siedel SCIENTIST: J. Ireland CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:15-Dec-2002 DOY: 349 OPERATIONS ENGINEER(S): C. King SCIENTIST: J. Ireland CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:16-Dec-2002 DOY: 350 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: A. Fludra CDS INSTRUMENT: A CUVMCP Red High limit violation occured at 23:11 UT and lasted for 5 formats. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:17-Dec-2002 DOY: 351 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: A. Fludra CDS INSTRUMENT: A parity error was detected on the Secondary (Science) Processor at address location #8005687f. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:18-Dec-2002 DOY: 352 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: A. Fludra CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:19-Dec-2002 DOY: 353 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: A. Fludra CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:20-Dec-2002 DOY: 354 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: A. Fludra CDS INSTRUMENT: The following parity errors were detected in the Science Module (considered "safe") of the Primary Processor: #80056cf7 and #80052ff3. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:21-Dec-2002 DOY: 355 OPERATIONS ENGINEER(S): C. King SCIENTIST: A. Fludra CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:22-Dec-2002 DOY: 356 OPERATIONS ENGINEER(S): J. Siedel / R. Yurow SCIENTIST: A. Fludra CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:23-Dec-2002 DOY: 357 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: A. Fludra CDS INSTRUMENT: A mechanism lubrication was completed at 22:16 UT. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:24-Dec-2002 DOY: 358 OPERATIONS ENGINEER(S): R. Yurow SCIENTIST: A. Fludra CDS INSTRUMENT: A NIS Setup Register A System Error was detected. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:25-Dec-2002 DOY: 359 OPERATIONS ENGINEER(S): On Call SCIENTIST: A. Fludra CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: Christmas Day ============================================================================= DATE:26-Dec-2002 DOY: 360 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: A. Fludra CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:27-Dec-2002 DOY: 361 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: A. Fludra CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: The following study was imported to the EOF: usuntst2_1.def. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:28-Dec-2002 DOY: 362 OPERATIONS ENGINEER(S): C. King SCIENTIST: A. Fludra CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:29-Dec-2002 DOY: 363 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: A. Fludra CDS INSTRUMENT: A CDS Reboot was done at 20:01 UT to clear numerous errors from both processors. Recovery operations were completed at 21:00 UT. The science plan will resume at 22:42 UT. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:30-Dec-2002 DOY: 364 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: W. Thompson CDS INSTRUMENT: A parity error was detected in the Secondary (Science) Processor at address #8006382f. CDS GROUND SYSTEM: The following raster duration change was made: SAS250N RID/162 Var/6 3387s - 3514s. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:31-Dec-2002 DOY: 365 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: W. Thompson CDS INSTRUMENT: A NIS Setup Register A Failure was detected. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= From the CDS Operations Management Team in the Space Science & Technology Department at CCLRC Rutherford Appleton Laboratory Site maintained by John Rainnie. Last revised on Tuesday (17/Jul/2001) at 09:42. |