Scientific Operations | ||
|
December 2003============================================================================= DATE:1-Dec-2003 DOY: 335 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: U. Kraev CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:2-Dec-2003 DOY: 336 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: U. Kraev CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: The IWS command rate was changed to 1/3s. for quick commanding on a good station. The following raster duration change was made: ULY_QUAD rid/199 var/2 461s - 477s DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:3-Dec-2003 DOY: 337 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: U. Kraev CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:4-Dec-2003 DOY: 338 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: U. Kraev CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: A Telemetry Submode change (from Submode 5 to 6) occured at 21:30 UT. CDS Nominal after switch. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:5-Dec-2003 DOY: 339 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: U. Kraev CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:6-Dec-2003 DOY: 340 OPERATIONS ENGINEER(S): J. Seidel / C. King SCIENTIST: U. Kraev CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:7-Dec-2003 DOY: 341 OPERATIONS ENGINEER(S): J. Seidel / C. King SCIENTIST: U. Kraev CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:8-Dec-2003 DOY: 342 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: J. Ireland CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:9-Dec-2003 DOY: 343 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: J. Ireland CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: The following study was imported to the EOF: spect_4_1.def The following raster durations were modified: GIS_EW rid/22 var/1 6383s - 6624s GIS11W rid/27 var/3 4923s - 4933s ICAL1_G rid/14 var/1 1403s - 1410s XCPT has been updated and implemented. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:10-Dec-2003 DOY: 344 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: J. Ireland CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:11-Dec-2003 DOY: 345 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: J. Ireland CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:12-Dec-2003 DOY: 346 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: J. Ireland CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:13-Dec-2003 DOY: 347 OPERATIONS ENGINEER(S): J. Seidel / C. King SCIENTIST: J. Ireland CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:14-Dec-2003 DOY: 348 OPERATIONS ENGINEER(S): J. Seidel / C. King SCIENTIST: J. Ireland CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:15-Dec-2003 DOY: 349 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: P. Young (RAL) CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:16-Dec-2003 DOY: 350 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: P. Young (RAL) CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:17-Dec-2003 DOY: 351 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: A. Fludra CDS INSTRUMENT: Due to operator error the daily science plan was not loaded in time today. At 01:00 UT, the Emergency study will kick off. A modified plan will be loaded on the next station. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:18-Dec-2003 DOY: 351 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: A. Fludra CDS INSTRUMENT: At 02:11 UT, the Emergency study was aborted so that the nominal science plan can be be loaded. The science plan will resume at 02:40 UT with SYNOP_G5/v1. A Mechanism Lubrication was completed at 20:20 UT. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:19-Dec-2003 DOY: 353 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: A. Fludra CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:20-Dec-2003 DOY: 354 OPERATIONS ENGINEER(S): R. Yurow SCIENTIST: A. Fludra CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: The IWS command rate was changed to 1/10s at 17:04 UT to enable commanding on D-27. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:21-Dec-2003 DOY: 355 OPERATIONS ENGINEER(S): J. Seidel / C. King SCIENTIST: A. Fludra CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:22-Dec-2003 DOY: 356 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: A. Fludra CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:23-Dec-2003 DOY: 357 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: A. Fludra CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:24-Dec-2003 DOY: 358 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: A. Fludra CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:25-Dec-2003 DOY: 359 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: A. Fludra CDS INSTRUMENT: A VDS Setup Register A Failure was detected. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: Christmas Day (US Holiday) ============================================================================= DATE:26-Dec-2003 DOY: 360 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: A. Fludra CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:27-Dec-2003 DOY: 361 OPERATIONS ENGINEER(S): J. Seidel / C. King SCIENTIST: A. Fludra CDS INSTRUMENT: A parity error was detected on the Secondary (Science) Processor at memory location #8007c657. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:28-Dec-2003 DOY: 362 OPERATIONS ENGINEER(S): J. Seidel / C. King SCIENTIST: A. Fludra CDS INSTRUMENT: At 10:53 UT, CTM 31 = 25 violated YELLOW HIGH limits and returned to nominal at 11:00 UT. This was due to the increased temperatures caused by our current solar conditions/postion. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:29-Dec-2003 DOY: 363 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: A. Fludra CDS INSTRUMENT: At 08:04 UT, CTM 31 = 25 violated YELLOW HIGH limits and returned to nominal (CTM 31 = 24) at 09:21 UT. At 08:57 UT, CTM 5 = 26 violated YELLOW HIGH limits for 2 minutes and returned to nominal (CTM 5 = 25) at 08:59 UT. The above limits were likely caused by increased temperatures caused by our current solar conditions/position. Currently under review. CDS Doors were closed at 21:10 UT for S/C Manuevers. ESR Flag was disabled for CDS at 21:25 UT. CDS GROUND SYSTEM: The following raster duration was modified: SIG_FT44 rid/11 var/107 2148s - 2250s DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:30-Dec-2003 DOY: 364 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: A. Fludra CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:31-Dec-2003 DOY: 365 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: A. Fludra CDS INSTRUMENT: CDS Doors were opened at 19:01 UT. The NIS was reset at 19:28 UT and Secondary (Science) processor restarted at 19:34 UT in order to clear errors on both subsystems. The science plan will resume at 08:22 UT DOY 001 due to keyhole. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= From the CDS Operations Management Team in the Space Science & Technology Department at CCLRC Rutherford Appleton Laboratory Site maintained by John Rainnie. Last revised on Tuesday (17/Jul/2001) at 09:42. |