DATE: 1-Dec-2005
DOY: 335
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: P. Young (RAL)
CDS INSTRUMENT: 
  A Mechanism Lubrication was completed at 20:55 UT.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
=============================================================================
DATE: 2-Dec-2005
DOY: 336
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: P. Young (RAL)
CDS INSTRUMENT: 
  GIS detectors 1,2,3 tripped at 21:20 UT.  Anomaly occured while running
GIS Spectral atlas.  This may have been the wrong study since normally 
GISAT/v4 is run and not GISAT/v2 that was run today.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: SOHO celebrates its 10th Anniversary!!
=============================================================================
DATE: 3-Dec-2005
DOY: 337
OPERATIONS ENGINEER(S): R. Yurow
SCIENTIST: P. Young (RAL)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
=============================================================================
DATE: 4-Dec-2005
DOY: 338
OPERATIONS ENGINEER(S): R. Yurow
SCIENTIST: P. Young (RAL)
CDS INSTRUMENT: 
  GIS detectors (1,2,3) were reset at 01:45 UT.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
=============================================================================
DATE: 5-Dec-2005
DOY: 339
OPERATIONS ENGINEER(S): C. Maroney
SCIENTIST: P. Young (RAL)
CDS INSTRUMENT: 
  A parity error was detected on the primary processor at memory space
location #8007a043 - this is in the Sequence Tables.
  A parity error was detected on the secondary (Science) processor at memory
location #8003ea07.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
=============================================================================
DATE: 6-Dec-2005
DOY: 340
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: P. Young (RAL)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: 
  A telemetry submode change (to Submode 5) occured at 20 UT.  CDS Nominal.
DAY PLAN: Science Operations.
COMMENTS:
=============================================================================
DATE: 7-Dec-2005
DOY: 341
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: P. Young (RAL)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
=============================================================================
DATE: 8-Dec-2005
DOY: 342
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: P. Young (RAL)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
=============================================================================
DATE: 9-Dec-2005
DOY: 343
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: P. Young (RAL)
CDS INSTRUMENT: 
  The FFCAL study scheduled for 18:00 UT failed to execute, resulting in a 
study abort.
  The STRE4W study scheduled for 20:00 UT also failed to execute, resulting
in another study abort.  Reason for both failures may be a parity error on 
the primary processor at location #8001ea3 (IMIF module).
  Reboot procedure was started at 21:22 UT.  CDHS reset was at 21:32 UT.
After completing step 11 (Enable Primary Memory Dump), it was noticed that
ASCVIS and ASCGDCS were set to 'redundant' instead of 'primary'.  May be
meaningless -- will proceed with reboot before taking other action.
  Both ASCVIS and ASCGDCS returned to 'primary' after going to READY_BOTH.
  All 3 GIS patches were reloaded.
  CDS reboot was completed at 22:55 UT.  Due to the immanent end of the 
pass, there was no time to load a plan.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
=============================================================================
DATE: 10-Dec-2005
DOY: 344
OPERATIONS ENGINEER(S): R. Yurow
SCIENTIST: P. Young (RAL)
CDS INSTRUMENT: 
  A test study was successfully run at 21:45 UT. Following the successful
completion of the test study, a plan was loaded on CDS to start at 1:48 UT
(DOY 345).
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
=============================================================================
DATE: 11-Dec-2005
DOY: 345
OPERATIONS ENGINEER(S): R. Yurow
SCIENTIST: P. Young (RAL)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
=============================================================================
DATE: 12-Dec-2005
DOY: 346
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: J. Ireland (GSFC)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
=============================================================================
DATE: 13-Dec-2005
DOY: 347
OPERATIONS ENGINEER(S): C. Maroney
SCIENTIST: J. Ireland (GSFC)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
=============================================================================
DATE: 14-Dec-2005
DOY: 348
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: J. Ireland (GSFC)
CDS INSTRUMENT: 
  The CDS Science plan was stopped at 22:27 UT.  CDS doors were closed at
22:33 UT in preparation for S/C Maneuvers.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
=============================================================================
DATE: 15-Dec-2005
DOY: 349
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: J. Ireland (GSFC)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: (Closed Door) Science Operations.
COMMENTS: S/C Maneuvers (Roll to 180)
=============================================================================
DATE: 16-Dec-2005
DOY: 350
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: J. Ireland (GSFC)
CDS INSTRUMENT: 
  CDS doors were opened at 20:20 UT, following S/C momentum management, etc.
  A parity error was detected on the primary processor memory space at
location #80006fd3.  This is in a unsafe location and will require a reboot.
  The ESR flag was enabled at 20:41 UT.
  A CDS reboot was started at 21:34 UT.  The CDHS was reset by using the
CB3RESET command at 22:32 UT.  CDS was returned to standby at 22:51 UT and
recovery operations were completed at 00:02 UT (DOY 351).  CDS is nominal
after the reboot.
  The science plan is scheduled to resume at 01:30 UT (DOY 351).
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
=============================================================================
DATE: 17-Dec-2005
DOY: 351
OPERATIONS ENGINEER(S): R. Yurow
SCIENTIST: J. Ireland (GSFC)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
=============================================================================
DATE: 18-Dec-2005
DOY: 352
OPERATIONS ENGINEER(S): R. Yurow
SCIENTIST: J. Ireland (GSFC)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
=============================================================================
DATE: 19-Dec-2005
DOY: 353
OPERATIONS ENGINEER(S): C. Maroney
SCIENTIST: D. Bewsher (RAL)
CDS INSTRUMENT: 
  At 21:39 UT, CDS science plan was aborted manually to allow a telemetry
submode change scheduled for 21:30 UT.  Study affected was UCLAN_N4 
(s34064r0).
CDS GROUND SYSTEM: 
  A telemetry submode change (submode 5 to 6) occured at 21:42 UT.  
CDS nominal after change.
DAY PLAN: Science Operations.
COMMENTS:
=============================================================================
DATE: 20-Dec-2005
DOY: 354
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: D. Bewsher (RAL)
CDS INSTRUMENT: 
  A parity error was detected on the primary processor at memory location
#800554bf - Science Module (SAFE).
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
=============================================================================
DATE: 21-Dec-2005
DOY: 355
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: D. Bewsher (RAL)
CDS INSTRUMENT: 
  A NIS Setup Register A Failure was detected.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
=============================================================================
DATE: 22-Dec-2005
DOY: 356
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: D. Bewsher (RAL)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
=============================================================================
DATE: 23-Dec-2005
DOY: 357
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: D. Bewsher (RAL)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
=============================================================================
DATE: 24-Dec-2005
DOY: 358
OPERATIONS ENGINEER(S): R. Yurow
SCIENTIST: D. Bewsher (RAL)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: Christmas Eve
=============================================================================
DATE: 25-Dec-2005
DOY: 359
OPERATIONS ENGINEER(S): On-Call
SCIENTIST: D. Bewsher (RAL)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: Christmas Day
=============================================================================
DATE: 26-Dec-2005
DOY: 360
OPERATIONS ENGINEER(S): On-Call
SCIENTIST: C. Maroney (GSFC)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: US Holiday (Christmas Observed)
=============================================================================
DATE: 27-Dec-2005
DOY: 361
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: C. Maroney (GSFC)
CDS INSTRUMENT: 
  A Mechanism Lubrication was completed at 21:30 UT.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE: 28-Dec-2005
DOY: 362
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: C. Maroney (GSFC)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE: 29-Dec-2005
DOY: 363
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: C. Maroney (GSFC)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE: 30-Dec-2005
DOY: 364
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: C. Maroney (GSFC)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE: 31-Dec-2005
DOY: 365
OPERATIONS ENGINEER(S): R. Yurow
SCIENTIST: C. Maroney (GSFC)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================



From the CDS Operations Management Team in the Space Science & Technology Department at CCLRC Rutherford Appleton Laboratory
Site maintained by John Rainnie.