Scientific Operations | ||
|
December 2005============================================================================= DATE: 1-Dec-2005 DOY: 335 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: P. Young (RAL) CDS INSTRUMENT: A Mechanism Lubrication was completed at 20:55 UT. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE: 2-Dec-2005 DOY: 336 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: P. Young (RAL) CDS INSTRUMENT: GIS detectors 1,2,3 tripped at 21:20 UT. Anomaly occured while running GIS Spectral atlas. This may have been the wrong study since normally GISAT/v4 is run and not GISAT/v2 that was run today. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: SOHO celebrates its 10th Anniversary!! ============================================================================= DATE: 3-Dec-2005 DOY: 337 OPERATIONS ENGINEER(S): R. Yurow SCIENTIST: P. Young (RAL) CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE: 4-Dec-2005 DOY: 338 OPERATIONS ENGINEER(S): R. Yurow SCIENTIST: P. Young (RAL) CDS INSTRUMENT: GIS detectors (1,2,3) were reset at 01:45 UT. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE: 5-Dec-2005 DOY: 339 OPERATIONS ENGINEER(S): C. Maroney SCIENTIST: P. Young (RAL) CDS INSTRUMENT: A parity error was detected on the primary processor at memory space location #8007a043 - this is in the Sequence Tables. A parity error was detected on the secondary (Science) processor at memory location #8003ea07. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE: 6-Dec-2005 DOY: 340 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: P. Young (RAL) CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: A telemetry submode change (to Submode 5) occured at 20 UT. CDS Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE: 7-Dec-2005 DOY: 341 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: P. Young (RAL) CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE: 8-Dec-2005 DOY: 342 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: P. Young (RAL) CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE: 9-Dec-2005 DOY: 343 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: P. Young (RAL) CDS INSTRUMENT: The FFCAL study scheduled for 18:00 UT failed to execute, resulting in a study abort. The STRE4W study scheduled for 20:00 UT also failed to execute, resulting in another study abort. Reason for both failures may be a parity error on the primary processor at location #8001ea3 (IMIF module). Reboot procedure was started at 21:22 UT. CDHS reset was at 21:32 UT. After completing step 11 (Enable Primary Memory Dump), it was noticed that ASCVIS and ASCGDCS were set to 'redundant' instead of 'primary'. May be meaningless -- will proceed with reboot before taking other action. Both ASCVIS and ASCGDCS returned to 'primary' after going to READY_BOTH. All 3 GIS patches were reloaded. CDS reboot was completed at 22:55 UT. Due to the immanent end of the pass, there was no time to load a plan. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE: 10-Dec-2005 DOY: 344 OPERATIONS ENGINEER(S): R. Yurow SCIENTIST: P. Young (RAL) CDS INSTRUMENT: A test study was successfully run at 21:45 UT. Following the successful completion of the test study, a plan was loaded on CDS to start at 1:48 UT (DOY 345). CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE: 11-Dec-2005 DOY: 345 OPERATIONS ENGINEER(S): R. Yurow SCIENTIST: P. Young (RAL) CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE: 12-Dec-2005 DOY: 346 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: J. Ireland (GSFC) CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE: 13-Dec-2005 DOY: 347 OPERATIONS ENGINEER(S): C. Maroney SCIENTIST: J. Ireland (GSFC) CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE: 14-Dec-2005 DOY: 348 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: J. Ireland (GSFC) CDS INSTRUMENT: The CDS Science plan was stopped at 22:27 UT. CDS doors were closed at 22:33 UT in preparation for S/C Maneuvers. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE: 15-Dec-2005 DOY: 349 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: J. Ireland (GSFC) CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: (Closed Door) Science Operations. COMMENTS: S/C Maneuvers (Roll to 180) ============================================================================= DATE: 16-Dec-2005 DOY: 350 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: J. Ireland (GSFC) CDS INSTRUMENT: CDS doors were opened at 20:20 UT, following S/C momentum management, etc. A parity error was detected on the primary processor memory space at location #80006fd3. This is in a unsafe location and will require a reboot. The ESR flag was enabled at 20:41 UT. A CDS reboot was started at 21:34 UT. The CDHS was reset by using the CB3RESET command at 22:32 UT. CDS was returned to standby at 22:51 UT and recovery operations were completed at 00:02 UT (DOY 351). CDS is nominal after the reboot. The science plan is scheduled to resume at 01:30 UT (DOY 351). CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE: 17-Dec-2005 DOY: 351 OPERATIONS ENGINEER(S): R. Yurow SCIENTIST: J. Ireland (GSFC) CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE: 18-Dec-2005 DOY: 352 OPERATIONS ENGINEER(S): R. Yurow SCIENTIST: J. Ireland (GSFC) CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE: 19-Dec-2005 DOY: 353 OPERATIONS ENGINEER(S): C. Maroney SCIENTIST: D. Bewsher (RAL) CDS INSTRUMENT: At 21:39 UT, CDS science plan was aborted manually to allow a telemetry submode change scheduled for 21:30 UT. Study affected was UCLAN_N4 (s34064r0). CDS GROUND SYSTEM: A telemetry submode change (submode 5 to 6) occured at 21:42 UT. CDS nominal after change. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE: 20-Dec-2005 DOY: 354 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: D. Bewsher (RAL) CDS INSTRUMENT: A parity error was detected on the primary processor at memory location #800554bf - Science Module (SAFE). CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE: 21-Dec-2005 DOY: 355 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: D. Bewsher (RAL) CDS INSTRUMENT: A NIS Setup Register A Failure was detected. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE: 22-Dec-2005 DOY: 356 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: D. Bewsher (RAL) CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE: 23-Dec-2005 DOY: 357 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: D. Bewsher (RAL) CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE: 24-Dec-2005 DOY: 358 OPERATIONS ENGINEER(S): R. Yurow SCIENTIST: D. Bewsher (RAL) CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: Christmas Eve ============================================================================= DATE: 25-Dec-2005 DOY: 359 OPERATIONS ENGINEER(S): On-Call SCIENTIST: D. Bewsher (RAL) CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: Christmas Day ============================================================================= DATE: 26-Dec-2005 DOY: 360 OPERATIONS ENGINEER(S): On-Call SCIENTIST: C. Maroney (GSFC) CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: US Holiday (Christmas Observed) ============================================================================= DATE: 27-Dec-2005 DOY: 361 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: C. Maroney (GSFC) CDS INSTRUMENT: A Mechanism Lubrication was completed at 21:30 UT. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE: 28-Dec-2005 DOY: 362 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: C. Maroney (GSFC) CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE: 29-Dec-2005 DOY: 363 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: C. Maroney (GSFC) CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE: 30-Dec-2005 DOY: 364 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: C. Maroney (GSFC) CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE: 31-Dec-2005 DOY: 365 OPERATIONS ENGINEER(S): R. Yurow SCIENTIST: C. Maroney (GSFC) CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= From the CDS Operations Management Team in the Space Science & Technology Department at CCLRC Rutherford Appleton Laboratory Site maintained by John Rainnie. Last revised on Tuesday (17/Jul/2001) at 09:42. |