December 1996
 
============================================================================== 
DATE:  1-Dec-1996 16:31:48
DOY: 336
OPERATIONS ENGINEER(S): Ron Yurow         
SCIENTIST: W. Thompson
CDS INSTRUMENT: Nominal.	 
CDS GROUND SYSTEMi:Nominal
DAY PLAN:Science Operations. 
COMMENTS: 
============================================================================== 
DATE:  2-Dec-1996
DOY: 337
OPERATIONS ENGINEER(S): G. Dimitoglou, R. Yurow         
SCIENTIST: W. Thompson
CDS INSTRUMENT:
 GIS Detector 2 triped yesterday.  Reset. 	 
CDS GROUND SYSTEMi: Nominal
DAY PLAN: Science Operations. 
COMMENTS: 
============================================================================== 
DATE:  3-Dec-1996
DOY: 338
OPERATIONS ENGINEER(S): C. Haskell, R. Yurow         
SCIENTIST: W. Thompson
CDS INSTRUMENT:
 BTM18 (slit motor temperature) went into high alarm at 15:39 UT.	 
CDS GROUND SYSTEM: Nominal
DAY PLAN: Science Operations. 
COMMENTS: 
============================================================================== 
DATE:  4-Dec-1996
DOY: 339
OPERATIONS ENGINEER(S): C. Haskell, R. Yurow         
SCIENTIST: W. Thompson
CDS INSTRUMENT: Nominal	 
CDS GROUND SYSTEM: 
 EMON_QCM_LOG was manually rerun over DOYs 331 - 338.
 The following studies were imported to the EOF:
 	NTBRMDIT1	11/20
	NTBRMDIT2 	130/2
DAY PLAN: Telemetry Submode Test, Science Operations. 
COMMENTS: 
============================================================================== 
DATE:  5-Dec-1996
DOY: 340
OPERATIONS ENGINEER(S): C. Haskell, R. Yurow         
SCIENTIST: W. Thompson
CDS INSTRUMENT: 
 The NIS registered a SETUP REGISTER A FAILURE error at ~13:15 UT, just at 
 the begining of the Telemetry Submode 3 test.
 BTM18 (Slit Motor Temperature) went to high alarm at ~17:50 UT, while 
 running the lubrication study. 
CDS GROUND SYSTEM: Nominal
DAY PLAN: Telemetry Submode 3 Test, Lubrication Study, Science Operations. 
COMMENTS: 
============================================================================== 
DATE:  6-Dec-1996
DOY: 341
OPERATIONS ENGINEER(S): C. Haskell, R. Yurow         
SCIENTIST: W. Thompson
CDS INSTRUMENT: Nominal
CDS GROUND SYSTEM: Nominal
DAY PLAN: Science Operations. 
COMMENTS:
============================================================================== 
DATE:  7-Dec-1996
DOY: 342
OPERATIONS ENGINEER(S): C. Haskell         
SCIENTIST: P.R. Young
CDS INSTRUMENT: SEU recorded in secondary.  Secondary was rebooted and is 
 now nominal.
CDS GROUND SYSTEM: Nominal
DAY PLAN: Science Operations. 
COMMENTS: 
============================================================================== 
DATE:  8-Dec-1996
DOY: 343
OPERATIONS ENGINEER(S): C. Haskell         
SCIENTIST: P.R. Young
CDS INSTRUMENT: CDS ran no science for 2 1/2 hours due to a duplicate 
 time- tagged study.  The study did not run the following untagged 
 studies.
CDS GROUND SYSTEM: Nominal
DAY PLAN: Science Operations. 
COMMENTS:   
============================================================================== 
DATE:  9-Dec-1996
DOY: 344
OPERATIONS ENGINEER(S): C. Haskell,R. Yurow         
SCIENTIST: P.R. Young
CDS INSTRUMENT:  nominal 
CDS GROUND SYSTEM: The following raster durations were updated today 
 at 16:00 UT:

9/1 from 3181 to 3384
10/29 from 6019 to 6940
11/20 from 871 to 952
11/21 from 2093 to 2278
11/23 from 3921 to 4108
36/31 from 2045 to 2134
36/33 from 3921 to 4170
38/10 from 1970 to 2014
38/11 from 1970 to 2019
38/12 from 1970 to 2016

DAY PLAN: Science Operations. 
COMMENTS:   
============================================================================== 
DATE:  10-Dec-1996
DOY: 345
OPERATIONS ENGINEER(S): C. Haskell,R. Yurow         
SCIENTIST: P.R. Young
CDS INSTRUMENT:  Watchdog error occurred at 20:20 UT.  The instrument 
 was rebooted and science resumed at 22:00 UT. 
CDS GROUND SYSTEM: nominal
DAY PLAN: Science Operations. 
COMMENTS:   
============================================================================== 
DATE:  11-Dec-1996
DOY: 346
OPERATIONS ENGINEER(S): C. Haskell,R. Yurow         
SCIENTIST: P.R. Young
CDS INSTRUMENT: Nominal. 
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations. Telemetry Submode 2 Test.
COMMENTS:   
============================================================================== 
DATE:  12-Dec-1996
DOY: 347
OPERATIONS ENGINEER(S): C. Haskell,R. Yurow         
SCIENTIST: P.R. Young
CDS INSTRUMENT: Nominal. 
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:   
============================================================================== 
DATE:  13-Dec-1996
DOY: 348
OPERATIONS ENGINEER(S): G. Dimitoglou, R. Yurow         
SCIENTIST: P.R. Young
CDS INSTRUMENT: 
 BTM18 (slit motor temperature) went to high alarm at 20:02 UT.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:   
==============================================================================
DATE:  14-Dec-1996
DOY: 349`
OPERATIONS ENGINEER(S): G. Dimitoglou
SCIENTIST: A. Fludra 
CDS INSTRUMENT:
 BTM18 (slit motor temperature) went to high alarm at 20:06 UT.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
==============================================================================
DATE:  15-Dec-1996
DOY: 350
OPERATIONS ENGINEER(S): G. Dimitoglou
SCIENTIST: A. Fludra
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
==============================================================================
DATE:  16-Dec-1996
DOY: 351
OPERATIONS ENGINEER(S): C. Haskell, R. Yurow
SCIENTIST: A. Fludra
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: 
  Changed the study durations on the following studies:
	10/32	5959 ->	6286
	11/26	5472 ->	5899
	38/13	5145 -> 6702
	38/9 	3230 ->	3498
	111/1	2319 -> 2868
DAY PLAN: Science Operations.
COMMENTS:
==============================================================================
DATE:  17-Dec-1996
DOY: 352
OPERATIONS ENGINEER(S): G. Dimitoglou,C. Haskell
SCIENTIST: A. Fludra
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
==============================================================================
DATE:  18-Dec-1996
DOY: 353
OPERATIONS ENGINEER(S): C. Haskell, R. Yurow
SCIENTIST: A. Fludra
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM:
  State Database Updated:
	XSTUDY/0	(Emergency Study ID)		10
	XSTUDY/1	(Emergency Study Variation)	33
DAY PLAN: Science Operations.
COMMENTS:
==============================================================================
DATE:  19-Dec-1996
DOY: 354
OPERATIONS ENGINEER(S): C. Haskell, R. Yurow
SCIENTIST: A. Fludra
CDS INSTRUMENT: 
  Nominal.
  Sucessfully ran test of FAME study as an emergency study.
CDS GROUND SYSTEM:
  State Database Updated:
	XSTUDY/0	(Emergency Study ID)		10
	XSTUDY/1	(Emergency Study Variation)	34
DAY PLAN:
  Fame Study Test 
  Science Operations.
COMMENTS:
==============================================================================
DATE:  20-Dec-1996
DOY: 355
OPERATIONS ENGINEER(S): C. Haskell, R. Yurow
SCIENTIST: A. Fludra
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
==============================================================================
DATE:  21-Dec-1996
DOY: 356
OPERATIONS ENGINEER(S): R. Yurow
SCIENTIST: A. Fludra
CDS INSTRUMENT: 
  Nominal.
  Switched to Telemetry Submode 2 at DOY 375 00:10 UT.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: 
  Prepartion for Telemetry Submode 2 switch.
  Science Operations.
COMMENTS:
==============================================================================
DATE:  22-Dec-1996
DOY: 357
OPERATIONS ENGINEER(S): R. Yurow
SCIENTIST:
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: 
  Nominal.
  Switched TM Archive 2 Disk to /cdsd3/arch/archive2.
DAY PLAN: Instrument Monitoring
COMMENTS:
==============================================================================
DATE:  23-Dec-1996
DOY: 358
OPERATIONS ENGINEER(S): R. Yurow
SCIENTIST:
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Instrument Monitoring
COMMENTS:
==============================================================================
DATE:  24-Dec-1996
DOY: 359
OPERATIONS ENGINEER(S): R. Yurow
SCIENTIST:
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM:
  The following studie was imported to the EOF:
	bpias_1.def
DAY PLAN: Instrument Monitoring
COMMENTS:
==============================================================================
DATE:  26-Dec-1996
DOY: 361
OPERATIONS ENGINEER(S): R. Yurow
SCIENTIST:
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Instrument Monitoring
COMMENTS:
==============================================================================
DATE:  27-Dec-1996
DOY: 362
OPERATIONS ENGINEER(S): R. Yurow
SCIENTIST: D. Zarro
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Instrument Monitoring
COMMENTS:
==============================================================================
DATE:  28-Dec-1996
DOY: 363 
OPERATIONS ENGINEER(S): C. Haskell   
SCIENTIST: D. Zarro
CDS INSTRUMENT: Nominal. 23:00-High Rate telemetry rate, movie started at 
 23:30 UT.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Instrument Monitoring
COMMENTS:
==============================================================================
DATE: 29-Dec-1996
DOY: 364
OPERATIONS ENGINEER(S): C. Haskell 
SCIENTIST: D. Zarro
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Instrument Monitoring
COMMENTS:
==============================================================================
DATE:  30-Dec-1996
DOY: 365
OPERATIONS ENGINEER(S): C. Haskell, R. Yurow 
SCIENTIST: D. Zarro
CDS INSTRUMENT: Chose a new pointing target for the movie.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Instrument Monitoring
COMMENTS:
==============================================================================
DATE:  31-Dec-1996
DOY: 366
OPERATIONS ENGINEER(S): G. Dimitoglou, C. Haskell 
SCIENTIST: D. Zarro
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Instrument Monitoring
COMMENTS: