Scientific Operations | ||
|
December 1998============================================================================== DATE: 01-Dec-1998 DOY: 335 OPERATIONS ENGINEER(S): J. Payne, C. Maroney SCIENTIST: D. Zarro CDS INSTRUMENT: A parity error was detected in the primary processor memory space. Since the parity error is a safe location, no reboot is necessary. A NIS Setup Register A Failure error was flagged. The NIS will be reset at a convenient time. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================== DATE: 02-Dec-1998 DOY: 336 OPERATIONS ENGINEER(S): J. Payne, C. Maroney SCIENTIST: D. Zarro CDS INSTRUMENT: A lubrication study was completed at 21:51 UT. The NIS was reset to recover from a Setup Register A Failure error at 21:55 UT. CDS GROUND SYSTEM: Nominal. DAY PLAN: Lubrication Study, Science Operations. COMMENTS: ============================================================================== DATE: 03-Dec-1998 DOY: 337 OPERATIONS ENGINEER(S): J. Payne, C. Maroney SCIENTIST: D. Zarro CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================== DATE: 04-Dec-1998 DOY: 338 OPERATIONS ENGINEER(S): J. Payne, C. Maroney SCIENTIST: D. Zarro CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: The following study was imported to the EOF: large_bp_49.def DAY PLAN: Science Operations. COMMENTS: ============================================================================== DATE: 05-Dec-1998 DOY: 339 OPERATIONS ENGINEER(S): J. Payne SCIENTIST: D. Zarro CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================== DATE: 06-Dec-1998 DOY: 340 OPERATIONS ENGINEER(S): R. Yurow, C. Maroney SCIENTIST: D. Zarro CDS INSTRUMENT: All 3 of the GIS patches were installed sucessfully on the GIS at 16:20 UT. GIS raw dumps were performed from 17:27 UT to 1:15 UT DOY 341. CDS GROUND SYSTEM: Nominal. DAY PLAN: GIS Engineering, Science Operations. COMMENTS: ============================================================================== DATE: 07-Dec-1998 DOY: 341 OPERATIONS ENGINEER(S): R. Yurow, C. Maroney SCIENTIST: W. Thompson CDS INSTRUMENT: GIS raw dumps were performed from 16:00 UT to 21:30 UT. CDS GROUND SYSTEM: The study pfloops_2.def was imported to the EOF. DAY PLAN: GIS Engineering, Science Operations. COMMENTS: ============================================================================== DATE: 08-Dec-1998 DOY: 342 OPERATIONS ENGINEER(S): R. Yurow, C. Maroney SCIENTIST: W. Thompson CDS INSTRUMENT: GIS raw dumps were performed from 16:00 UT to 21:30 UT. CDS GROUND SYSTEM: Nominal. DAY PLAN: GIS Engineering, Science Operations. COMMENTS: ============================================================================== DATE: 09-Dec-1998 DOY: 343 OPERATIONS ENGINEER(S): R. Yurow, C. Maroney SCIENTIST: W. Thompson CDS INSTRUMENT: The update system table was reloaded at 13:45 UT from the state database in order to incorperate new pointing coefficients from the state database. GIS raw dumps were performed from 14:00 UT to 22:00 UT with a gap from 18:00 UT to 21:24 UT due to high winds at station 27. CDS GROUND SYSTEM: Nominal. DAY PLAN: GIS Engineering, Science Operations. COMMENTS: ============================================================================== DATE: 010-Dec-1998 DOY: 344 OPERATIONS ENGINEER(S): R. Yurow, C. Maroney SCIENTIST: W. Thompson CDS INSTRUMENT: GIS raw dumps were performed from 2:30 UT to 5:30 UT and from 16:00 UT to 20:00 UT CDS GROUND SYSTEM: Nominal. DAY PLAN: GIS Engineering, Science Operations. COMMENTS: ============================================================================== DATE: 11-Dec-1998 DOY: 345 OPERATIONS ENGINEER(S): R. Yurow, C. Maroney SCIENTIST: W. Thompson CDS INSTRUMENT: GIS raw dumps were performed from 16:00 UT to 17:50 UT. A parity errror was detected in the primary processor memory space. Since the error was in a safe location, no reboot was necessary. CDS GROUND SYSTEM: Nominal. DAY PLAN: GIS Engineering, Science Operations. COMMENTS: ============================================================================== DATE: 12-Dec-1998 DOY: 346 OPERATIONS ENGINEER(S): R. Yurow SCIENTIST: W. Thompson CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================== DATE: 13-Dec-1998 DOY: 347 OPERATIONS ENGINEER(S): R. Yurow SCIENTIST: W. Thompson CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================== DATE: 14-Dec-1998 DOY: 348 OPERATIONS ENGINEER(S): R. Yurow, C. Maroney SCIENTIST: T. Kucera CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================== DATE: 15-Dec-1998 DOY: 349 OPERATIONS ENGINEER(S): R. Yurow, C. Maroney SCIENTIST: T. Kucera CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================== DATE: 16-Dec-1998 DOY: 350 OPERATIONS ENGINEER(S): R. Yurow, C. Maroney SCIENTIST: T. Kucera CDS INSTRUMENT: A parity error was detected in the secondary (science) processor memory space. The secondary processor was rebooted at 20:05 UT. GIS Raw dumps were performed from 15:45 UT to 21:30 UT. CDS GROUND SYSTEM: Nominal. DAY PLAN: GIS Raw Dumps, Science Operations. COMMENTS: ============================================================================== DATE: 17-Dec-1998 DOY: 351 OPERATIONS ENGINEER(S): R. Yurow, C. Maroney SCIENTIST: T. Kucera CDS INSTRUMENT: The NIS flat field calibration, FFCAL was run at 20:38 UT. However, due to a late start of the script, the OPS movements continued into the next study, GIMCP_1B. The study GIMCP_1B was scheduled to start at 21:12 UT and the FFCAL script continued until 21:28 UT. CDS GROUND SYSTEM: Nominal. DAY PLAN: Flat Field Calibration, Science Operations. COMMENTS: ============================================================================== DATE: 18-Dec-1998 DOY: 352 OPERATIONS ENGINEER(S): R. Yurow, C. Maroney SCIENTIST: T. Kucera CDS INSTRUMENT: GIS raw dumps were performed from 16:00 UT to 21:30 UT CDS GROUND SYSTEM: Nominal. DAY PLAN: GIS Raw Dumps, Science Operations. COMMENTS: ============================================================================== DATE: 19-Dec-1998 DOY: 353 OPERATIONS ENGINEER(S): R. Yurow, E. Donaldson SCIENTIST: T. Kucera CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================== DATE: 20-Dec-1998 DOY: 354 OPERATIONS ENGINEER(S): R. Yurow, W. Hammond SCIENTIST: T. Kucera CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================== DATE: 21-Dec-1998 DOY: 355 OPERATIONS ENGINEER(S): R. Yurow, C. Maroney SCIENTIST: A. Fludra CDS INSTRUMENT: CDS closed both doors at 15:45 UT in prepartion for a spacecraft maneuver. At 17:30 UT an ESR occured when SOHO lost attitude control while in RMW mode. CDS substition heaters were switched on at 19:43 UT. Currently, CDS is in STANDBY mode and temperatures appear to be stable. CDS GROUND SYSTEM: Nominal. DAY PLAN: Close Doors, Science Operations. COMMENTS: ============================================================================== DATE: 22-Dec-1998 DOY: 356 OPERATIONS ENGINEER(S): R. Yurow, C. Maroney SCIENTIST: CDS INSTRUMENT: CDS is in STANDBY mode, otherwise nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Thermal Monitoring. COMMENTS: ============================================================================== DATE: 23-Dec-1998 DOY: 357 OPERATIONS ENGINEER(S): R. Yurow, C. Maroney SCIENTIST: CDS INSTRUMENT: CDS is in STANDBY mode, otherwise nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Thermal Monitoring. COMMENTS: ============================================================================== DATE: 24-Dec-1998 DOY: 358 OPERATIONS ENGINEER(S): R. Yurow, C. Maroney SCIENTIST: CDS INSTRUMENT: CDS is in STANDBY mode, otherwise nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Thermal Monitoring. COMMENTS: ============================================================================== DATE: 28-Dec-1998 DOY: 362 OPERATIONS ENGINEER(S): R. Yurow, C. Maroney SCIENTIST: CDS INSTRUMENT: CDS is in STANDBY mode, otherwise nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Thermal Monitoring. COMMENTS: ============================================================================== DATE: 29-Dec-1998 DOY: 363 OPERATIONS ENGINEER(S): R. Yurow, C. Maroney SCIENTIST: CDS INSTRUMENT: CDS is in STANDBY mode, otherwise nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Thermal Monitoring. COMMENTS: ============================================================================== DATE: 30-Dec-1998 DOY: 364 OPERATIONS ENGINEER(S): R. Yurow, C. Maroney SCIENTIST: CDS INSTRUMENT: CDS is in STANDBY mode, otherwise nominal. CDS GROUND SYSTEM: Switched FITS archive disks to /cdsfits23. DAY PLAN: Thermal Monitoring. COMMENTS: ============================================================================== DATE: 31-Dec-1998 DOY: 365 OPERATIONS ENGINEER(S): R. Yurow, C. Maroney SCIENTIST: CDS INSTRUMENT: CDS is in STANDBY mode, otherwise nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Thermal Monitoring. COMMENTS: ============================================================================== From the CDS Operations Management Team in the Space Science & Technology Department at CCLRC Rutherford Appleton Laboratory Site maintained by John Rainnie. Last revised on Tuesday (17/Jul/2001) at 09:41. |