December 1999============================================================================= DATE: 01-Dec-1999 DOY: 335 OPERATIONS ENGINEER(S): R. Yurow / C. Maroney SCIENTIST: T. Kucera CDS INSTRUMENT: An ESR was manually triggered at ~19:15 after a spacecraft maneuver was automatically aborted. This caused CDS to return STANDBY mode. The spacecraft substitution duty cycle was then reduced to 60% on COBS #63 while COBS #62 was disabled. This change was made to compensate for the new CDS operating mode (internal heaters are enabled in STANDBY mode). CDS GROUND SYSTEM: Nominal DAY PLAN: Temperature monitoring COMMENTS: ============================================================================= DATE: 02-Dec-1999 DOY: 336 OPERATIONS ENGINEER(S): R. Yurow / C. Maroney SCIENTIST: T. Kucera CDS INSTRUMENT: CDS in STANDBY mode. CDS GROUND SYSTEM: Nominal DAY PLAN: Temperature monitoring COMMENTS: ============================================================================= DATE: 03-Dec-1999 DOY: 337 OPERATIONS ENGINEER(S): C. Maroney SCIENTIST: T. Kucera CDS INSTRUMENT: CDS in STANDBY mode. CDS GROUND SYSTEM: Nominal DAY PLAN: Temperature monitoring COMMENTS: ============================================================================= DATE: 04-Dec-1999 DOY: 338 OPERATIONS ENGINEER(S): E. Donaldson SCIENTIST: T. Kucera CDS INSTRUMENT: CDS in STANDBY mode. CDS GROUND SYSTEM: Nominal DAY PLAN: Temperature monitoring COMMENTS: ============================================================================= DATE: 05-Dec-1999 DOY: 339 OPERATIONS ENGINEER(S): W. Hammond SCIENTIST: T. Kucera CDS INSTRUMENT: CDS in STANDBY mode. CDS GROUND SYSTEM: Nominal DAY PLAN: Temperature monitoring COMMENTS: ============================================================================= DATE: 06-Dec-1999 DOY: 340 OPERATIONS ENGINEER(S): R. Yurow / C. Maroney SCIENTIST: D. Zarro CDS INSTRUMENT: CDS remains in STANDBY mode. Attempted reboot of CDHS to clear parity errors and shorten recovery time. However, CB3RESET failed to trigger a CDHS reset. CDS is currently in STANDBY mode with secondary (science) processor enabled. The CDHS will have to be reset prior to resumption of instrument operations. A parity error was detected in thr primary processor memory space, it will be cleared during CDS recovery. CDS GROUND SYSTEM: Nominal DAY PLAN: Temperature monitoring COMMENTS: ============================================================================= DATE: 07-Dec-1999 DOY: 341 OPERATIONS ENGINEER(S): R. Yurow / C. Maroney SCIENTIST: D. Zarro CDS INSTRUMENT: CDS remains in STANDBY mode. A parity error was detected in thr primary processor memory space, it will be cleared during CDS recovery. CDS GROUND SYSTEM: Nominal DAY PLAN: Temperature monitoring COMMENTS: ============================================================================= DATE: 08-Dec-1999 DOY: 342 OPERATIONS ENGINEER(S): R. Yurow / C. Maroney SCIENTIST: D. Zarro CDS INSTRUMENT: CDS remains in STANDBY mode. CDS GROUND SYSTEM: Imported study "nclan_n4_54.def". DAY PLAN: Temperature monitoring COMMENTS: ============================================================================= DATE: 09-Dec-1999 DOY: 343 OPERATIONS ENGINEER(S): R. Yurow / C. Maroney SCIENTIST: D. Zarro CDS INSTRUMENT: CDS remains in STANDBY mode. CDS GROUND SYSTEM: Nominal. DAY PLAN: Temperature monitoring COMMENTS: ============================================================================= DATE: 10-Dec-1999 DOY: 344 OPERATIONS ENGINEER(S): R. Yurow / C. Maroney SCIENTIST: D. Zarro CDS INSTRUMENT: CDS was returned to SNOOZE mode at 17:47 UT followed by a CDHS reset at 17:48 UT. At 18:14 UT CDS was returned to STANDBY mode and at 19:01 UT spacecraft substitution heaters were disabled. Recovery procedures were completed at 19:25 UT. Following the recovery, a mechanism test was successfully performed. CDS doors were then opened at 23:18 UT. Finally, a NIS image test and pointing test were performed. CDS GROUND SYSTEM: Nominal. DAY PLAN: CDS Recovery COMMENTS: ============================================================================= DATE: 11-Dec-1999 DOY: 345 OPERATIONS ENGINEER(S): E. Donaldson SCIENTIST: D. Zarro CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE: 12-Dec-1999 DOY: 346 OPERATIONS ENGINEER(S): W. Hammond SCIENTIST: D. Zarro CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE: 13-Dec-1999 DOY: 347 OPERATIONS ENGINEER(S): R. Yurow / C. Maroney SCIENTIST: E. Breeveld CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE: 14-Dec-1999 DOY: 348 OPERATIONS ENGINEER(S): R. Yurow / C. Maroney SCIENTIST: E. Breeveld CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Created GSET 65 Created GSET 66 Created GSET 67 Created GSET 68 Created GSET 69 DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE: 15-Dec-1999 DOY: 349 OPERATIONS ENGINEER(S): R. Yurow / C. Maroney SCIENTIST: E. Breeveld CDS INSTRUMENT: Attempted to run new version of FFCAL for 1st time, errors within the script called for aborting the FFCAL. Ron worked out the bugs in the FFCAL and we ran FFCAL again, howeverm the script then had to be aborted due to end of the test period. A second test has been scheduled for Friday (351) at 15:30 UT. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: FFCAL study ============================================================================= DATE: 16-Dec-1999 DOY: 350 OPERATIONS ENGINEER(S): R. Yurow / C. Maroney SCIENTIST: E. Breeveld CDS INSTRUMENT: Lubrication study was compeleted at 16:30 UT. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: Lubrication study ============================================================================= DATE: 17-Dec-1999 DOY: 351 OPERATIONS ENGINEER(S): R. Yurow / C. Maroney SCIENTIST: E. Breeveld CDS INSTRUMENT: Instrument temperatures are eleveated by between .5 - 1.0 DegC. Base panel temperature remains stable ~23.0 DegC. Have instructed interns to keep an eye on instrument temperatures over the weekend. Another test run of FFCAL was made at ~15:30 UT. Script seemed to behave as expected. Nominal run time may however be in excess of 1 hour. May need to trim some pointings from script in order to reduce run time and OPS motor temperature (+25.0 DegC). CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: FFCAL study ============================================================================= DATE: 18-Dec-1999 DOY: 352 OPERATIONS ENGINEER(S): E. Donaldson SCIENTIST: E. Breeveld CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE: 19-Dec-1999 DOY: 353 OPERATIONS ENGINEER(S): W. Hammond SCIENTIST: E. Breeveld CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE: 20-Dec-1999 DOY: 354 OPERATIONS ENGINEER(S): R. Yurow / C. Maroney SCIENTIST: E. Breeveld / A. Fludra CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE: 21-Dec-1999 DOY: 355 OPERATIONS ENGINEER(S): R. Yurow / C. Maroney SCIENTIST: A. Fludra CDS INSTRUMENT: Received a Parity error in Primary Memory location #8005ac4f. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE: 22-Dec-1999 DOY: 356 OPERATIONS ENGINEER(S): R. Yurow / C. Maroney SCIENTIST: A. Fludra CDS INSTRUMENT: Two parity errors were detected in the secondary (science) processor memory space. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE: 23-Dec-1999 DOY: 357 OPERATIONS ENGINEER(S): R. Yurow / C. Maroney SCIENTIST: A. Fludra CDS INSTRUMENT: The science plan was aborted at 19:50 UT to reboot the secondary processor. The secondary (science) processor was rebooted at 21:34 UT. CDS GROUND SYSTEM: The combination of a power surge and UPS momentary shutoff at 22:33 UT caused the CDS/SUMER network switch and CDS cluster to be shutdown until the switch was reset at 00:00 UT DOY 358 DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE: 26-Dec-1999 DOY: 360 OPERATIONS ENGINEER(S): R. Yurow SCIENTIST: A. Fludra CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE: 27-Dec-1999 DOY: 361 OPERATIONS ENGINEER(S): R. Yurow / C. Maroney SCIENTIST: A. Fludra CDS INSTRUMENT: While attempting to abort current study, inadvertantly sent "cb9abort" instead of "cb5abort". Began procedure to recover secondary processor. During this time the CDHS crashed at 18:50 UT. CDS was recovered at 23:30 UT. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE: 28-Dec-1999 DOY: 362 OPERATIONS ENGINEER(S): R. Yurow SCIENTIST: A. Fludra CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE: 29-Dec-1999 DOY: 363 OPERATIONS ENGINEER(S): C. Maroney SCIENTIST: A. Fludra CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE: 30-Dec-1999 DOY: 364 OPERATIONS ENGINEER(S): R. Yurow SCIENTIST: A. Fludra CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= From the CDS Operations Management Team in the Space Science & Technology Department at CCLRC Rutherford Appleton Laboratory Site maintained by John Rainnie. Last revised on Tuesday (17/Jul/2001) at 09:41. |