Scientific Operations | ||
|
February 2002============================================================================= DATE:1-February-2002 DOY: 032 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: T. Kucera CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:2-February-2002 DOY: 033 OPERATIONS ENGINEER(S): B. Donaldson SCIENTIST: T. Kucera CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:3-February-2002 DOY: 034 OPERATIONS ENGINEER(S): R. Yurow SCIENTIST: T. Kucera CDS INSTRUMENT: Slit position tests were conducted between 19:30 UT and 21:15 UT. The science plan was resumed at 00:00 UT DOY 35. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:4-February-2002 DOY: 035 OPERATIONS ENGINEER(S): R. Yurow SCIENTIST: B. Thompson CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:5-February-2002 DOY: 036 OPERATIONS ENGINEER(S): R. Yurow SCIENTIST: B. Thompson CDS INSTRUMENT: At 02:39 UT SOHO Spacecraft Telemetry was lost. Telemetry resumed at low rate. Analysis of telemetry showed that an ESR had occured and that a warm startup had been triggered. CDS along with the other experiments had been shut down and substitution heaters were disabled. Some time after 06:01 UT, CDS substitution heaters were enabled on the redundant side at the following values: Circuit #62 - 80% Circuit #63 - 90% At 12:04 UT the spacecraft entered CRP mode. At 16:00 UT a second warm start was triggered on S/C (standard procedure for recovery from a warm start). At this point, all substitution heaters were disabled. However, CDS substitution heaters were stuck in the ON position and thus continued to heat the instrument (effective 100% duty cycle). Heating continued until ~19:44 UT, when temperatures began to drop. During this time QTCI1A & QTCI1B both registered Yellow High temperature limit violations. CDS substitution heaters on Circuit #63 was enabled at 20:24 UT using a duty cycle of 90%. Substitution heaters on circuit #62 were enabled at 22:08 UT using a duty cycle of 50%. CDS GROUND SYSTEM: Nominal. DAY PLAN: CDS Recovery. COMMENTS: ============================================================================= DATE:6-February-2002 DOY: 037 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: B. Thompson CDS INSTRUMENT: At 17:38 UT, Duty cycle for substitution heater on COBS circuit #62 and #63 were adjusted as follows in preparation for CDS turn on: COBS circuit #62 - 70% COBS circuit #63 - 80%. CDS GROUND SYSTEM: Nominal. DAY PLAN: CDS Recovery. COMMENTS: ============================================================================= DATE:7-February-2002 DOY: 038 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: B. Thompson CDS INSTRUMENT: CDS Turn On: 1. All CDS relays were reset at 00:05 UT. 2. Substitution heaters were disabled at 00:15 UT pripr to turn on. 3. CDS was powered on at 00:19 UT. CDS performed a nominal power on onto processor 2. 4. CDS substitution heaters were reenabled at 00:34 UT with the following values: COBS Circuit #62 = 90% COBS Circuit #63 = 60% 5. CDS was then brought up to STANDBY mode at 01:06 UT. 6. CDS Doors were closed at 01:17 UT. 7. CDS returned to SNOOZE mode at 01:24 UT and left in a SAFE configuration. CDS GROUND SYSTEM: Nominal. DAY PLAN: CDS Recovery. COMMENTS: ============================================================================= DATE:8-February-2002 DOY: 039 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: B. Thompson CDS INSTRUMENT: At 19:49, the duty cycle for CDS substitution heaters were adjusted to the following configuration (in preparation for recovery on Sunday, DOY 41): COBS Circuit #62 from 90% to 80%. A Primary event error occured on the Primary Processor memory location at #800525f3 - this is in a Safe location. CDHS patches were loaded at 01:30 UT. CDS GROUND SYSTEM: Nominal. DAY PLAN: CDS Recovery. COMMENTS: ============================================================================= DATE:9-February-2002 DOY: 040 OPERATIONS ENGINEER(S): B. Donaldson SCIENTIST: B. Thompson CDS INSTRUMENT: In SNOOZE mode. CDS GROUND SYSTEM: Nominal. DAY PLAN: CDS Recovery. COMMENTS: ============================================================================= DATE:10-February-2002 DOY: 041 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: B. Thompson CDS INSTRUMENT: At 14:53 UT, CDS was brought out of SNOOZE mode and returned to READY_BOTH at 15:36 UT. Due to an error in commanding, patches had to be reloaded on the GIS. GIS patching was unsucessful for a number tries due to the command rate still set to 1/7 sec. Once command rate was set back to 1/3 sec, GIS patching worked correctly. In addition, niether the NIS nor the GIS HV were enabled at this point due to the NIS and GIS relays still being closed. Recovery procedures were implemeneted up until running cpt/UPDATE. CDS Substitution heaters were disabled by the FOT at ~17:40 UT. The NIS relay was enabled at 17:40 UT and the NIS was turned on and reset manually. Doors were then opened with MCU backup disabled at 17:51 UT. GIS HV relay was enabled manually at 18:45 UT. Two FULLCCD's were performed at 19:00 UT. After running these test studies it appears that the study count 24121 may have been used twice. The science plan was resumed at 20:00 UT. CDS appears to be nominal at this point. CDS GROUND SYSTEM: Nominal. DAY PLAN: CDS Recovery, Open Doors, Science Operations. COMMENTS: ============================================================================= DATE:11-February-2002 DOY: 042 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: A. Fludra CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:12-February-2002 DOY: 043 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: A. Fludra CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:13-February-2002 DOY: 044 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: A. Fludra CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:14-February-2002 DOY: 045 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: A. Fludra CDS INSTRUMENT: An NIS Register A Failure was detected. The NIS was reset at 14:41 UT. A Mechanism Lubrication was completed at 15:40 UT. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:15-February-2002 DOY: 046 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: A. Fludra CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:16-February-2002 DOY: 047 OPERATIONS ENGINEER(S): B. Donaldson SCIENTIST: A. Fludra CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:17-February-2002 DOY: 048 OPERATIONS ENGINEER(S): R. Yurow SCIENTIST: A. Fludra CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:18-February-2002 DOY: 049 OPERATIONS ENGINEER(S): CDS Operator (On Call) SCIENTIST: A. Young CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: US Holiday ============================================================================= DATE:19-February-2002 DOY: 050 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: A. Young CDS INSTRUMENT: An NIS Setup Register A Failure System Error was detected. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:20-February-2002 DOY: 051 OPERATIONS ENGINEER(S): C. Maroney SCIENTIST: A. Young CDS INSTRUMENT: A Flat Field Calibration study (FFCAL/v3) was completed at 16:00 UT. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:21-February-2002 DOY: 052 OPERATIONS ENGINEER(S): C. Maroney SCIENTIST: A. Young CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:22-February-2002 DOY: 053 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: A. Young CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:23-February-2002 DOY: 054 OPERATIONS ENGINEER(S): B. Donaldson SCIENTIST: A. Young CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:24-February-2002 DOY: 055 OPERATIONS ENGINEER(S): R. Yurow SCIENTIST: A. Young CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:25-February-2002 DOY: 056 OPERATIONS ENGINEER(S): C. Maroney SCIENTIST: A. Fludra CDS INSTRUMENT: At 16:17 UT, CTM 19 (Scan Mirror Motor) violated Yellow High limits at 34 DegC for 2 minutes. CTM 19, then returned to 30 DegC - Nominal. USUN_6/v2 (Full Sun Spectral) was running during this time. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:26-February-2002 DOY: 057 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: A. Fludra CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:27-February-2002 DOY: 058 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: A. Fludra CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: From 14:15 UT - 14:25 UT, 36 NOOP commands (total) were sent to the new CMS for testing. No commands reached CDS during test. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:28-February-2002 DOY: 059 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: A. Fludra CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= From the CDS Operations Management Team in the Space Science & Technology Department at CCLRC Rutherford Appleton Laboratory Site maintained by John Rainnie. Last revised on Tuesday (17/Jul/2001) at 09:41. |