DATE:1-February-2002
DOY: 032
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: T. Kucera
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:2-February-2002
DOY: 033
OPERATIONS ENGINEER(S): B. Donaldson
SCIENTIST: T. Kucera
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:3-February-2002
DOY: 034
OPERATIONS ENGINEER(S): R. Yurow
SCIENTIST: T. Kucera
CDS INSTRUMENT: 
  Slit position tests were conducted between 19:30 UT and 21:15 UT.
The science plan was resumed at 00:00 UT DOY 35.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:4-February-2002
DOY: 035
OPERATIONS ENGINEER(S): R. Yurow
SCIENTIST: B. Thompson
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:5-February-2002
DOY: 036
OPERATIONS ENGINEER(S): R. Yurow
SCIENTIST: B. Thompson
CDS INSTRUMENT: 
  At 02:39 UT SOHO Spacecraft Telemetry was lost.  Telemetry resumed at low
rate.  Analysis of telemetry showed that an ESR had occured and that a warm
startup had been triggered.  CDS along with the other experiments had been
shut down and substitution heaters were disabled.
  Some time after 06:01 UT, CDS substitution heaters were enabled on the
redundant side at the following values:
     Circuit #62 - 80%
     Circuit #63 - 90%
  At 12:04 UT the spacecraft entered CRP mode.
  At 16:00 UT a second warm start was triggered on S/C (standard procedure
for recovery from a warm start).  At this point, all substitution heaters
were disabled.  However, CDS substitution heaters were stuck in the ON
position and thus continued to heat the instrument (effective 100% duty
cycle).  Heating continued until ~19:44 UT, when temperatures began to drop.
During this time QTCI1A & QTCI1B both registered Yellow High temperature
limit violations.
  CDS substitution heaters on Circuit #63 was enabled at 20:24 UT using a 
duty cycle of 90%.  Substitution heaters on circuit #62 were enabled at
22:08 UT using a duty cycle of 50%.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: CDS Recovery.
COMMENTS: 
=============================================================================
DATE:6-February-2002
DOY: 037
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: B. Thompson
CDS INSTRUMENT: 
  At 17:38 UT, Duty cycle for substitution heater on COBS circuit #62 and #63
were adjusted as follows in preparation for CDS turn on:
     COBS circuit #62 - 70%
     COBS circuit #63 - 80%.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: CDS Recovery.
COMMENTS: 
=============================================================================
DATE:7-February-2002
DOY: 038
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: B. Thompson
CDS INSTRUMENT: 
  CDS Turn On:
  1.  All CDS relays were reset at 00:05 UT.
  2.  Substitution heaters were disabled at 00:15 UT pripr to turn on.
  3.  CDS was powered on at 00:19 UT.  CDS performed a nominal power on onto
      processor 2.
  4.  CDS substitution heaters were reenabled at 00:34 UT with the following
      values:  COBS Circuit #62 = 90%
               COBS Circuit #63 = 60%
  5.  CDS was then brought up to STANDBY mode at 01:06 UT.
  6.  CDS Doors were closed at 01:17 UT.
  7.  CDS returned to SNOOZE mode at 01:24 UT and left in a 
      SAFE configuration.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: CDS Recovery.
COMMENTS: 
=============================================================================
DATE:8-February-2002
DOY: 039
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: B. Thompson
CDS INSTRUMENT: 
  At 19:49, the duty cycle for CDS substitution heaters were adjusted to the
following configuration (in preparation for recovery on Sunday, DOY 41):
     COBS Circuit #62 from 90% to 80%.
  A Primary event error occured on the Primary Processor memory location at
#800525f3 - this is in a Safe location.
  CDHS patches were loaded at 01:30 UT.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: CDS Recovery.
COMMENTS: 
=============================================================================
DATE:9-February-2002
DOY: 040
OPERATIONS ENGINEER(S): B. Donaldson
SCIENTIST: B. Thompson
CDS INSTRUMENT: In SNOOZE mode.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: CDS Recovery.
COMMENTS: 
=============================================================================
DATE:10-February-2002
DOY: 041
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: B. Thompson
CDS INSTRUMENT: 
  At 14:53 UT, CDS was brought out of SNOOZE mode and returned to READY_BOTH
at 15:36 UT.  Due to an error in commanding, patches had to be reloaded on
the GIS.  GIS patching was unsucessful for a number tries due to the command
rate still set to 1/7 sec.  Once command rate was set back to 1/3 sec, GIS
patching worked correctly.  In addition, niether the NIS nor the GIS HV were
enabled at this point due to the NIS and GIS relays still being closed.
Recovery procedures were implemeneted up until running cpt/UPDATE.
  CDS Substitution heaters were disabled by the FOT at ~17:40 UT.
  The NIS relay was enabled at 17:40 UT and the NIS was turned on and reset
manually.
  Doors were then opened with MCU backup disabled at 17:51 UT.
  GIS HV relay was enabled manually at 18:45 UT.
  Two FULLCCD's were performed at 19:00 UT.  After running these test studies
it appears that the study count 24121 may have been used twice.
  The science plan was resumed at 20:00 UT.
  CDS appears to be nominal at this point.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: CDS Recovery, Open Doors, Science Operations.
COMMENTS: 
=============================================================================
DATE:11-February-2002
DOY: 042
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: A. Fludra
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:12-February-2002
DOY: 043
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: A. Fludra
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:13-February-2002
DOY: 044
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: A. Fludra
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:14-February-2002
DOY: 045
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: A. Fludra
CDS INSTRUMENT: 
  An NIS Register A Failure was detected.
  The NIS was reset at 14:41 UT.
  A Mechanism Lubrication was completed at 15:40 UT.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:15-February-2002
DOY: 046
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: A. Fludra
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:16-February-2002
DOY: 047
OPERATIONS ENGINEER(S): B. Donaldson
SCIENTIST: A. Fludra
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:17-February-2002
DOY: 048
OPERATIONS ENGINEER(S): R. Yurow
SCIENTIST: A. Fludra
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:18-February-2002
DOY: 049
OPERATIONS ENGINEER(S): CDS Operator (On Call)
SCIENTIST: A. Young
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: US Holiday
=============================================================================
DATE:19-February-2002
DOY: 050
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: A. Young
CDS INSTRUMENT: 
  An NIS Setup Register A Failure System Error was detected.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:20-February-2002
DOY: 051
OPERATIONS ENGINEER(S): C. Maroney
SCIENTIST: A. Young
CDS INSTRUMENT: 
  A Flat Field Calibration study (FFCAL/v3) was completed at 16:00 UT.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:21-February-2002
DOY: 052
OPERATIONS ENGINEER(S): C. Maroney
SCIENTIST: A. Young
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:22-February-2002
DOY: 053
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: A. Young
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:23-February-2002
DOY: 054
OPERATIONS ENGINEER(S): B. Donaldson
SCIENTIST: A. Young
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:24-February-2002
DOY: 055
OPERATIONS ENGINEER(S): R. Yurow
SCIENTIST: A. Young
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:25-February-2002
DOY: 056
OPERATIONS ENGINEER(S): C. Maroney
SCIENTIST: A. Fludra
CDS INSTRUMENT: 
  At 16:17 UT, CTM 19 (Scan Mirror Motor) violated Yellow High limits at
34 DegC for 2 minutes.  CTM 19, then returned to 30 DegC - Nominal.  
USUN_6/v2 (Full Sun Spectral) was running during this time.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:26-February-2002
DOY: 057
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: A. Fludra
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:27-February-2002
DOY: 058
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: A. Fludra
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: 
  From 14:15 UT - 14:25 UT, 36 NOOP commands (total) were sent to the new
CMS for testing.  No commands reached CDS during test.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:28-February-2002
DOY: 059
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: A. Fludra
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================



From the CDS Operations Management Team in the Space Science & Technology Department at CCLRC Rutherford Appleton Laboratory
Site maintained by John Rainnie.
Last revised on Tuesday (17/Jul/2001) at 09:41.