![]() |
![]() |
![]() |
![]() |
Scientific Operations | ![]() |
![]() |
|
February 2007============================================================================== DATE: 1-Feb-2007 DOY: 032 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: P. Young (RAL) CDS INSTRUMENT: CDHS patching was performed from 15:53 UT - 21:45 UT. All patching was successfully completed. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================== DATE: 2-Feb-2007 DOY: 033 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: P. Young (RAL) CDS INSTRUMENT: NIS relay was enabled at 00:21 UT. NIS was turned on and electrical performance was verified by reseting the NIS (ability to receive and process commands). GIS relay was enabled at 00:50 UT. GIS was turned on and electrical performance was verified by enabling the HVs on all four detectors and then setting each detector to its partking voltage. Following testing, the NIS and GIS were turned OFF. CDS was placed in STANDBY at 20:20 UT. CDS was moved to READY_BOTH at 20:39 UT. GIS software (v2.6) was verified on-board, so there was no need to patch the GIS software. VDS was restarted at 20:49 UT (nominal). CDS recovery to READY_BOTH was completed at 21:10 UT. CDS substitution heaters were reset to the following: #62 - 10% (remain on) #63 - 60% (turned off) Doors remain CLOSED. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================== DATE: 3-Feb-2007 DOY: 034 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: P. Young (RAL) CDS INSTRUMENT: NIS and GIS test studies were perfomed between 00:00 UT and 05:00 UT. No anomolies were detected. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================== DATE: 4-Feb-2007 DOY: 035 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: P. Young (RAL) CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================== DATE: 5-Feb-2007 DOY: 036 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: R. Milligan (GSFC) CDS INSTRUMENT: The MCU was reset (MCU timeout ~48 hours) at 15:25 UT. At 15:51 UT The FOT executed the ESR Recovery for CDS (C-06C, lines 9 and 10) by disabling substitution heaters (#62 only) and reseting the duty cycle to 80%. ESR flag was also enabled for CDS at 16:00 UT. Temperatures will return to nominal conditions today and CDS will resume science at 00:00 UT DOY 037. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================== DATE: 6-Feb-2007 DOY: 037 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: R. Milligan (GSFC) CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================== DATE: 7-Feb-2007 DOY: 038 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: R. Milligan (GSFC) CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================== DATE: 8-Feb-2007 DOY: 039 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: R. Milligan (GSFC) CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================== DATE: 9-Feb-2007 DOY: 040 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: R. Milligan (GSFC) CDS INSTRUMENT: A primary event error was detected at address #800721D7. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================== DATE: 10-Feb-2007 DOY: 041 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: R. Milligan (GSFC) CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================== DATE: 11-Feb-2007 DOY: 042 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: R. Milligan (GSFC) CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================== DATE: 12-Feb-2007 DOY: 043 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: J. Ireland (GSFC) CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: A VDS Setup Register A failure was detected. A secondary parity error was detected at address #8000699f. DAY PLAN: Science Operations. COMMENTS: ============================================================================== DATE: 13-Feb-2007 DOY: 044 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: J. Ireland (GSFC) CDS INSTRUMENT: A submode change from submode 6 to submode 5 occurred at 22:29 UT. CDS is nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================== DATE: 14-Feb-2007 DOY: 045 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: J. Ireland (GSFC) CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================== DATE: 15-Feb-2007 DOY: 046 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: J. Ireland (GSFC) CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================== DATE: 16-Feb-2007 DOY: 047 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: J. Ireland (GSFC) CDS INSTRUMENT: A primary parity error was detected at address #80038cfb - IIF Detect Module (SAFE). A mechanism lubrication was performed at 14:45 UT. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================== DATE: 17-Feb-2007 DOY: 048 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: J. Ireland (GSFC) CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================== DATE: 18-Feb-2007 DOY: 049 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: J. Ireland (GSFC) CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================== DATE: 19-Feb-2007 DOY: 050 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: C. Maroney (GSFC) CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Keyhole Operations. COMMENTS: ============================================================================== DATE: 20-Feb-2007 DOY: 051 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: C. Maroney (GSFC) CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Keyhole Operations. COMMENTS: ============================================================================== DATE: 21-Feb-2007 DOY: 052 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: C. Maroney (GSFC) CDS INSTRUMENT: A secondary memory error was detected at address #80051c7f. CDS GROUND SYSTEM: Nominal. DAY PLAN: Keyhole Operations. COMMENTS: ============================================================================== DATE: 22-Feb-2007 DOY: 053 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: C. Maroney (GSFC) CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Keyhole Operations. COMMENTS: ============================================================================== DATE: 23-Feb-2007 DOY: 054 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: C. Maroney (GSFC) CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Keyhole Operations. COMMENTS: ============================================================================== DATE: 24-Feb-2007 DOY: 055 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: C. Maroney (GSFC) CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Keyhole Operations. COMMENTS: ============================================================================== DATE: 25-Feb-2007 DOY: 056 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: C. Maroney (GSFC) CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Keyhole Operations. COMMENTS: ============================================================================== DATE: 26-Feb-2007 DOY: 057 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: P. Young (RAL) CDS INSTRUMENT: CDS doors were CLOSED at 15:15 UT for spacecraft maneuvers on Tuesday. ESR warning flag was disabled for CDS. CDS GROUND SYSTEM: Nominal. DAY PLAN: Keyhole Operations. COMMENTS: ============================================================================== DATE: 27-Feb-2007 DOY: 058 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: P. Young (RAL) CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Keyhole Operations. COMMENTS: ============================================================================== DATE: 28-Feb-2007 DOY: 059 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: P. Young (RAL) CDS INSTRUMENT: The science plan was aborted at 21:30 UT in order to open the doors. CDS doors were opened 21:42 UT. The science plan will resume during next contact at DOY 60 13:16 UT. CDS GROUND SYSTEM: Nominal. DAY PLAN: Keyhole Operations. COMMENTS: ============================================================================== From the CDS Operations Management Team in the Space Science & Technology Department at CCLRC Rutherford Appleton Laboratory Site maintained by John Rainnie. Last revised on Tuesday (22/Apr/2008) at 21:05. |