Scientific Operations | ||
|
February 1997============================================================================== DATE: 1-Feb-1997 16:31:48 DOY: 032 OPERATIONS ENGINEER(S): G. Dimitoglou SCIENTIST: R. Thomas/A. Fludra CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. Changed disk from /cdsd3 to /cdsd4 DAY PLAN: Science Operations COMMENTS: ============================================================================== DATE: 2-Feb-1997 16:31:48 DOY: 033 OPERATIONS ENGINEER(S): G. Dimitoglou SCIENTIST: R. Thomas/A. Fludra CDS INSTRUMENT: SEU detected on the primary and the secondary. Both were determined to be in an area such that the instrument could continue temporarily with no problems. The instrument will be rebooted when an optimal time arises. CDS GROUND SYSTEM: Nominal. Changed disk from /cdsr2 to /cdsr3. DAY PLAN: Science Operations COMMENTS: ============================================================================== DATE: 3-Feb-1997 DOY: 034 OPERATIONS ENGINEER(S): G. Dimitoglou SCIENTIST: R. Thomas CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations COMMENTS: ============================================================================== DATE: 4-Feb-1997 DOY: 035 OPERATIONS ENGINEER(S): C. Haskell/R. Yurow SCIENTIST: R. Thomas CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Changed the following raster durations: 10/7 from 2510 to 2528 11/7 from 537 to 542 13/8 from 1304 to 1312 14/1 from 1373 to 1403 17/1 from 11531 to 11626 34/10 from 5308 to 5335 121/1 from 349 to 571 Imported study 151/1 USUN_10 to the EOF. DAY PLAN: Science Operations COMMENTS: ============================================================================== DATE: 5-Feb-1997 DOY: 036 OPERATIONS ENGINEER(S): G. Dimitoglou/C. Haskell SCIENTIST: R. Thomas CDS INSTRUMENT: VDS Register A Failure recorded. A convenient time was found to perform a reboot at 21:30 UT. The instrument was rebooted with no problems. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations COMMENTS: ============================================================================== DATE: 6-Feb-1997 DOY: 037 OPERATIONS ENGINEER(S): C. Haskell/R. Yurow SCIENTIST: R. Thomas CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations COMMENTS: ============================================================================== DATE: 7-Feb-1997 DOY: 038 OPERATIONS ENGINEER(S): C. Haskell/R. Yurow SCIENTIST: R. Thomas CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations COMMENTS: ============================================================================== DATE: 8-Feb-1997 DOY: 039 OPERATIONS ENGINEER(S): C. Haskell SCIENTIST: D. Zarro CDS INSTRUMENT: Secondary SEU, reboot was nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations COMMENTS: ============================================================================== DATE: 9-Feb-1997 DOY: 040 OPERATIONS ENGINEER(S): C. Haskell SCIENTIST: D. Zarro CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations COMMENTS: ============================================================================== DATE: 10-Feb-1997 DOY: 041 OPERATIONS ENGINEER(S): C. Haskell/R. Yurow SCIENTIST: D. Zarro CDS INSTRUMENT: Nominal. First study of tommorows plan had to be started manually. CDS GROUND SYSTEM: Made the following raster duration changes: 10/21 from 5523 to 5598 36/31 from 2144 to 2187 123/1 from 706 to 716 125/2 from 2471 to 2490 DAY PLAN: Science Operations COMMENTS: ============================================================================== DATE: 11-Feb-1997 DOY: 042 OPERATIONS ENGINEER(S): C. Haskell/R. Yurow SCIENTIST: D. Zarro CDS INSTRUMENT: Watchdog error at 22:50 UT. Due to end of DSN contact, the instrument could not be rebooted until 05:30 UT Feb. 12. The reboot was nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations COMMENTS: ============================================================================== DATE: 12-Feb-1997 DOY: 043 OPERATIONS ENGINEER(S): G. Dimitoglou/R. Yurow SCIENTIST: D. Zarro CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Imported the study int_dist_18.def to the EOF. Made the following raster duration changes: 11/29 from 2699 to 2860 DAY PLAN: Science Operations COMMENTS: ============================================================================== DATE: 13-Feb-1997 DOY: 044 OPERATIONS ENGINEER(S): C. Haskell/R. Yurow SCIENTIST: D. Zarro CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Imported the study chms_19.def to the EOF. Made the following raster duration changes: 11/30 from 1199 to 1220 DAY PLAN: Science Operations COMMENTS: ============================================================================== DATE: 14-Feb-1997 DOY: 045 OPERATIONS ENGINEER(S): G. Dimitoglou/R. Yurow SCIENTIST: W. Thompson CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations COMMENTS: ============================================================================== DATE: 15-Feb-1997 DOY: 046 OPERATIONS ENGINEER(S): R. Yurow SCIENTIST: W. Thompson CDS INSTRUMENT: A WATCHDOG error occured at 05:40 UT. CDS was rebooted at 07:50 UT. The MCP voltage on each of the GIS detectors was incorrectly set during GIS studies today. The MCP Voltage remained at parking throughout each study. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations COMMENTS: A SVM thermal reconfiguration occured at 10:14 UT. due to an instrument anomaly with CEPAC. CEPAC was subsequently switched off. The SVM swiched over to the REDUNDANT (B) side. The switch back to the NOMINAL (A) side occured at ~20:00 UT ============================================================================== DATE: 16-Feb-1997 DOY: 047 OPERATIONS ENGINEER(S): R. Yurow SCIENTIST: W. Thompson CDS INSTRUMENT: A WATCHDOG error occured at 07:57 UT. CDS was rebooted at 12:25 UT. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations COMMENTS: ============================================================================== DATE: 17-Feb-1997 DOY: 048 OPERATIONS ENGINEER(S): C. Haskell SCIENTIST: W. Thompson CDS INSTRUMENT: Lube study performed. During the lube study, a secondary event occurred. Secondary was rebooted and all was okay. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations COMMENTS: ============================================================================== DATE: 18-Feb-1997 DOY: 049 OPERATIONS ENGINEER(S): C. Haskell SCIENTIST: W. Thompson CDS INSTRUMENT: GIS did not run a study due to the HVs not being set via commands in the series table. A cpt patch is in the works to correct the problem. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations COMMENTS: ============================================================================== DATE: 19-Feb-1997 DOY: 050 OPERATIONS ENGINEER(S): C. Haskell SCIENTIST: W. Thompson CDS INSTRUMENT: Mail not working properly for some unknown reason. GIS series tables checked for missing commands - no problems found. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations COMMENTS: ============================================================================== DATE: 20-Feb-1997 DOY: 051 OPERATIONS ENGINEER(S): C. Haskell/R. Yurow SCIENTIST: W. Thompson CDS INSTRUMENT: Nominal CDS GROUND SYSTEM: Mail is not currently working on any of the cds* machines. The problem is still being resolved. A software update was performed at 22:39 UT DAY PLAN: Science Operations COMMENTS: ============================================================================== DATE: 21-Feb-1997 DOY: 052 OPERATIONS ENGINEER(S): C. Haskell SCIENTIST: W. Thompson CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Mail problem continues. DAY PLAN: Science Operations COMMENTS: ============================================================================== DATE: 22-Feb-1997 DOY: 053 OPERATIONS ENGINEER(S): G. Dimitoglou SCIENTIST: S. Matthews CDS INSTRUMENT: Watchdog Error. Rebooted. Nominal. CDS GROUND SYSTEM: Mail problem continues. DAY PLAN: Science Operations COMMENTS: ============================================================================== DATE: 23-Feb-1997 DOY: 054 OPERATIONS ENGINEER(S): G. Dimitoglou SCIENTIST: S. Matthews CDS INSTRUMENT: VDS Error. Rebooted. Nominal. CDS GROUND SYSTEM: Mail problem continues. DAY PLAN: Science Operations COMMENTS: ============================================================================== DATE: 24-Feb-1997 DOY: 055 OPERATIONS ENGINEER(S): C. Haskell/R. Yurow SCIENTIST: S. Matthews CDS INSTRUMENT: The NIS was incorrectly setup after it was rebooted on 97 DOY 54. NIS science data from DOY 54 16:37UT to DOY 55 16:41UT was corrupted. The safety of the detector was not compromised. CDS GROUND SYSTEM: Mail problem was resolved. DAY PLAN: Science Operations COMMENTS: ============================================================================== DATE: 25-Feb-1997 DOY: 056 OPERATIONS ENGINEER(S): C. Haskell/R. Yurow SCIENTIST: S. Matthews CDS INSTRUMENT: A WATCHDOG error ocurred prior to 00:34 UT. The instrument was rebooted at 01:04 UT. Nominal after reboot. CDS GROUND SYSTEM: Mail is not working again. Updated the following raster durations: 11/30 from 1220 to 1319 103/1 from 2111 to 2154 DAY PLAN: Science Operations COMMENTS: ============================================================================== DATE: 26-Feb-1997 DOY: 057 OPERATIONS ENGINEER(S): C. Haskell/R. Yurow SCIENTIST: S. Matthews CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Mail problem seems to be solved. DAY PLAN: Science Operations COMMENTS: ============================================================================== DATE: 27-Feb-1997 DOY: 058 OPERATIONS ENGINEER(S): C. Haskell/R. Yurow SCIENTIST: S. Matthews CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Problem discovered with the Jukebox being able to inventory tapes. Currently unresolved. DAY PLAN: Science Operations COMMENTS: ============================================================================== DATE: 28-Feb-1997 DOY: 059 OPERATIONS ENGINEER(S): C. Haskell/R. Yurow SCIENTIST: S. Matthews CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Problem resolved with the networker. DAY PLAN: Science Operations COMMENTS: ============================================================================== From the CDS Operations Management Team in the Space Science & Technology Department at CCLRC Rutherford Appleton Laboratory Site maintained by John Rainnie. Last revised on Tuesday (17/Jul/2001) at 09:40. |