DATE:1-Jan-2003
DOY: 001
OPERATIONS ENGINEER(S): C. Maroney
SCIENTIST: W. Thompson
CDS INSTRUMENT: 
  A parity error was detected on the Primary Processor at address
#8005635b.  This is in the Science Module - SAFE.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:2-Jan-2003
DOY: 002
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: W. Thompson
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
   The study numbers s26585 thro' s26592 were assigned on
   15-Oct-1998 and so the studies in January 2003 that 
   should have used those numbers have been reassigned 
   the numbers s13585 thro' s13592.
=============================================================================
DATE:3-Jan-2003
DOY: 003
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: W. Thompson
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: 
  The following study was imported to the EOF:  usun_4_1.def.
DAY PLAN: Science Operations.
COMMENTS: 
   The study numbers s26585 thro' s26592 were assigned on
   15-Oct-1998 and so the studies in January 2003 that 
   should have used those numbers have been reassigned 
   the numbers s13585 thro' s13592.
=============================================================================
DATE:4-Jan-2003
DOY: 004
OPERATIONS ENGINEER(S): C. King
SCIENTIST: W. Thompson
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
   The study numbers s26585 thro' s26592 were assigned on
   15-Oct-1998 and so the studies in January 2003 that 
   should have used those numbers have been reassigned 
   the numbers s13585 thro' s13592.
=============================================================================
DATE:5-Jan-2003
DOY: 005
OPERATIONS ENGINEER(S): J. Siedel  
SCIENTIST: W. Thompson
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:6-Jan-2003
DOY: 006
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: T. Kucera
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:7-Jan-2003
DOY: 007
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow  
SCIENTIST: T. Kucera
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:8-Jan-2003
DOY: 008
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow  
SCIENTIST: T. Kucera
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:9-Jan-2003
DOY: 009
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow  
SCIENTIST: T. Kucera
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:10-Jan-2003
DOY: 010
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow  
SCIENTIST: T. Kucera
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: 
  The following  studies were imported to the EOF:
ardiag_4_1.def
ardiag_5_2.def
arcont_89.def
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:11-Jan-2003
DOY: 011
OPERATIONS ENGINEER(S): C. King
SCIENTIST: T. Kucera
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:12-Jan-2003
DOY: 012
OPERATIONS ENGINEER(S): R. Yurow  
SCIENTIST: T. Kucera
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:13-Jan-2003
DOY: 013
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow  
SCIENTIST: P. Young
CDS INSTRUMENT: 
  A Secondary error was detected at address #8006d4ab.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:14-Jan-2003
DOY: 014
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow  
SCIENTIST: P. Young
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:15-Jan-2003
DOY: 015
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow  
SCIENTIST: P. Young
CDS INSTRUMENT: 
  Due to an error when running CPT, it became necessary to stop and restart
the science plan.  The science plan was stopped at 23:34 UT.  CPT was then
rerun with the 'Delete Tables' option using a modified science that is set
to begin at 1:15 UT (DOY 016).
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:16-Jan-2003
DOY: 016
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow  
SCIENTIST: P. Young
CDS INSTRUMENT: 
  A Mechanism Lubrication was completed at 15:25 UT.
  A VDS Reset was completed at 15:48 UT.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: NOTE: Eng telemetry rate was set incorrectly and thus affected 
study durations between 14:28 UT and ~23:00 UT. 
Problem corrected at ~23:00 UT.
=============================================================================
DATE:17-Jan-2003
DOY: 017
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow  
SCIENTIST: P. Young
CDS INSTRUMENT: 
  The science plan was halted at 01:43 UT (DOY 018) in order to be able to
reload ascience plan which was generated using the delete all tables option.
It was necesary to do this because the original run of CPT included a study
that had already been loaded.  No other remedy for this situation was deemed
feasable.  The science plan will resume at 06:30 UT.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:18-Jan-2003
DOY: 018
OPERATIONS ENGINEER(S): C. Maroney  
SCIENTIST: J. Ireland
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:19-Jan-2003
DOY: 019
OPERATIONS ENGINEER(S): C. King  
SCIENTIST: J. Ireland
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:20-Jan-2003
DOY: 020
OPERATIONS ENGINEER(S): R. Yurow  
SCIENTIST: J. Ireland
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: U.S. Holiday
=============================================================================
DATE:21-Jan-2003
DOY: 021
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow  
SCIENTIST: J. Ireland
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: 
  The following raster duration change was made:
ARDIAG_2    rid/11    var/106    5066s - 6025s.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:22-Jan-2003
DOY: 022
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow  
SCIENTIST: J. Ireland
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:23-Jan-2003
DOY: 023
OPERATIONS ENGINEER(S): R. Yurow  
SCIENTIST: J. Ireland
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:24-Jan-2003
DOY: 024
OPERATIONS ENGINEER(S): C. Maroney  
SCIENTIST: J. Ireland
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:25-Jan-2003
DOY: 025
OPERATIONS ENGINEER(S): C. Maroney  
SCIENTIST: J. Ireland
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:26-Jan-2003
DOY: 026
OPERATIONS ENGINEER(S): C. King  
SCIENTIST: J. Ireland
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:27-Jan-2003
DOY: 027
OPERATIONS ENGINEER(S): C. Maroney  
SCIENTIST: S. McIntosh
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: 
  The following studies were imported to the EOF:
    pobs3_12.def
    pststr_2.def
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:28-Jan-2003
DOY: 028
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow  
SCIENTIST: S. McIntosh
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:29-Jan-2003
DOY: 029
OPERATIONS ENGINEER(S): R. Yurow  
SCIENTIST: S. McIntosh
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:30-Jan-2003
DOY: 030
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow  
SCIENTIST: S. McIntosh
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: 
  The following studies were imported to the EOF:
    standmc1_1.def
    standmc2_48.def
  The raster duration for ARDIAG_2 (rid/11 var/106), currently 6025 sec., 
was returned to its previous duration of 5083 sec.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:31-Jan-2003
DOY: 031
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow  
SCIENTIST: S. McIntosh
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================










From the CDS Operations Management Team in the Space Science & Technology Department at CCLRC Rutherford Appleton Laboratory
Site maintained by John Rainnie.
Last revised on Tuesday (17/Jul/2001) at 09:40.