Scientific Operations
 Front Page
 Scientific Ops
  » Plans
  » Pointings
  » Report
  » Requests
  » Log
  » Notes
  » Tech Info
 Engineering
 Software
 Results
 Gallery
 Atlas
>  Press
 Links
 Project
 Newsletter
 Copyright
January 2007
 
==============================================================================
DATE: 1-Jan-2007
DOY: 001
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: P. Young (RAL)
CDS INSTRUMENT: An on-board mechanism lubrication was performed at 21:30 UT.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
==============================================================================
DATE: 2-Jan-2007
DOY: 002
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: P. Young (RAL)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
==============================================================================
DATE: 3-Jan-2007
DOY: 003
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: P. Young (RAL)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
==============================================================================
DATE: 4-Jan-2007
DOY: 004
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: P. Young (RAL)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
==============================================================================
DATE: 5-Jan-2007
DOY: 005
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: P. Young (RAL)
CDS INSTRUMENT: Flat field calibrations (FFCAL/v5) were performed from 22:00
through 23:45 UT.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
==============================================================================
DATE: 6-Jan-2007
DOY: 006
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: P. Young (RAL)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
==============================================================================
DATE: 7-Jan-2007
DOY: 007
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: P. Young (RAL)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
==============================================================================
DATE: 8-Jan-2007
DOY: 008
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: D. Bewsher (RAL)
CDS INSTRUMENT: The emergency study was started because SYNOP was not loaded.
The emergency study ran until FSUN began.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
==============================================================================
DATE: 9-Jan-2007
DOY: 009
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: D. Bewsher (RAL)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
==============================================================================
DATE: 10-Jan-2007
DOY: 010
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: D. Bewsher (RAL)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
==============================================================================
DATE: 11-Jan-2007
DOY: 011
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: D. Bewsher (RAL)
CDS INSTRUMENT: An NIS setup Register A failure was detected.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
==============================================================================
DATE: 12-Jan-2007
DOY: 012
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: D. Bewsher (RAL)
CDS INSTRUMENT: A primary parity error was detected at address #800477b7, a
science module (SAFE).
cdsfits disk arch31 was added and is currently the active cdsfits directory 
for 2007 (all 2007 files are there). 
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
==============================================================================
DATE: 13-Jan-2007
DOY: 013
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: D. Bewsher (RAL)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
==============================================================================
DATE: 14-Jan-2007
DOY: 014
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: D. Bewsher (RAL)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
==============================================================================
DATE: 15-Jan-2007
DOY: 015
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: T. Kucera (GSFC)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
==============================================================================
DATE: 16-Jan-2007
DOY: 016
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: T. Kucera (GSFC)
CDS INSTRUMENT: A secondary memory error was detected at address #8007A1CB.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
==============================================================================
DATE: 17-Jan-2007
DOY: 017
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: T. Kucera (GSFC)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
==============================================================================
DATE: 18-Jan-2007
DOY: 018
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: T. Kucera (GSFC)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
==============================================================================
DATE: 19-Jan-2007
DOY: 019
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: T. Kucera (GSFC)
CDS INSTRUMENT: A primary parity error was detected at address #800477b7, a 
science module (SAFE).
A secondary parity error was detected at address #8007a1cb, a science module.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
==============================================================================
DATE: 20-Jan-2007
DOY: 020
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: T. Kucera (GSFC)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
==============================================================================
DATE: 21-Jan-2007
DOY: 021
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: T. Kucera (GSFC)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
==============================================================================
DATE: 22-Jan-2007
DOY: 022
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: B. Thompson (GSFC)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
==============================================================================
DATE: 23-Jan-2007
DOY: 023
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: B. Thompson (GSFC)
CDS INSTRUMENT: A primary parity error was detected at address #800798ff - 
Sequence Tables (NOT SAFE). A reboot should be scheduled soon.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
==============================================================================
DATE: 24-Jan-2007
DOY: 024
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: B. Thompson (GSFC)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
==============================================================================
DATE: 25-Jan-2007
DOY: 025
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: B. Thompson (GSFC)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
==============================================================================
DATE: 26-Jan-2007
DOY: 026
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: B. Thompson (GSFC)
CDS INSTRUMENT: An on-board mechanism lubrication was performed at 17:00 UT.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
==============================================================================
DATE: 27-Jan-2007
DOY: 027
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: B. Thompson (GSFC)
CDS INSTRUMENT: SUMER redundant LCL tripped all instruments' LCL's 'OFF'. CDS 
is OFF, Doors OPEN, subheaters ON (#62 - 60%, #63 - 60%, this was negotiated
down until temps were reasonable). 
A submode change from submode 6 to submode 5 was initiated for SUMER recovery.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
==============================================================================
DATE: 28-Jan-2007
DOY: 028
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: B. Thompson (GSFC)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
==============================================================================
DATE: 29-Jan-2007
DOY: 029
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: P. Young (RAL)
CDS INSTRUMENT: From the FOT: TSTOL: L_FL_SAFE was started at 15:20 UT.
x_exp_prep_on was started at 15:27 UT. 
TSTOL: C_FL_PWRON_N was started at 15:36 UT.
The script was aborted and TSTOL: C_FL_EMEROF began at 16:36 UT because of a
script error/typo.
CDS subheaters are ON (#62 - 60%, #63 - 60%).
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
==============================================================================
DATE: 30-Jan-2007
DOY: 030
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: P. Young (RAL)
CDS INSTRUMENT: From the FOT: C-08 "POWER CDS ON".
TSTOL: C_FL_SAFE was started at 15:53 UT.
xprep enabling nominal side was started at 15:58 UT.
TSTOL: C_FL_PWRON_N was started at 16:10 UT.
xprep enabling redundant side was started at 16:26 UT.
CDS Recovery Part 1:
CDS Heaters were turned OFF at 16:47 UT. 
CDS Mechanisms were ENABLED at 16:46 UT.
CDS went to standby at 16:53 UT.
OPS and MIRROR were moved (SLIT DISABLED).
Doors were CLOSED at 17:10 UT.
CDS went to SNOOZE mode at 17:16 UT.
Substitution heaters were turned on at 17:46 UT (#62 - 90%, #63 - 60%).
ESR flags DISABLED.
Limit violation sheet submitted to cover all CTMF (NO VALUES).
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
==============================================================================
DATE: 31-Jan-2007
DOY: 031
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: P. Young (RAL)
CDS INSTRUMENT: The MCU relay was enabled at 22:51 UT. The MCU was powered up 
at 22:56 UT. The MCU recomissioning script was successfully completed. The 
MCU was powered down at 01:40 UT DOY 32. 
Due to CDS getting excessively hot, the duty cycle of the substitution heaters 
was changed to #62 - 70%, #63 - 50% at 03:12 UT DOY 32.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
==============================================================================


From the CDS Operations Management Team in the Space Science & Technology Department at CCLRC Rutherford Appleton Laboratory
Site maintained by John Rainnie.
Last revised on Tuesday (22/Apr/2008) at 21:04.