Scientific Operations | ||
|
January 1998============================================================================== DATE: 01-January-1998 DOY: 001 OPERATIONS ENGINEER(S): A. Hammond/E. Donaldson SCIENTIST: A. Fludra CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================== DATE: 02-January-1998 DOY: 002 OPERATIONS ENGINEER(S): C. Haskell SCIENTIST: A. Fludra CDS INSTRUMENT: BTM7 was toggling into high warning. Analysis indicates that it is due to the prolonged use of GIS. Due to the detectors running at high voltage for so long, the additional heat produced caused the small change in the rear bulkhead temperature. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================== DATE: 03-January-1998 DOY: 003 OPERATIONS ENGINEER(S): A. Hammond/E. Donaldson SCIENTIST: A. Fludra CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================== DATE: 04-January-1998 DOY: 004 OPERATIONS ENGINEER(S): A. Hammond/E. Donaldson SCIENTIST: W. Thompson CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================== DATE: 05-January-1998 DOY: 005 OPERATIONS ENGINEER(S): C. Haskell / R. Yurow SCIENTIST: D. Zarro CDS INSTRUMENT: A Setup Register A Failure error occured on the NIS. The NIS was reset at 21:47 UT. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================== DATE: 06-January-1998 DOY: 006 OPERATIONS ENGINEER(S): C. Haskell / R. Yurow SCIENTIST: D. Zarro CDS INSTRUMENT: A lubrication study was performed. CDS GROUND SYSTEM: Nominal. DAY PLAN: Lubrication Study, Science Operations. COMMENTS: ============================================================================== DATE: 07-January-1998 DOY: 007 OPERATIONS ENGINEER(S): C. Haskell / R. Yurow SCIENTIST: D. Zarro CDS INSTRUMENT: A parity error occured in the primary processor memory space. Since it occured in a safe location, no reboot is necessary. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================== DATE: 08-January-1998 DOY: 008 OPERATIONS ENGINEER(S): C. Haskell / R. Yurow SCIENTIST: D. Zarro CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================== DATE: 09-January-1998 DOY: 009 OPERATIONS ENGINEER(S): R. Yurow SCIENTIST: D. Zarro CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================== DATE: 10-January-1998 DOY: 010 OPERATIONS ENGINEER(S): E. Donaldson SCIENTIST: T. Kucera CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================== DATE: 11-January-1998 DOY: 011 OPERATIONS ENGINEER(S): E. Donaldson SCIENTIST: T. Kucera CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================== DATE: 12-January-1998 DOY: 012 OPERATIONS ENGINEER(S): R. Yurow SCIENTIST: T. Kucera CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================== DATE: 13-January-1998 DOY: 013 OPERATIONS ENGINEER(S): R. Yurow SCIENTIST: T. Kucera CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================== DATE: 14-January-1998 DOY: 014 OPERATIONS ENGINEER(S): R. Yurow SCIENTIST: T. Kucera CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================== DATE: 15-January-1998 DOY: 015 OPERATIONS ENGINEER(S): C. Haskell / R. Yurow SCIENTIST: T. Kucera CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================== DATE: 16-January-1998 DOY: 016 OPERATIONS ENGINEER(S): C. Haskell / R. Yurow SCIENTIST: T. Kucera CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================== DATE: 17-January-1998 DOY: 017 OPERATIONS ENGINEER(S): C. Haskell SCIENTIST: L. Hara-Murnion CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================== DATE: 18-January-1998 DOY: 018 OPERATIONS ENGINEER(S): C. Haskell SCIENTIST: L. Hara-Murnion CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================== DATE: 19-January-1998 DOY: 019 OPERATIONS ENGINEER(S): C. Haskell SCIENTIST: L. Hara-Murnion CDS INSTRUMENT: A secondary SEU and a NIS register A setup failure occurred late today. The reboot of the secondary and reset of the primary will be deferred until the lube and flat-fielding work is finished tomorrow. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. ============================================================================== DATE: 20-January-1998 DOY: 020 OPERATIONS ENGINEER(S): C. Haskell / R. Yurow SCIENTIST: L. Hara-Murnion CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================== DATE: 21-January-1998 DOY: 021 OPERATIONS ENGINEER(S): C. Haskell / R. Yurow SCIENTIST: L. Hara-Murnion CDS INSTRUMENT: One run each of the flat field studies FFCAL and FFCAL2 was performed at 11:45 UT and 12:31 UT respectively. The NIS was restarted and the secondary (science) processor was rebooted at 13:39 UT. CDS GROUND SYSTEM: Nominal. DAY PLAN: Engineering Work, Science Operations. COMMENTS: ============================================================================== DATE: 22-January-1998 DOY: 022 OPERATIONS ENGINEER(S): C. Haskell / R. Yurow SCIENTIST: L. Hara-Murnion CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: A software update was performed at 18:55 UT. DAY PLAN: Science Operations. COMMENTS: ============================================================================== DATE: 23-January-1998 DOY: 023 OPERATIONS ENGINEER(S): C. Haskell / R. Yurow SCIENTIST: L. Hara-Murnion CDS INSTRUMENT: A lubrication study was performed. CDS GROUND SYSTEM: Nominal. DAY PLAN: Lubrication Study, Science Operations. COMMENTS: ============================================================================== DATE: 24-January-1998 DOY: 024 OPERATIONS ENGINEER(S): E. Donaldson / A. Hammond SCIENTIST: E. Breeveld CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================== DATE: 25-January-1998 DOY: 025 OPERATIONS ENGINEER(S): E. Donaldson / A. Hammond SCIENTIST: E. Breeveld CDS INSTRUMENT: A Setup Register A Failure Error occured on the NIS. The NIS will be restarted when convenient. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================== DATE: 26-January-1998 DOY: 026 OPERATIONS ENGINEER(S): C. Haskell / R. Yurow SCIENTIST: E. Breeveld CDS INSTRUMENT: Realtime commanding operations ran from 20:15 UT to 00:00 UT DOY 27. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================== DATE: 27-January-1998 DOY: 027 OPERATIONS ENGINEER(S): C. Haskell / R. Yurow SCIENTIST: E. Breeveld CDS INSTRUMENT: Realtime commanding operations ran from 19:00 UT to 22:30 UT. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================== DATE: 28-January-1998 DOY: 028 OPERATIONS ENGINEER(S): C. Haskell / R. Yurow SCIENTIST: E. Breeveld CDS INSTRUMENT: Realtime commanding operations ran from 19:00 UT to 22:00 UT. The NIS was reset at 23:24 UT. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================== DATE: 29-January-1998 DOY: 029 OPERATIONS ENGINEER(S): C. Haskell / R. Yurow SCIENTIST: E. Breeveld CDS INSTRUMENT: GIS Engineering work was performed to determine why the linewidths are greater then expected. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================== DATE: 30-January-1998 DOY: 030 OPERATIONS ENGINEER(S): C. Haskell / R. Yurow SCIENTIST: E. Breeveld CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================== DATE: 31-January-1998 DOY: 031 OPERATIONS ENGINEER(S): C. Haskell/E. Donaldson/A. Hammond SCIENTIST: W. Thompson CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================== From the CDS Operations Management Team in the Space Science & Technology Department at CCLRC Rutherford Appleton Laboratory Site maintained by John Rainnie. Last revised on Tuesday (17/Jul/2001) at 09:05. |