Scientific Operations
 Front Page
 Scientific Ops
  » Plans
  » Pointings
  » Report
  » Requests
  » Log
  » Notes
  » Tech Info
 Engineering
 Software
 Results
 Gallery
 Atlas
 Press
 Links
 Project
 Newsletter
 Copyright
July 2002
 
=============================================================================
DATE:1-July-2002
DOY: 182
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: J. Ireland
CDS INSTRUMENT: 
  A parity error was detected in the Primary processor memory space at
address #8006a4e3. This is in an unused area.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:2-July-2002
DOY: 183
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: J. Ireland
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:3-July-2002
DOY: 184
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: J. Ireland
CDS INSTRUMENT: 
  A parity error was detected in the Primary processor memory space at
address #8007afe3. This is in Sequence Table 47 (Emergency Study) - Safe.
  A parity error was detected in the Primary processor memory space at
address #8003bfe3. This is in the Compression Module - Safe.
  A parity error was detected in the Primary processor memory space at
address #80069fe7. This is in an Unused memory location.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:4-July-2002
DOY: 185
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: J. Ireland
CDS INSTRUMENT: 
  A Checksum Sequence error occured when sequence table ID #80b9 (Table 31)
was executed.  This table was used by the GIMCP_1B study to be run at 6:10 UT
on July 3.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:5-July-2002
DOY: 186
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: J. Ireland
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:6-July-2002
DOY: 187
OPERATIONS ENGINEER(S): B. Donaldson
SCIENTIST: J. Ireland
CDS INSTRUMENT: 
  A Secondary error was detected at address #80067a2b.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:7-July-2002
DOY: 188
OPERATIONS ENGINEER(S): R. Yurow
SCIENTIST: J. Ireland
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:8-July-2002
DOY: 189
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: P. Gallagher
CDS INSTRUMENT: 
  An NIS Setup Register A system error was detected.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:9-July-2002
DOY: 190
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: P. Gallagher
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:10-July-2002
DOY: 191
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: P. Gallagher
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:11-July-2002
DOY: 192
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: P. Gallagher
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:12-July-2002
DOY: 193
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: P. Gallagher
CDS INSTRUMENT: 
  A Primary Reboot was completed at 17:42 UT.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Primary Reboot, Science Operations.
COMMENTS: 
=============================================================================
DATE:13-July-2002
DOY: 194
OPERATIONS ENGINEER(S): B. Donaldson
SCIENTIST: P. Gallagher
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:14-July-2002
DOY: 195
OPERATIONS ENGINEER(S): R. Yurow
SCIENTIST: P. Gallagher
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:15-July-2002
DOY: 196
OPERATIONS ENGINEER(S): R. Yurow
SCIENTIST: A. Fludra
CDS INSTRUMENT: 
  A Setup Register A Failure system error was detected on the NIS.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: X3 Flare observed at ~20:00 UT.
=============================================================================
DATE:16-July-2002
DOY: 197
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: A. Fludra
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:17-July-2002
DOY: 198
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: A. Fludra
CDS INSTRUMENT: 
  CUV-CLK vilated its Yellow Low Limit for 30 sec at ~9:10 UT.  This was due
to an energetic partical from a proton storm causing an SEU on the VDS/NIS
Electronics.  FLARE_AR was running. CDS Nominal.
CDS GROUND SYSTEM: 
  The following studies were imported to the EOF:
db_12ex_1.def	(262/1)
db_364ex_1.def	(263/1)
db_366ex_1.def	(264/1)
db_4ex_2.def	(237/2)
db_one_8.def	( 15/7)
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:18-July-2002
DOY: 199
OPERATIONS ENGINEER(S): C. Maroney
SCIENTIST: A. Fludra
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:19-July-2002
DOY: 200
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: A. Fludra
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:20-July-2002
DOY: 201
OPERATIONS ENGINEER(S): B. Donaldson
SCIENTIST: A. Fludra
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:21-July-2002
DOY: 202
OPERATIONS ENGINEER(S): B. Donaldson
SCIENTIST: A. Fludra
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:22-July-2002
DOY: 203
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: B. Thompson
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:23-July-2002
DOY: 204
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: B. Thompson
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:24-July-2002
DOY: 205
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: B. Thompson
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:25-July-2002
DOY: 206
OPERATIONS ENGINEER(S): R. Yurow
SCIENTIST: B. Thompson
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:26-July-2002
DOY: 207
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: B. Thompson
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: 
  The following study was imported to the EOF:
	db_20ex_5.def
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:27-July-2002
DOY: 208
OPERATIONS ENGINEER(S): B. Donaldson
SCIENTIST: B. Thompson
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:28-July-2002
DOY: 209
OPERATIONS ENGINEER(S): R. Yurow
SCIENTIST: B. Thompson
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:29-July-2002
DOY: 210
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: T. Kucera
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:30-July-2002
DOY: 211
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: T. Kucera
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:31-July-2002
DOY: 212
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: T. Kucera
CDS INSTRUMENT: 
  A Mechanism Lubrication was completed at 17:45 UT.
  A VDS Reset was completed at 18:15 UT.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================




From the CDS Operations Management Team in the Space Science & Technology Department at CCLRC Rutherford Appleton Laboratory
Site maintained by John Rainnie.
Last revised on Tuesday (17/Jul/2001) at 09:04.