DATE:1-July-2003
DOY: 182
OPERATIONS ENGINEER(S): R. Yurow
SCIENTIST: 
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Doors Closed / Low Rate.
COMMENTS: 
=============================================================================
DATE:2-July-2003
DOY: 183
OPERATIONS ENGINEER(S): R. Yurow
SCIENTIST: 
CDS INSTRUMENT: 
  CDS Doors were opened at 13:59 UT.
  The ESR Flag was enabled for CDS at 14:55 UT.
  A mechanism movement test was completed successfully at 15:36 UT.
  Science plan will resume at 00:35 UT on DOY 184.  While SOHO is limited to
medium rate telemetry, science plan will only cover periods when we have
down-link.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Doors Closed / Low Rate.
COMMENTS: 
=============================================================================
DATE:3-July-2003
DOY: 184
OPERATIONS ENGINEER(S): R. Yurow
SCIENTIST: P. Young (RAL)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Limited Science Operations.
COMMENTS: 
=============================================================================
DATE:4-July-2003
DOY: 185
OPERATIONS ENGINEER(S): R. Yurow
SCIENTIST: P. Young (RAL)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Limited Science Operations.
COMMENTS: 
=============================================================================
DATE:5-July-2003
DOY: 186
OPERATIONS ENGINEER(S): R. Yurow
SCIENTIST: C. Foley
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Limited Science Operations.
COMMENTS: 
=============================================================================
DATE:6-July-2003
DOY: 187
OPERATIONS ENGINEER(S): R. Yurow
SCIENTIST: C. Foley
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Limited Science Operations.
COMMENTS: 
=============================================================================
DATE:7-July-2003
DOY: 188
OPERATIONS ENGINEER(S): R. Yurow
SCIENTIST: P. Young (RAL) 
CDS INSTRUMENT: 
  CDS Doors were shut at 12:58 UT in preparation for S/C Maneuvers.
  The ESR Flag was disabled at 13:20 UT.
CDS GROUND SYSTEM: 
  The duration of the following study was changed:
    BLINK_ST    (RID/71  Var/29)  147s - 160s.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:8-July-2003
DOY: 189
OPERATIONS ENGINEER(S): R. Yurow
SCIENTIST: 
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Doors Closed.
COMMENTS: 
=============================================================================
DATE:9-July-2003
DOY: 190
OPERATIONS ENGINEER(S): R. Yurow
SCIENTIST: 
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Doors Closed.
COMMENTS: 
=============================================================================
DATE:10-July-2003
DOY: 191
OPERATIONS ENGINEER(S): R. Yurow
SCIENTIST: P. Young (RAL)
CDS INSTRUMENT: 
  CDS Doors were opened at 14:37 UT.  
  The Science plan will resume at 15:00 UT.
  The ESR Flag to CDS was enabled shortly after CDS doors were opened.
CDS GROUND SYSTEM: 
  A Software Updated was completed at 19:48 UT.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:11-July-2003
DOY: 192
OPERATIONS ENGINEER(S): R. Yurow
SCIENTIST: P. Young (RAL)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:12-July-2003
DOY: 193
OPERATIONS ENGINEER(S): J. Seidel
SCIENTIST: P. Young (RAL)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:13-July-2003
DOY: 194
OPERATIONS ENGINEER(S): C. King
SCIENTIST: P. Young (RAL)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:14-July-2003
DOY: 195
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: I. Ugarte
CDS INSTRUMENT: 
  SOHO had a warm startup at 15:45 UT. 
  SOHO returned to medium rate at 18:43 UT.
  The science plan was halted at 21:21 UT so that submode transitions (plus
patching) can take place to return to submode 6. A transition to submode 5
was made at 21:32 UT.  A transition to submode 6 was made at 21:43 UT.  CDS
is nominal after submode transitions.
  Due to lack of time before the plan was to start (00:00 UT), the plan
load at 23:24 UT had to be aborted at 23:58 UT.
  SYNOP was deleted from the plan.  The new science plan will resume 
at 03:20 UT.
CDS GROUND SYSTEM: 
  The IWS command rate was reset to 1/10s for commanding on DSN-27.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:15-July-2003
DOY: 196
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: I. Ugarte
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:16-July-2003
DOY: 197
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: I. Ugarte
CDS INSTRUMENT: 
  At 19:46 UT, the spacecraft OBT was corrected by 1.25 sec deviation.
The OBT was not sent to CDS.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:17-July-2003
DOY: 198
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: I. Ugarte
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:18-July-2003
DOY: 199
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: I. Ugarte
CDS INSTRUMENT: 
  The DCS was cleared manually to upload a modified science plan at 12:30 UT.
  AT 12:31 UT, The CDS OBT was updated via RCR command.
CDS GROUND SYSTEM: 
  Due to scheduled NRT for CDS being late, there was not enough time to load
the prepared science plan.  The plan was modified to start JOP 166 at
13:30 UT.  Science plan upload was successful.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:19-July-2003
DOY: 200
OPERATIONS ENGINEER(S): J. Seidel
SCIENTIST: I. Ugarte
CDS INSTRUMENT: 
  A parity error was detected on the Secondary (Science) processor at
address location #8006e033.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:20-July-2003
DOY: 201
OPERATIONS ENGINEER(S): R. Yurow / C. King
SCIENTIST: I. Ugarte
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:21-July-2003
DOY: 202
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: W. Thompson
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: 
  The following raster durations were modified:
    BP_W_2     RID/216    VAR/2    940s - 960s
    BP_W_3     RID/217    VAR/2    895s - 910s
    G2AL_V3    RID/232    VAR/1    307s - 310s
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:22-July-2003
DOY: 203
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: W. Thompson
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: 
  At 17:25 UT, while loading the science plan, FOT DISABLED the NRT when a 
PAUSE was expected.  Three dump commands were lost.  The science plan was
verified.  CDS Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:23-July-2003
DOY: 204
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: W. Thompson
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:24-July-2003
DOY: 205
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: W. Thompson
CDS INSTRUMENT: 
  At 21:27 UT, CTM 16 violated Yellow Low limits with a value of -6.5 DegC.
Cause is thought to be the North Polar Plume Study.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:25-July-2003
DOY: 206
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: W. Thompson
CDS INSTRUMENT: 
  A Mechanism Lubrication was completed at 16:35 UT.
CDS GROUND SYSTEM: 
  The IWS command rate was changed to 1/3 sec. for commanding on a good
station.
DAY PLAN: Mechanism Lubrication, Science Operations.
COMMENTS: 
=============================================================================
DATE:26-July-2003
DOY: 207
OPERATIONS ENGINEER(S): J. Siedel
SCIENTIST: W. Thompson
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:27-July-2003
DOY: 208
OPERATIONS ENGINEER(S): C. King
SCIENTIST: W. Thompson
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:28-July-2003
DOY: 209
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: J. Ireland
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: 
  The IWS command rate was changed to 1/10 sec. for commanding on DSN-27.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:29-July-2003
DOY: 210
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: J. Ireland
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:30-July-2003
DOY: 211
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: J. Ireland
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:31-July-2003
DOY: 212
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: J. Ireland
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: 
  GSET 76 has been imported into the database.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================


From the CDS Operations Management Team in the Space Science & Technology Department at CCLRC Rutherford Appleton Laboratory