July 2005
 
=============================================================================
DATE: 1-July-2005
DOY: 182
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: J. Rainnie (RAL)
CDS INSTRUMENT: 
  A Setup VDS Register A Failure was detected.
CDS GROUND SYSTEM: 
  The following studies were imported to the EOF:
    strongli_112.def
    ardiag_2_113.def
    ardiag_n_23.def
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE: 2-July-2005
DOY: 183
OPERATIONS ENGINEER(S): R. Yurow
SCIENTIST: J. Rainnie (RAL)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE: 3-July-2005
DOY: 184
OPERATIONS ENGINEER(S): R. Yurow
SCIENTIST: J. Rainnie (RAL)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE: 4-July-2005
DOY: 185
OPERATIONS ENGINEER(S): R. Yurow
SCIENTIST: C. Nestlerode (GSFC)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: US Holiday - Independence Day!
=============================================================================
DATE: 5-July-2005
DOY: 186
OPERATIONS ENGINEER(S): C. Maroney
SCIENTIST: C. Nestlerode (GSFC)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
=============================================================================
DATE: 6-July-2005
DOY: 187
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: C. Nestlerode (GSFC)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: 
  PDU-15 experienced a power failure and immediately crossed-over to
commercial power.  Operations were not affected - Nominal.
  A telemetry submode change (to submode 5) was initiated by CDS at 13 UT.
CDS Nominal after submode change.
DAY PLAN: Science Operations.
COMMENTS:
=============================================================================
DATE: 7-July-2005
DOY: 188
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: C. Nestlerode (GSFC)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations, VAULT Launch support (16 UT).
COMMENTS:
=============================================================================
DATE: 8-July-2005
DOY: 189
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: C. Nestlerode (GSFC)
CDS INSTRUMENT: 
  An on-board Mechanism Lubrication was completed at 14:30 UT.
CDS GROUND SYSTEM: 
  A telemetry submode change (to submode 6) was completed at 15:05 UT.
CDS Nominal after submode change.
DAY PLAN: Science Operations.
COMMENTS:
=============================================================================
DATE: 9-July-2005
DOY: 190
OPERATIONS ENGINEER(S): R. Yurow
SCIENTIST: C. Nestlerode (GSFC)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
=============================================================================
DATE: 10-July-2005
DOY: 191
OPERATIONS ENGINEER(S): R. Yurow
SCIENTIST: C. Nestlerode (GSFC)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
=============================================================================
DATE: 11-July-2005
DOY: 192
OPERATIONS ENGINEER(S): R. Yurow
SCIENTIST: C. Nestlerode (GSFC)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: 
  The following raster durations were changed:
    STRONGLI    (RasID/11    Var/121)  3331s - 3565s
    ARDIAG_2    (RasID/11    Var/122)  4996s - 5100s
    ARDIAG_N    (RasID/34    Var/25 )  2463s - 2550s
    EWGSCAN2    (RasID/128   Var/2  )  416s  - 430s
    GISAT       (RasID/132   Var/2  )  3369s - 3380s
DAY PLAN: Science Operations.
COMMENTS:
=============================================================================
DATE: 12-July-2005
DOY: 193
OPERATIONS ENGINEER(S): C. Maroney
SCIENTIST: C. Nestlerode (GSFC)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: 
  The following studies were import to the EOF:
    trace_fe_13.def
    os_ar3_3.def
DAY PLAN: Science Operations.
COMMENTS:
=============================================================================
DATE: 13-July-2005
DOY: 194
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: C. Nestlerode (GSFC)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
=============================================================================
DATE: 14-July-2005
DOY: 195
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: C. Nestlerode (GSFC)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
=============================================================================
DATE: 15-July-2005
DOY: 196
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: C. Nestlerode (GSFC)
CDS INSTRUMENT: 
  Flat-Field Calibrations were completed at 17:11 UT.
  A Secondary memory error was detected at address #8006206f.
  At 21:14 UT, the science plan was aborted due to multiple yellow high 
limit violations by AIVMCP, the MCP HV current monitor.  Subsequently, the
NIS HV input was disabled in order to safe the instrument.  The cause is
under investigation.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
=============================================================================
DATE: 16-July-2005
DOY: 197
OPERATIONS ENGINEER(S): R. Yurow
SCIENTIST: C. Nestlerode (GSFC)
CDS INSTRUMENT: 
  NIS HV disabled while events of DOY 196 are investigated.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: No Science Operations.
COMMENTS:
=============================================================================
DATE: 17-July-2005
DOY: 198
OPERATIONS ENGINEER(S): R. Yurow
SCIENTIST: C. Nestlerode (GSFC)
CDS INSTRUMENT: 
  NIS HV disabled while events of DOY 196 are investigated.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: No Science Operations.
COMMENTS:
=============================================================================
DATE: 18-July-2005
DOY: 199
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: L. Green (RAL)
CDS INSTRUMENT: 
  NIS HV disabled while events of DOY 196 are investigated.
CDS GROUND SYSTEM: 
  The following raster duration change was made:
    TRACE_FE    rid/140    var/13    3048s - 3077s.
DAY PLAN: No Science Operations.
COMMENTS:
=============================================================================
DATE: 19-July-2005
DOY: 200
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: L. Green (RAL)
CDS INSTRUMENT: 
  The NIS was reset at 19:29 UT with no change in its status flags (except
to clear the error).
  A CDS reboot was then performed starting at 19:36 UT.  During the mode 
transition from STANDBY mode to READY_BOTH, the NIS HV input was enabled.
HV current draw was initially erratic, but then settled down to nominal
levels.  Reboot procedures were completed at 20:57 UT.
  NIS HV input remained enabled until 04:05 UT on DOY 201.  At this point
the HV input was disabled and a GIS-Only plan was loaded.  This GIS-Only
plan will start at 05:00 UT DOY 201.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: No Science Operations.
COMMENTS:
=============================================================================
DATE: 20-July-2005
DOY: 201
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: L. Green (RAL)
CDS INSTRUMENT: 
  NIS HV input was enabled at 23:49 UT to continue NIS HV tests.  HV current
draw remained stable during test.  NIS HV input was disabled at 04:03 UT
DOY 202.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: (GIS-Only) Science Operations.
COMMENTS:
=============================================================================
DATE: 21-July-2005
DOY: 202
OPERATIONS ENGINEER(S): C. Maroney
SCIENTIST: L. Green (RAL)
CDS INSTRUMENT: 
  NIS HV input was enabled at 16:37 UT to continue NIS HV tests.  HV current
draw remained stable during test.  NIS HV input was disabled at 19:49 UT.  A
GIS-only plan was loaded and will continue at 00:00 UT DOY 203.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: (GIS) Science Operations.
COMMENTS:
=============================================================================
DATE: 22-July-2005
DOY: 203
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: L. Green (RAL)
CDS INSTRUMENT: 
  NIS HV input was enabled at 20:02 UT to continue NIS HV tests.  HV current
stablized at 1.33 mA and dropped to 1.25 mA by the end of the test.  NIS HV 
input was disabled at 3:45 UT.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: (GIS) Science Operations.
COMMENTS:
=============================================================================
DATE: 23-July-2005
DOY: 204
OPERATIONS ENGINEER(S): R. Yurow
SCIENTIST: L. Green (RAL)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: (GIS) Science Operations.
COMMENTS:
=============================================================================
DATE: 24-July-2005
DOY: 205
OPERATIONS ENGINEER(S): R. Yurow
SCIENTIST: L. Green (RAL)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: (GIS) Science Operations.
COMMENTS:
=============================================================================
DATE: 25-July-2005
DOY: 206
OPERATIONS ENGINEER(S): R. Yurow
SCIENTIST: J. Noglik (RAL)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: (GIS) Science Operations.
COMMENTS:
=============================================================================
DATE: 26-July-2005
DOY: 207
OPERATIONS ENGINEER(S): R. Yurow
SCIENTIST: J. Noglik (RAL)
CDS INSTRUMENT: 
  NIS HV input was enabled at 17:04 UT to start long duration soak test.
Current immediately stablized at 1.33 mA.
  The raster durations of the following studies were changed at the EOF:
    GIWEMT5 (RasID: 72/Var:3)   641s -  650s.
    GIWEMT5 (RasID:241/Var:1)  1008s - 1030s.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: (GIS) Science Operations.
COMMENTS:
=============================================================================
DATE: 27-July-2005
DOY: 208
OPERATIONS ENGINEER(S): R. Yurow
SCIENTIST: J. Noglik (RAL)
CDS INSTRUMENT: 
  The first study to be run on DOY 209 had to be deleted from the plan due
to errors running XCPT.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: (GIS) Science Operations.
COMMENTS:
=============================================================================
DATE: 28-July-2005
DOY: 209
OPERATIONS ENGINEER(S): R. Yurow
SCIENTIST: J. Noglik (RAL)
CDS INSTRUMENT: 
  The NIS HV input to the MCP was disabled at 17:05 UT to end MCP soak test.
MCP current draw was 1.20 mA at end of test.
  The following studies were imported to the EOF:
    ar_movie_1.def (study_ID:309/Var:1)
CDS GROUND SYSTEM: Nominal.
DAY PLAN: (GIS) Science Operations.
COMMENTS:
=============================================================================
DATE: 29-July-2005
DOY: 210
OPERATIONS ENGINEER(S): R. Yurow
SCIENTIST: J. Noglik (RAL)
CDS INSTRUMENT: 
  A Mechanism Lubrication was completed at 19:06 UT.
  A Macro Sequence ID error was detected.  Error is currently under 
investigation.
  The plan for DOY 211/212 was modified.  Studies OLOOP11 at 13:30 UT DOY 211
and study OLOOP11 at 13:30 UT DOY 212 were modified from time tag studies to
non-time-tagged studies.  This was done to save space in the DCS and allow 2
days worth of plan to be loaded.  The new start time for these studies is
expected to be 12:18 UT.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: (GIS) Science Operations.
COMMENTS:
=============================================================================
DATE: 30-July-2005
DOY: 211
OPERATIONS ENGINEER(S): R. Yurow
SCIENTIST: J. Noglik (RAL)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: (GIS) Science Operations.
COMMENTS:
=============================================================================
DATE: 31-July-2005
DOY: 212
OPERATIONS ENGINEER(S): R. Yurow
SCIENTIST: J. Noglik (RAL)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: (GIS) Science Operations.
COMMENTS:
=============================================================================