Scientific Operations | ||
|
June 2000============================================================================= DATE:1-June-2000 DOY: 153 OPERATIONS ENGINEER(S): R. Yurow / C. Maroney SCIENTIST: D. Zarro CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: The raster duration for study COSPEV r15/v9 was changed from 70 sec to 384 sec, because the first raster takes 384.7 sec, but the second and subsequent rasters take about 383.4 +/- .02 sec. DAY PLAN: Science Observations. COMMENTS: ============================================================================= DATE:2-June-2000 DOY: 154 OPERATIONS ENGINEER(S): R. Yurow / C. Maroney SCIENTIST: D. Zarro CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Observations. COMMENTS: ============================================================================= DATE:3-June-2000 DOY: 155 OPERATIONS ENGINEER(S): W. Hammond SCIENTIST: D. Zarro CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Observations. COMMENTS: ============================================================================= DATE:4-June-2000 DOY: 156 OPERATIONS ENGINEER(S): W. Hammond SCIENTIST: D. Zarro CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Observations. COMMENTS: ============================================================================= DATE:5-June-2000 DOY: 157 OPERATIONS ENGINEER(S): R. Yurow SCIENTIST: B. Thompson CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Observations. COMMENTS: ============================================================================= DATE:6-June-2000 DOY: 158 OPERATIONS ENGINEER(S): R. Yurow / C. Maroney SCIENTIST: B. Thompson CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Observations. COMMENTS: ============================================================================= DATE:7-June-2000 DOY: 159 OPERATIONS ENGINEER(S): R. Yurow / C. Maroney SCIENTIST: B. Thompson CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Observations. COMMENTS: ============================================================================= DATE:8-June-2000 DOY: 160 OPERATIONS ENGINEER(S): R. Yurow / C. Maroney SCIENTIST: B. Thompson CDS INSTRUMENT: A Full Field Calibration study was completed at 16:50 UT. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Observations. COMMENTS: ============================================================================= DATE:9-June-2000 DOY: 161 OPERATIONS ENGINEER(S): R. Yurow / C. Maroney SCIENTIST: B. Thompson CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: The following studies were imported: fl_ar2_19.def fl_on2_2.def o_spot5_1.def DAY PLAN: Science Observations. COMMENTS: ============================================================================= DATE:10-June-2000 DOY: 162 OPERATIONS ENGINEER(S): C. Maroney / W. Hammond SCIENTIST: B. Thompson CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Observations. COMMENTS: ============================================================================= DATE:11-June-2000 DOY: 163 OPERATIONS ENGINEER(S): W. Hammond SCIENTIST: B. Thompson CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Observations. COMMENTS: ============================================================================= DATE:12-June-2000 DOY: 164 OPERATIONS ENGINEER(S): R. Yurow / C. Maroney SCIENTIST: B. Bentley CDS INSTRUMENT: CDS aborted the currently running science plan at 19:27 UT to prepare for the submode switch. CDS GROUND SYSTEM: Telemetry submode was changed from submode 6 to submode 5 at 19:31 UT. DAY PLAN: Science Observations. COMMENTS: ============================================================================= DATE:13-June-2000 DOY: 165 OPERATIONS ENGINEER(S): R. Yurow / C. Maroney SCIENTIST: B. Bentley CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Observations. COMMENTS: ============================================================================= DATE:14-June-2000 DOY: 166 OPERATIONS ENGINEER(S): R. Yurow / C. Maroney SCIENTIST: B. Bentley CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Observations. COMMENTS: ============================================================================= DATE:15-June-2000 DOY: 167 OPERATIONS ENGINEER(S): R. Yurow / C. Maroney SCIENTIST: B. Bentley CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Observations. COMMENTS: ============================================================================= DATE:16-June-2000 DOY: 168 OPERATIONS ENGINEER(S): R. Yurow / C. Maroney SCIENTIST: B. Bentley CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Observations. COMMENTS: ============================================================================= DATE:17-June-2000 DOY: 169 OPERATIONS ENGINEER(S): C. Maroney / W. Hammond SCIENTIST: B. Bentley CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Observations. COMMENTS: ============================================================================= DATE:18-June-2000 DOY: 170 OPERATIONS ENGINEER(S): W. Hammond SCIENTIST: B. Bentley CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Observations. COMMENTS: ============================================================================= DATE:19-June-2000 DOY: 171 OPERATIONS ENGINEER(S): R. Yurow / C. Maroney SCIENTIST: R. Harrison CDS INSTRUMENT: The science plan was aborted at 15:32 UT so that a submode switch could be executed. The NIS was reset at 15:45 UT to clear the error status word. A mechanism lubrication was completed at 18:01 UT. CDS GROUND SYSTEM: A telemetry submode switch occurred at 15:37 UT. CDS is nominal after the submode switch. DAY PLAN: Science Observations. COMMENTS: ============================================================================= DATE:20-June-2000 DOY: 172 OPERATIONS ENGINEER(S): R. Yurow / C. Maroney SCIENTIST: R. Harrison CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Observations. COMMENTS: ============================================================================= DATE:21-June-2000 DOY: 173 OPERATIONS ENGINEER(S): R. Yurow / C. Maroney SCIENTIST: R. Harrison CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: The following study durations were changed: EJECT_RH 190/1 99 s --> 110 s AR_MON 11/57 3460 s --> 3470 s FL_ARZ 13/23 198 s --> 205 s DAY PLAN: Science Observations. COMMENTS: ============================================================================= DATE:22-June-2000 DOY: 174 OPERATIONS ENGINEER(S): R. Yurow / C. Maroney SCIENTIST: R. Harrison CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Observations. COMMENTS: ============================================================================= DATE:23-June-2000 DOY: 175 OPERATIONS ENGINEER(S): R. Yurow / C. Maroney SCIENTIST: R. Harrison CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Observations. COMMENTS: ============================================================================= DATE:24-June-2000 DOY: 176 OPERATIONS ENGINEER(S): E. Donaldson / W. Hammond SCIENTIST: R. Harrison CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Observations. COMMENTS: ============================================================================= DATE:25-June-2000 DOY: 177 OPERATIONS ENGINEER(S): E. Donaldson / W. Hammond SCIENTIST: R. Harrison CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Observations. COMMENTS: ============================================================================= DATE:26-June-2000 DOY: 178 OPERATIONS ENGINEER(S): R. Yurow / C. Maroney SCIENTIST: W. Thompson CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Observations. COMMENTS: ============================================================================= DATE:27-June-2000 DOY: 179 OPERATIONS ENGINEER(S): R. Yurow / C. Maroney SCIENTIST: W. Thompson CDS INSTRUMENT: The study ATR040W, which started 7:17 UT, ran longer then expected and was aborted by a QCM monitoring study at 7:45 UT. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Observations. COMMENTS: ============================================================================= DATE:28-June-2000 DOY: 180 OPERATIONS ENGINEER(S): R. Yurow / C. Maroney SCIENTIST: R. Harrison CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: The following study duration change was made: ATR040W 71/26 225 s --> 409 s DAY PLAN: Science Observations. COMMENTS: ============================================================================= DATE:29-June-2000 DOY: 181 OPERATIONS ENGINEER(S): R. Yurow SCIENTIST: W. Thompson CDS INSTRUMENT: There was a gap in science operations from 16:21 UT to 20:14 UT due to the operator forgetting to load the science plan for the afternoon. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Observations. COMMENTS: ============================================================================= DATE:30-June-2000 DOY: 182 OPERATIONS ENGINEER(S): R. Yurow / C. Maroney SCIENTIST: W. Thompson CDS INSTRUMENT: The science plan was aborted at 15:22 UT to prepare for a telemetry submode switch. A telemetry submode switch occured at 15:31 UT from submode 5 to submode 6. A NIS Setup Register A Failure system errror was detected. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Observations. COMMENTS: ============================================================================= From the CDS Operations Management Team in the Space Science & Technology Department at CCLRC Rutherford Appleton Laboratory Site maintained by John Rainnie. Last revised on Tuesday (17/Jul/2001) at 09:03. |