June 2000
 
=============================================================================
DATE:1-June-2000
DOY: 153
OPERATIONS ENGINEER(S):  R. Yurow / C. Maroney
SCIENTIST: D. Zarro
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: 
  The raster duration for study COSPEV r15/v9 was changed from 70 sec to 
384 sec, because the first raster takes 384.7 sec, but the second and
subsequent rasters take about 383.4 +/- .02 sec.
DAY PLAN: Science Observations.
COMMENTS: 
=============================================================================
DATE:2-June-2000
DOY: 154
OPERATIONS ENGINEER(S):  R. Yurow / C. Maroney
SCIENTIST: D. Zarro
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Observations.
COMMENTS: 
=============================================================================
DATE:3-June-2000
DOY: 155
OPERATIONS ENGINEER(S):  W. Hammond
SCIENTIST: D. Zarro
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Observations.
COMMENTS: 
=============================================================================
DATE:4-June-2000
DOY: 156
OPERATIONS ENGINEER(S):  W. Hammond
SCIENTIST: D. Zarro
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Observations.
COMMENTS: 
=============================================================================
DATE:5-June-2000
DOY: 157
OPERATIONS ENGINEER(S):  R. Yurow
SCIENTIST: B. Thompson
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Observations.
COMMENTS: 
=============================================================================
DATE:6-June-2000
DOY: 158
OPERATIONS ENGINEER(S):  R. Yurow / C. Maroney
SCIENTIST: B. Thompson
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Observations.
COMMENTS: 
=============================================================================
DATE:7-June-2000
DOY: 159
OPERATIONS ENGINEER(S):  R. Yurow / C. Maroney
SCIENTIST: B. Thompson
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Observations.
COMMENTS: 
=============================================================================
DATE:8-June-2000
DOY: 160
OPERATIONS ENGINEER(S):  R. Yurow / C. Maroney
SCIENTIST: B. Thompson
CDS INSTRUMENT: 
  A Full Field Calibration study was completed at 16:50 UT.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Observations.
COMMENTS: 
=============================================================================
DATE:9-June-2000
DOY: 161
OPERATIONS ENGINEER(S):  R. Yurow / C. Maroney
SCIENTIST: B. Thompson
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: 
  The following studies were imported:
fl_ar2_19.def
fl_on2_2.def
o_spot5_1.def
DAY PLAN: Science Observations.
COMMENTS: 
=============================================================================
DATE:10-June-2000
DOY: 162
OPERATIONS ENGINEER(S):  C. Maroney / W. Hammond
SCIENTIST: B. Thompson
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Observations.
COMMENTS: 
=============================================================================
DATE:11-June-2000
DOY: 163
OPERATIONS ENGINEER(S):  W. Hammond
SCIENTIST: B. Thompson
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Observations.
COMMENTS: 
=============================================================================
DATE:12-June-2000
DOY: 164
OPERATIONS ENGINEER(S):  R. Yurow / C. Maroney
SCIENTIST: B. Bentley
CDS INSTRUMENT: 
  CDS aborted the currently running science plan at 19:27 UT to prepare for 
the submode switch.
CDS GROUND SYSTEM: 
  Telemetry submode was changed from submode 6 to submode 5 at 19:31 UT.
DAY PLAN: Science Observations.
COMMENTS: 
=============================================================================
DATE:13-June-2000
DOY: 165
OPERATIONS ENGINEER(S):  R. Yurow / C. Maroney
SCIENTIST: B. Bentley
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Observations.
COMMENTS: 
=============================================================================
DATE:14-June-2000
DOY: 166
OPERATIONS ENGINEER(S):  R. Yurow / C. Maroney
SCIENTIST: B. Bentley
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Observations.
COMMENTS: 
=============================================================================
DATE:15-June-2000
DOY: 167
OPERATIONS ENGINEER(S):  R. Yurow / C. Maroney
SCIENTIST: B. Bentley
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Observations.
COMMENTS: 
=============================================================================
DATE:16-June-2000
DOY: 168
OPERATIONS ENGINEER(S):  R. Yurow / C. Maroney
SCIENTIST: B. Bentley
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Observations.
COMMENTS: 
=============================================================================
DATE:17-June-2000
DOY: 169
OPERATIONS ENGINEER(S):  C. Maroney / W. Hammond
SCIENTIST: B. Bentley
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Observations.
COMMENTS: 
=============================================================================
DATE:18-June-2000
DOY: 170
OPERATIONS ENGINEER(S):  W. Hammond
SCIENTIST: B. Bentley
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Observations.
COMMENTS: 
=============================================================================
DATE:19-June-2000
DOY: 171
OPERATIONS ENGINEER(S):  R. Yurow / C. Maroney
SCIENTIST: R. Harrison
CDS INSTRUMENT: 
  The science plan was aborted at 15:32 UT so that a submode switch could be
executed.
  The NIS was reset at 15:45 UT to clear the error status word.
  A mechanism lubrication was completed at 18:01 UT.
CDS GROUND SYSTEM: 
  A telemetry submode switch occurred at 15:37 UT. CDS is nominal after the
submode switch.
DAY PLAN: Science Observations.
COMMENTS: 
=============================================================================
DATE:20-June-2000
DOY: 172
OPERATIONS ENGINEER(S):  R. Yurow / C. Maroney
SCIENTIST: R. Harrison
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Observations.
COMMENTS: 
=============================================================================
DATE:21-June-2000
DOY: 173
OPERATIONS ENGINEER(S):  R. Yurow / C. Maroney
SCIENTIST: R. Harrison
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: 
The following study durations were changed:
EJECT_RH    190/1   99 s --> 110 s
AR_MON      11/57   3460 s --> 3470 s
FL_ARZ      13/23   198 s --> 205 s
DAY PLAN: Science Observations.
COMMENTS: 
=============================================================================
DATE:22-June-2000
DOY: 174
OPERATIONS ENGINEER(S):  R. Yurow / C. Maroney
SCIENTIST: R. Harrison
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Observations.
COMMENTS: 
=============================================================================
DATE:23-June-2000
DOY: 175
OPERATIONS ENGINEER(S):  R. Yurow / C. Maroney
SCIENTIST: R. Harrison
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Observations.
COMMENTS: 
=============================================================================
DATE:24-June-2000
DOY: 176
OPERATIONS ENGINEER(S):  E. Donaldson / W. Hammond
SCIENTIST: R. Harrison
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Observations.
COMMENTS: 
=============================================================================
DATE:25-June-2000
DOY: 177
OPERATIONS ENGINEER(S):  E. Donaldson / W. Hammond
SCIENTIST: R. Harrison
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Observations.
COMMENTS: 
=============================================================================
DATE:26-June-2000
DOY: 178
OPERATIONS ENGINEER(S):  R. Yurow / C. Maroney
SCIENTIST: W. Thompson
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Observations.
COMMENTS: 
=============================================================================
DATE:27-June-2000
DOY: 179
OPERATIONS ENGINEER(S):  R. Yurow / C. Maroney
SCIENTIST: W. Thompson
CDS INSTRUMENT: 
  The study ATR040W, which started  7:17 UT, ran longer then expected and
  was aborted by a QCM monitoring study at 7:45 UT.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Observations.
COMMENTS: 
=============================================================================
DATE:28-June-2000
DOY: 180
OPERATIONS ENGINEER(S):  R. Yurow / C. Maroney
SCIENTIST: R. Harrison
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: 
  The following study duration change was made:
  ATR040W  71/26   225 s --> 409 s
DAY PLAN: Science Observations.
COMMENTS: 
=============================================================================
DATE:29-June-2000
DOY: 181
OPERATIONS ENGINEER(S):  R. Yurow
SCIENTIST: W. Thompson
CDS INSTRUMENT: 
  There was a gap in science operations from 16:21 UT to 20:14 UT due to
  the operator forgetting to load the science plan for the afternoon.  
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Observations.
COMMENTS: 
=============================================================================
DATE:30-June-2000
DOY: 182
OPERATIONS ENGINEER(S):  R. Yurow / C. Maroney
SCIENTIST: W. Thompson
CDS INSTRUMENT: 
  The science plan was aborted at 15:22 UT to prepare for a telemetry submode
  switch.
  A telemetry submode switch occured at 15:31 UT from submode 5 to submode 6.
  A NIS Setup Register A Failure system errror was detected.  
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Observations.
COMMENTS: 
=============================================================================