June 2002
 
=============================================================================
DATE:1-June-2002
DOY: 152
OPERATIONS ENGINEER(S): B. Donaldson
SCIENTIST: K. Bocchailini
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: MEDOC Campaign
=============================================================================
DATE:2-June-2002
DOY: 153
OPERATIONS ENGINEER(S): R. Yurow
SCIENTIST: K. Bocchailini
CDS INSTRUMENT: 
  CDS doors were shut at 19:14 UT in preparation for S/C maneuvers.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: MEDOC Campaign
=============================================================================
DATE:3-June-2002
DOY: 154
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: K. Phillips (RAL)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Doors Closed for Maneuvers.
COMMENTS: 
=============================================================================
DATE:4-June-2002
DOY: 155
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: K. Phillips (RAL)
CDS INSTRUMENT: 
  Slit testing was conducted between 20:34 UT and 22:00 UT.  Testing was
aborted 2/3 of the way through the first test due to mistakes and the
difficulty of performing the test.
CDS GROUND SYSTEM: 
  The following studies were imported to the EOF:
ntbrmdi1_71.def
ntbrmdi2_4.def.
DAY PLAN: Doors Closed for Maneuvers, Slit Testing.
COMMENTS: 
=============================================================================
DATE:5-June-2002
DOY: 156
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: K. Phillips (RAL)
CDS INSTRUMENT: 
  Doors were opened at 00:44 UT.  Science continued at 01:00 UT.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Open Doors, Science Operations.
COMMENTS: 
=============================================================================
DATE:6-June-2002
DOY: 157
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: K. Phillips (RAL)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:07-June-2002
DOY: 158
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: K. Phillips (RAL)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:08-June-2002
DOY: 159
OPERATIONS ENGINEER(S): B. Donaldson
SCIENTIST: K. Phillips (RAL)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:09-June-2002
DOY: 160
OPERATIONS ENGINEER(S): R. Yurow
SCIENTIST: K. Phillips (RAL)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:10-June-2002
DOY: 161
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: P. Young
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM:
  The following studies were imported to the EOF:
	j_loop1_2.def
	j_loop2_1.def
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:11-June-2002
DOY: 162
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: P. Young
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM:
  The following study was imported to the EOF:
	fw_fast2_1.def
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:12-June-2002
DOY: 163
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: P. Young
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM:
  The following raster durations were updated:
	NTBRMDI1 (11/111) was changed from 2100 s to 2200 s
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:13-June-2002
DOY: 164
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: P. Young
CDS INSTRUMENT: 
  A single run of FFCAL (NIS Flat Field Calibration) was completed at 
  16:47 UT
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:14-June-2002
DOY: 165
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: P. Young
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:15-June-2002
DOY: 166
OPERATIONS ENGINEER(S): B. Donaldson
SCIENTIST: P. Young
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:16-June-2002
DOY: 167
OPERATIONS ENGINEER(S): R. Yurow
SCIENTIST: P. Young
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:17-June-2002
DOY: 168
OPERATIONS ENGINEER(S): R. Yurow / C. Maroney
SCIENTIST: T. Kucera
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: 
  The IWS command rate was changed to 1 / 10s to enable commands to 
  loaded on DSN-27 and DSN-16.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:18-June-2002
DOY: 169
OPERATIONS ENGINEER(S): R. Yurow
SCIENTIST: T. Kucera
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:19-June-2002
DOY: 170
OPERATIONS ENGINEER(S): R. Yurow
SCIENTIST: T. Kucera
CDS INSTRUMENT: 
  A parity error was detected in the primary processor memory space.  As the
  parity error is in a safe location, no reboot is necessary.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:20-June-2002
DOY: 171
OPERATIONS ENGINEER(S): R. Yurow
SCIENTIST: T. Kucera
CDS INSTRUMENT: 
  A mechanism lubrication was completed at 17:22 UT.
  Slit testing using the script SLIT_TEST3 was performed from 17:26 UT to
  17:49 UT.  The script was aborted due to time constraints.
CDS GROUND SYSTEM: 
  The FITS file archive was changed to /cdsfits/arch29
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:21-June-2002
DOY: 172
OPERATIONS ENGINEER(S): R. Yurow
SCIENTIST: T. Kucera
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:22-June-2002
DOY: 173
OPERATIONS ENGINEER(S): B. Donaldson
SCIENTIST: T. Kucera
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:23-June-2002
DOY: 174
OPERATIONS ENGINEER(S): R. Yurow
SCIENTIST: T. Kucera
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:24-June-2002
DOY: 175
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: B. Thompson
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:25-June-2002
DOY: 176
OPERATIONS ENGINEER(S): C. Maroney
SCIENTIST: B. Thompson
CDS INSTRUMENT: 
  The Primary Processor was rebooted at 17:00 UT.  Due to the commanding rate
set at 1/10 sec., CDS was in SNOOZE mode longer than expected.  As a result
at 17:20 UT, CTM 24 toggled Yellow Low for 20 minutes.  The science plan was
modified because of a gap in contact from 17:00 - 19:40 UT, to start at
20:30 UT.  CDS nominal.
CDS GROUND SYSTEM:
  The IWS command rate was changed from 1/10 sec. to 1/3 sec. for commanding 
on DSN-16 (currently reported OK for commanding).
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:26-June-2002
DOY: 177
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: B. Thompson
CDS INSTRUMENT: 
  Slit position testing was run between 19:00 UT and 22:00 UT.  Two runs of
the script SLIT_TEST3 were performed, once on Slit 1 and once on Slit 2.
However, due to a script error, the data from the initial run was lost.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:27-June-2002
DOY: 178
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: B. Thompson
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: 
  The IWS commanding rate was changed from 1/3 sec to 1/10 sec for commanding
on DSN-27 (degraded TLM was reported).
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:28-June-2002
DOY: 179
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: B. Thompson
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:29-June-2002
DOY: 180
OPERATIONS ENGINEER(S): B. Donaldson
SCIENTIST: B. Thompson
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:30-June-2002
DOY: 181
OPERATIONS ENGINEER(S): R. Yurow
SCIENTIST: B. Thompson
CDS INSTRUMENT: 
  A parity error was detected in the Primary processor memory space at
address #8003bd77. This is in a safe area.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================