Scientific Operations | ||
|
June 2004============================================================================= DATE: 1-June-2004 DOY: 153 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: P. Young (RAL) CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE: 2-June-2004 DOY: 154 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: P. Young (RAL) CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: A telemetry submode change from Submode 5 to Submode 6 occured at 13:45 UT. CDS Nominal. The following study was imported to the EOF: venus2_1.def Another telemetry submode change (back to Submode 5) occured at 01:47 UT. CDS still nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE: 3-June-2004 DOY: 155 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: F. Baudin (MEDOC) CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: The IWS command rate was changed to 1/3 sec for fast commanding on a good station. DAY PLAN: Science Operations. COMMENTS: MEDOC Campaign ============================================================================= DATE: 4-June-2004 DOY: 156 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: F. Baudin (MEDOC) CDS INSTRUMENT: A mechanism lubrication was completed at 19:47 UT. CDS GROUND SYSTEM: The following study was imported to the EOF: venus3_1.def The following gsets were imported to the EOF: gset78 gset79 DAY PLAN: Science Operations, Flat Field Calibration. COMMENTS: MEDOC Campaign ============================================================================= DATE: 5-June-2004 DOY: 157 OPERATIONS ENGINEER(S): B. Howell / C. King SCIENTIST: F. Baudin (MEDOC) CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: MEDOC Campaign ============================================================================= DATE: 6-June-2004 DOY: 158 OPERATIONS ENGINEER(S): B. Howell / C. King SCIENTIST: F. Baudin (MEDOC) CDS INSTRUMENT: A macro error occured while running the NIMCP study on June 5 at 21:02 UT. The macro error was a SEQUENCE/FORMAT error relating to sequence table 56 ID-23042. The contents of the CVT directory have been copied to $CDS_CP_CVTFILES/save for further investigation. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: MEDOC Campaign ============================================================================= DATE: 7-June-2004 DOY: 159 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: G. Pouget / K. Bocchialini (MEDOC) CDS INSTRUMENT: Due to email problems Mondays plan was not imported on Friday before XCPT was run and plan loaded. The Emergency study kicked off at 01:00 UT, (DOY 159). A modified plan was imported and loaded. Science will resume at 17:30 UT. CDS GROUND SYSTEM: The following raster duration was modified: POUGET_5 rid/245 var/1 64s - 70s DAY PLAN: Science Operations. COMMENTS: MEDOC Campaign ============================================================================= DATE: 8-June-2004 DOY: 160 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: G. Pouget / K. Bocchialini (MEDOC) CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: MEDOC Campaign / Venus Transit ============================================================================= DATE: 9-June-2004 DOY: 161 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: G. Pouget / K. Bocchialini (MEDOC) CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: MEDOC Campaign ============================================================================= DATE: 10-June-2004 DOY: 162 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: G. Pouget / K. Bocchialini (MEDOC) CDS INSTRUMENT: At sometime around 13:00 UT, the NIS stopped taking science data. Also, GIS detectors 1 and 2 tripped. Cause is under investigation. The GIS detectors 1 and 2 were reset at 18:15 UT and 18:18 UT. The NIS was then reset at 18:47 UT in hopes that it would solve whatever problem had caused it to stop taking science data. However, following the reset of the NIS, the science plan failed to resume with the next time tagged study. While getting the NIS setup for testing, commands to CDS began generating OBDH bit errors. It was then necessary to do a full reboot of CDS. At 03:02 UT, on DOY 163, a full CDS reboot was completed. The science plan will resume at 03:30 UT. Data from DOY 162 @ ~13:00 UT until DOY 163 @ 03:30 UT is unrecoverable. Files affected: s30303r404.fits - s30308r*.fits CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: MEDOC Campaign ============================================================================= DATE: 11-June-2004 DOY: 163 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: G. Pouget / K. Bocchialini (MEDOC) CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: MEDOC Campaign ============================================================================= DATE: 12-June-2004 DOY: 164 OPERATIONS ENGINEER(S): B. Howell / C. King SCIENTIST: G. Pouget / K. Bocchialini (MEDOC) CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: MEDOC Campaign ============================================================================= DATE: 13-June-2004 DOY: 165 OPERATIONS ENGINEER(S): B. Howell / C. King SCIENTIST: G. Pouget / K. Bocchialini (MEDOC) CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: MEDOC Campaign ============================================================================= DATE: 14-June-2004 DOY: 166 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: G. Pouget / B. Bromage (MEDOC) CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: MEDOC Campaign ============================================================================= DATE: 15-June-2004 DOY: 167 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: G. Pouget / B. Bromage (MEDOC) CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: MEDOC Campaign ============================================================================= DATE: 16-June-2004 DOY: 168 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: G. Pouget / B. Bromage (MEDOC) CDS INSTRUMENT: A NIS Setup Register A failure occured. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: MEDOC Campaign ============================================================================= DATE: 17-June-2004 DOY: 169 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: G. Pouget / B. Bromage (MEDOC) CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: A telemetry submode change from (submode 5 to submode 6) occured at 14:45 UT. CDS is nominal after submode change. DAY PLAN: Science Operations. COMMENTS: MEDOC Campaign ============================================================================= DATE: 18-June-2004 DOY: 170 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: G. Pouget / B. Bromage (MEDOC) CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: MEDOC Campaign ============================================================================= DATE: 19-June-2004 DOY: 171 OPERATIONS ENGINEER(S): B. Howell / C. King SCIENTIST: G. Pouget / B. Bromage (MEDOC) CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: MEDOC Campaign ============================================================================= DATE: 20-June-2004 DOY: 172 OPERATIONS ENGINEER(S): B. Howell / C. King SCIENTIST: G. Pouget / B. Bromage (MEDOC) CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: MEDOC Campaign ============================================================================= DATE: 21-June-2004 DOY: 173 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: P. Young (RAL) CDS INSTRUMENT: CDS Doors were closed at 15:45 UT for S/C maneuvers. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE: 22-June-2004 DOY: 174 OPERATIONS ENGINEER(S): R. Yurow SCIENTIST: P. Young (RAL) CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: S/C Maneuvers (180 Roll), Limited Science Operations. COMMENTS: ============================================================================= DATE: 23-June-2004 DOY: 175 OPERATIONS ENGINEER(S): R. Yurow SCIENTIST: P. Young (RAL) CDS INSTRUMENT: CDS Doors were opened at 23:01 UT. CDS was placed back on the ESR Warning Flag list shortly there after. CDS GROUND SYSTEM: Nominal. DAY PLAN: CDS Recovery, Science Operations. COMMENTS: ============================================================================= DATE: 24-June-2004 DOY: 176 OPERATIONS ENGINEER(S): R. Yurow SCIENTIST: P. Young (RAL) CDS INSTRUMENT: The mechanism lubrication engineering study ran today at 17:52 UT. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE: 25-June-2004 DOY: 177 OPERATIONS ENGINEER(S): R. Yurow SCIENTIST: P. Young (RAL) CDS INSTRUMENT: A Secondary memory error was detected at address #8005d30b. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE: 26-June-2004 DOY: 178 OPERATIONS ENGINEER(S): B. Howell / C. King SCIENTIST: P. Young (RAL) CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE: 27-June-2004 DOY: 179 OPERATIONS ENGINEER(S): B. Howell / C. King SCIENTIST: P. Young (RAL) CDS INSTRUMENT: CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE: 28-June-2004 DOY: 180 OPERATIONS ENGINEER(S): R. Yurow SCIENTIST: P. Young (RAL) CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE: 29-June-2004 DOY: 181 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: P. Young (RAL) CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE: 30-June-2004 DOY: 182 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: P. Young (RAL) CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= From the CDS Operations Management Team in the Space Science & Technology Department at CCLRC Rutherford Appleton Laboratory Site maintained by John Rainnie. Last revised on Tuesday (17/Jul/2001) at 09:03. |