Scientific Operations
 Front Page
 Scientific Ops
  » Plans
  » Pointings
  » Report
  » Requests
  » Log
  » Notes
  » Tech Info
 Engineering
 Software
 Results
 Gallery
 Atlas
 Press
 Links
 Project
 Newsletter
 Copyright
June 2004
 
=============================================================================
DATE: 1-June-2004
DOY: 153
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: P. Young (RAL)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal. 
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE: 2-June-2004
DOY: 154
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: P. Young (RAL)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: 
  A telemetry submode change from Submode 5 to Submode 6 occured at 13:45 UT.
CDS Nominal.
  The following study was imported to the EOF:
    venus2_1.def
  Another telemetry submode change (back to Submode 5) occured at 01:47 UT.
CDS still nominal. 
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE: 3-June-2004
DOY: 155
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: F. Baudin (MEDOC)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: 
  The IWS command rate was changed to 1/3 sec for fast commanding on a good
station.
DAY PLAN: Science Operations.
COMMENTS: MEDOC Campaign
=============================================================================
DATE: 4-June-2004
DOY: 156
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: F. Baudin (MEDOC)
CDS INSTRUMENT: 
  A mechanism lubrication was completed at 19:47 UT.
CDS GROUND SYSTEM: 
  The following study was imported to the EOF:
    venus3_1.def
  The following gsets were imported to the EOF:
    gset78
    gset79 
DAY PLAN: Science Operations, Flat Field Calibration.
COMMENTS: MEDOC Campaign
=============================================================================
DATE: 5-June-2004
DOY: 157
OPERATIONS ENGINEER(S): B. Howell / C. King
SCIENTIST: F. Baudin (MEDOC)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal. 
DAY PLAN: Science Operations.
COMMENTS: MEDOC Campaign
=============================================================================
DATE: 6-June-2004
DOY: 158
OPERATIONS ENGINEER(S): B. Howell / C. King
SCIENTIST: F. Baudin (MEDOC)
CDS INSTRUMENT: 
  A macro error  occured while running the NIMCP study on June 5 at 21:02 UT.
The macro error was a SEQUENCE/FORMAT error relating to sequence table 56
ID-23042.  The contents of the CVT directory have been copied to 
$CDS_CP_CVTFILES/save for further investigation.
CDS GROUND SYSTEM: Nominal. 
DAY PLAN: Science Operations.
COMMENTS: MEDOC Campaign
=============================================================================
DATE: 7-June-2004
DOY: 159
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: G. Pouget / K. Bocchialini (MEDOC)
CDS INSTRUMENT: 
  Due to email problems Mondays plan was not imported on Friday before XCPT 
was run and plan loaded.  The Emergency study kicked off at 01:00 UT, 
(DOY 159).  A modified plan was imported and loaded.  Science will resume
at 17:30 UT.
CDS GROUND SYSTEM: 
  The following raster duration was modified:
    POUGET_5    rid/245    var/1    64s - 70s
DAY PLAN: Science Operations.
COMMENTS: MEDOC Campaign 
=============================================================================
DATE: 8-June-2004
DOY: 160
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: G. Pouget / K. Bocchialini (MEDOC)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: MEDOC Campaign / Venus Transit
=============================================================================
DATE: 9-June-2004
DOY: 161
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: G. Pouget / K. Bocchialini (MEDOC)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: MEDOC Campaign
=============================================================================
DATE: 10-June-2004
DOY: 162
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: G. Pouget / K. Bocchialini (MEDOC)
CDS INSTRUMENT: 
  At sometime around 13:00 UT, the NIS stopped taking science data.  Also, 
GIS detectors 1 and 2 tripped.  Cause is under investigation.
  The GIS detectors 1 and 2 were reset at 18:15 UT and 18:18 UT.
  The NIS was then reset at 18:47 UT in hopes that it would solve whatever
problem had caused it to stop taking science data.
  However, following the reset of the NIS, the science plan failed to resume
with the next time tagged study.  While getting the NIS setup for testing, 
commands to CDS began generating OBDH bit errors.  It was then necessary
to do a full reboot of CDS.
  At 03:02 UT, on DOY 163, a full CDS reboot was completed. The science
plan will resume at 03:30 UT.  
  Data from DOY 162 @ ~13:00 UT until DOY 163 @ 03:30 UT is unrecoverable.
Files affected: s30303r404.fits - s30308r*.fits
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: MEDOC Campaign
=============================================================================
DATE: 11-June-2004
DOY: 163
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: G. Pouget / K. Bocchialini (MEDOC)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: MEDOC Campaign
=============================================================================
DATE: 12-June-2004
DOY: 164
OPERATIONS ENGINEER(S): B. Howell / C. King
SCIENTIST: G. Pouget / K. Bocchialini (MEDOC)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: MEDOC Campaign
=============================================================================
DATE: 13-June-2004
DOY: 165
OPERATIONS ENGINEER(S): B. Howell / C. King
SCIENTIST: G. Pouget / K. Bocchialini (MEDOC)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: MEDOC Campaign
=============================================================================
DATE: 14-June-2004
DOY: 166
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: G. Pouget / B. Bromage (MEDOC)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: MEDOC Campaign
=============================================================================
DATE: 15-June-2004
DOY: 167
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: G. Pouget / B. Bromage (MEDOC)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: MEDOC Campaign
=============================================================================
DATE: 16-June-2004
DOY: 168
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: G. Pouget / B. Bromage (MEDOC)
CDS INSTRUMENT: 
  A NIS Setup Register A failure occured.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: MEDOC Campaign
=============================================================================
DATE: 17-June-2004
DOY: 169
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: G. Pouget / B. Bromage (MEDOC)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: 
  A telemetry submode change from (submode 5 to submode 6) occured at 
14:45 UT.  CDS is nominal after submode change.
DAY PLAN: Science Operations.
COMMENTS: MEDOC Campaign
=============================================================================
DATE: 18-June-2004
DOY: 170
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: G. Pouget / B. Bromage (MEDOC)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: MEDOC Campaign
=============================================================================
DATE: 19-June-2004
DOY: 171
OPERATIONS ENGINEER(S): B. Howell / C. King
SCIENTIST: G. Pouget / B. Bromage (MEDOC)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: MEDOC Campaign
=============================================================================
DATE: 20-June-2004
DOY: 172
OPERATIONS ENGINEER(S): B. Howell / C. King
SCIENTIST: G. Pouget / B. Bromage (MEDOC)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: MEDOC Campaign
=============================================================================
DATE: 21-June-2004
DOY: 173
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: P. Young (RAL)
CDS INSTRUMENT: 
  CDS Doors were closed at 15:45 UT for S/C maneuvers.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE: 22-June-2004
DOY: 174
OPERATIONS ENGINEER(S): R. Yurow
SCIENTIST: P. Young (RAL)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: S/C Maneuvers (180 Roll), Limited Science Operations.
COMMENTS: 
=============================================================================
DATE: 23-June-2004
DOY: 175
OPERATIONS ENGINEER(S): R. Yurow
SCIENTIST: P. Young (RAL)
CDS INSTRUMENT: 
  CDS Doors were opened at 23:01 UT.  CDS was placed back on the ESR Warning
Flag list shortly there after.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: CDS Recovery, Science Operations.
COMMENTS: 
=============================================================================
DATE: 24-June-2004
DOY: 176
OPERATIONS ENGINEER(S): R. Yurow
SCIENTIST: P. Young (RAL)
CDS INSTRUMENT: 
  The mechanism lubrication engineering study ran today at 17:52 UT.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE: 25-June-2004
DOY: 177
OPERATIONS ENGINEER(S): R. Yurow
SCIENTIST: P. Young (RAL)
CDS INSTRUMENT: 
  A Secondary memory error was detected at address #8005d30b.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE: 26-June-2004
DOY: 178
OPERATIONS ENGINEER(S): B. Howell / C. King
SCIENTIST: P. Young (RAL)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE: 27-June-2004
DOY: 179
OPERATIONS ENGINEER(S): B. Howell / C. King
SCIENTIST: P. Young (RAL)
CDS INSTRUMENT: 
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE: 28-June-2004
DOY: 180
OPERATIONS ENGINEER(S): R. Yurow
SCIENTIST: P. Young (RAL)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE: 29-June-2004
DOY: 181
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: P. Young (RAL)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE: 30-June-2004
DOY: 182
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: P. Young (RAL)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================



From the CDS Operations Management Team in the Space Science & Technology Department at CCLRC Rutherford Appleton Laboratory
Site maintained by John Rainnie.
Last revised on Tuesday (17/Jul/2001) at 09:03.