DATE: 1-June-2005
DOY: 152
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: S. Parenti (MEDOC)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: MEDOC Campaign
=============================================================================
DATE: 2-June-2005
DOY: 153
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: S. Parenti (MEDOC)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: MEDOC Campaign
=============================================================================
DATE: 3-June-2005
DOY: 154
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: S. Parenti (MEDOC)
CDS INSTRUMENT: 
  A parity error was detected on the primary processor at address
location #8007b377 (Sequence Tables - Not Safe).  A reboot will be scheduled
after keyhole operations.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: MEDOC Campaign
=============================================================================
DATE: 4-June-2005
DOY: 155
OPERATIONS ENGINEER(S): R. Yurow
SCIENTIST: S. Parenti (MEDOC)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: MEDOC Campaign
=============================================================================
DATE: 5-June-2005
DOY: 156
OPERATIONS ENGINEER(S): R. Yurow
SCIENTIST: S. Parenti (MEDOC)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: MEDOC Campaign
=============================================================================
DATE: 6-June-2005
DOY: 157
OPERATIONS ENGINEER(S): C. Maroney
SCIENTIST: G. Del Zanna (GSFC)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE: 7-June-2005
DOY: 158
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: G. Del Zanna (GSFC)
CDS INSTRUMENT: 
  Plan for DOY 159 started at 00:00 UT.  However, since upload pass was
scheduled for 01:00 UT, DOY 159, plan upload caused a series of invalid
time sequence errors.  Plan was deleted and will be reloaded to start at
02:30 UT, DOY 159 with the SYNOP_F study replaced by the SYNOP_G5.
  GIMCPS1/v1 violated the following YELLOW HIGH limits for the FOT:
CUGHV1, CUGHV2, CUGHV3.  This was caused because the study was planned
for 2 raster repeats (GIMCPS1/v1 can only be run once - no raster repeats
and only one pointing).
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE: 8-June-2005
DOY: 159
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: G. Del Zanna (GSFC)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE: 9-June-2005
DOY: 160
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: G. Del Zanna (GSFC)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE: 10-June-2005
DOY: 161
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: G. Del Zanna (GSFC)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE: 11-June-2005
DOY: 162
OPERATIONS ENGINEER(S): R. Yurow
SCIENTIST: G. Del Zanna (GSFC)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE: 12-June-2005
DOY: 163
OPERATIONS ENGINEER(S): R. Yurow
SCIENTIST: G. Del Zanna (GSFC)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE: 13-June-2005
DOY: 164
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: C. Maroney (GSFC)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE: 14-June-2005
DOY: 165
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: C. Maroney (GSFC)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE: 15-June-2005
DOY: 166
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: C. Maroney (GSFC)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE: 16-June-2005
DOY: 167
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: C. Maroney (GSFC)
CDS INSTRUMENT: 
  CDS doors were closed at 16:30 UT, for S/C maneuvers.
  An on-board Mechanism Lubrication (ENG-AT) was completed at 20:00 UT, 
while doors were closed.
  A primary memory error was detected at address #800509d3 (Compression
Module - Safe).
CDS GROUND SYSTEM: 
  At ~04:45am (local), PDU-15 experienced a power failure.  This caused
cds7, cdso7 and cdso9 to go down.  CDS machines rebooted themselves and
are currently nominal.
  Due to DSS-14 going ORANGE, CDS was advised to safe for S/C maneuvers
early.  FLARE_AR (Study 32807, raster 41) was aborted at 16:28 UT.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE: 17-June-2005
DOY: 168
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: C. Maroney (GSFC)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Closed Door - Science Operations.
COMMENTS: S/C Maneuver - Roll to 180 Deg position.
=============================================================================
DATE: 18-June-2005
DOY: 169
OPERATIONS ENGINEER(S): R. Yurow
SCIENTIST: C. Maroney (GSFC)
CDS INSTRUMENT: 
  CDS doors were opened at 16:34 UT.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE: 19-June-2005
DOY: 170
OPERATIONS ENGINEER(S): R. Yurow
SCIENTIST: C. Maroney (GSFC)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE: 20-June-2005
DOY: 171
OPERATIONS ENGINEER(S): C. Maroney
SCIENTIST: C. Nestlerode (GSFC)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE: 21-June-2005
DOY: 172
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: C. Nestlerode (GSFC)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE: 22-June-2005
DOY: 173
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: C. Nestlerode (GSFC)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE: 23-June-2005
DOY: 174
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: C. Nestlerode (GSFC)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: 
  A submode change from submode 5 to submode 6 was initiated at 15:35 UT.
At the same time, due to PDU maintenance, power was lost to cds7, cdso7 and
cdso9.  Verification that CDS was nominal following the submode change was
done by sending a command from the IMOC.
  Power was restored at 16:35 UT.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE: 24-June-2005
DOY: 175
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: C. Nestlerode (GSFC)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE: 25-June-2005
DOY: 176
OPERATIONS ENGINEER(S): R. Yurow
SCIENTIST: C. Nestlerode (GSFC)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE: 26-June-2005
DOY: 177
OPERATIONS ENGINEER(S): R. Yurow
SCIENTIST: C. Nestlerode (GSFC)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: 
  The IWS command rate was changed at 21:35 UT to 1/10s to enable commanding 
on DSN-27.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE: 27-June-2005
DOY: 178
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: J. Rainnie (RAL)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE: 28-June-2005
DOY: 179
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: J. Rainnie (RAL)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE: 29-June-2005
DOY: 180
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: J. Rainnie (RAL)
CDS INSTRUMENT: 
  A Full Reboot was performed from 14:45 - 16:42 UT. Science plan will
continue at 17:30 UT.
CDS GROUND SYSTEM: 
  The IWS command rate was changed to 1/7s at 14:45 UT for commanding on
DSN-27.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE: 30-June-2005
DOY: 181
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: J. Rainnie (RAL)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================



From the CDS Operations Management Team in the Space Science & Technology Department at CCLRC Rutherford Appleton Laboratory
Site maintained by John Rainnie.
Last revised on Tuesday (17/Jul/2001) at 09:03.