Scientific Operations
 Front Page
 Scientific Ops
  » Plans
  » Pointings
  » Report
  » Requests
  » Log
  » Notes
  » Tech Info
 Engineering
 Software
 Results
 Gallery
 Atlas
>  Press
 Links
 Project
 Newsletter
 Copyright
March 2006
 
=============================================================================
DATE: 1-Mar-2006
DOY: 060
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: P. Young (RAL)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Keyhole Science Operations.
COMMENTS: 
=============================================================================
DATE: 2-Mar-2006
DOY: 061
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: P. Young (RAL)
CDS INSTRUMENT: 
  A primary memory error was detected at address #8004bdd7 - SAFE 
(Science Module).
  GIS raw dumps and a test of the filaments were run between 01:00 UT and
02:30 UT.  Both filaments behaved nominally.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Keyhole Science Operations.
COMMENTS: 
=============================================================================
DATE: 3-Mar-2006
DOY: 062
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: P. Young (RAL)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Keyhole Science Operations.
COMMENTS: 
=============================================================================
DATE: 4-Mar-2006
DOY: 063
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: P. Young (RAL)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Keyhole Science Operations.
COMMENTS: 
=============================================================================
DATE: 5-Mar-2006
DOY: 064
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: P. Young (RAL)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Keyhole Science Operations.
COMMENTS: 
=============================================================================
DATE: 6-Mar-2006
DOY: 065
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: P. Young (RAL)
CDS INSTRUMENT: 
  A primary parity error was detected at address #80068563 - Deferred Module.
A reboot will be scheduled at the end of Keyhole.
  A VDS Setup Register A Failure was detected.
  CDS Doors (Both NIS and GIS) were closed at 19:35 UT for S/C Maneuvers.
  ESR flag for CDS was disabled at 19:50 UT.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Keyhole Science Operations.
COMMENTS: 
=============================================================================
DATE: 7-Mar-2006
DOY: 066
OPERATIONS ENGINEER(S): C. Maroney
SCIENTIST: P. Young (RAL)
CDS INSTRUMENT: 
  A secondary parity error was detected at address #80059a73.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Doors Closed for S/C Maneuvers
COMMENTS: 
=============================================================================
DATE: 8-Mar-2006
DOY: 067
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: P. Young (RAL)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Doors Closed for S/C Maneuvers
COMMENTS: 
=============================================================================
DATE: 9-Mar-2006
DOY: 068
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: P. Young (RAL)
CDS INSTRUMENT: 
  A parity error was detected on the primary processor at address #80054f47
(Science Module - Safe).
  CDS NIS door was opened at 23:30 UT (GIS Door remains closed for GIS
filament dumps.
  GIS filament dumps were performed on detectors 1 and 2 from 23:30 UT to
04:00 UT (DOY 069).
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Keyhole Science Operations.
COMMENTS: 
=============================================================================
DATE: 10-Mar-2006
DOY: 069
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: P. Young (RAL)
CDS INSTRUMENT:
  The ESR flag was re-enabled at 02:16 UT.
  A parity error was detected on the secondary (Science) processor at 
address #8000cf93.
  GIS filament dumps of detectors 3 and 4, occured between 21:30 UT and 
00:00 UT.  Due to an error in reading the schedule, there was not time at 
the end of the pass to stop the filament dump and safe the instrument.
  The filament dump was halted on the next pass at 03:46 UT (DOY 070).
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Keyhole Science Operations.
COMMENTS: 
=============================================================================
DATE: 11-Mar-2006
DOY: 070
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: P. Young (RAL)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Keyhole Science Operations.
COMMENTS: 
=============================================================================
DATE: 12-Mar-2006
DOY: 071
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: C. Maroney (GSFC)
CDS INSTRUMENT: 
  A secondary (Science) processor error was detected at #8007996b.
  GIS filament dumps of detectors 1 and 2 (positive FFV) were performed
between 01:35 UT and 04:15 UT.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Keyhole Science Operations.
COMMENTS: 
=============================================================================
DATE: 13-Mar-2006
DOY: 072
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: C. Maroney (GSFC)
CDS INSTRUMENT: 
  GIS filament dumps of detectors 3 and 4 (positive FFV) were performed
between 19:00 UT and 21:30 UT.
  The GIS door was opened at 21:40 UT.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Keyhole Science Operations.
COMMENTS: 
=============================================================================
DATE: 14-Mar-2006
DOY: 073
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: C. Maroney (GSFC)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Keyhole Science Operations.
COMMENTS: 
=============================================================================
DATE: 15-Mar-2006
DOY: 074
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: C. Maroney (GSFC)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Keyhole Science Operations.
COMMENTS: 
=============================================================================
DATE: 16-Mar-2006
DOY: 075
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: C. Maroney (GSFC)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Keyhole Science Operations.
COMMENTS: 34M Keyhole ends (17:50 UT)
=============================================================================
DATE: 17-Mar-2006
DOY: 076
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: C. Maroney (GSFC)
CDS INSTRUMENT: 
  The study NISAT_S (s34550r02) was aborted at 19:06 UT for a Submode Change.
  A Mechanism Lubrication was performed on-board at 20:30 UT.
CDS GROUND SYSTEM: 
  A Telemetry Submode Change from 5 to 6 occured at 19:10 UT.  CDS Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE: 18-Mar-2006
DOY: 077
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: C. Maroney (GSFC)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE: 19-Mar-2006
DOY: 078
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: C. Maroney (GSFC)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE: 20-Mar-2006
DOY: 079
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: C. Maroney (GSFC)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE: 21-Mar-2006
DOY: 080
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: C. Maroney (GSFC)
CDS INSTRUMENT: 
  A secondary (Science) parity error was detected at address #800516ff.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE: 22-Mar-2006
DOY: 081
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: C. Maroney (GSFC)
CDS INSTRUMENT: 
  GIS raw dumps were performed from 17:00 UT to 19:00 UT.
  CDS was rebooted using the CB3RESET command at 21:36 UT.  Reboot was 
completed at 22:47 UT.
  Due to problems with station 27, a science plan could not be loaded on this 
pass.  The science plan was restarted at 02:40 UT (DOY 082).
CDS GROUND SYSTEM: 
  A telemetry submode change from submode 6 to submode 5 occured at 19:37 UT.
CDS is nominal after the submode change.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE: 23-Mar-2006
DOY: 082
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: C. Maroney (GSFC)
CDS INSTRUMENT: 
  GIS raw dumps were performed from 20:30 UT to 22:00 UT.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE: 24-Mar-2006
DOY: 083
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: C. Maroney (GSFC)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE: 25-Mar-2006
DOY: 084
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: C. Maroney (GSFC)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE: 26-Mar-2006
DOY: 085
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: C. Maroney (GSFC)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE: 27-Mar-2006
DOY: 086
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: P. Young (RAL)
CDS INSTRUMENT: 
  At 22:00 UT, CUVMCP violated Red High limits for more than 12 formats.
Since CIVMCP was not violating, no action was necessary.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE: 28-Mar-2006
DOY: 087
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: P. Young (RAL)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE: 29-Mar-2006
DOY: 088
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: P. Young (RAL)
CDS INSTRUMENT: 
  A Setup VDS Register A Failure was detected.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE: 30-Mar-2006
DOY: 089
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: P. Young (RAL)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE: 31-Mar-2006
DOY: 090
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: P. Young (RAL)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: 
  A Telemetry Submode Change (5 to 6) occured at 16:35 UT.  CDS Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================



From the CDS Operations Management Team in the Space Science & Technology Department at CCLRC Rutherford Appleton Laboratory
Site maintained by John Rainnie.
Last revised on Thursday (19/Jan/2006) at 11:09.