Scientific Operations | ||
|
March 2006============================================================================= DATE: 1-Mar-2006 DOY: 060 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: P. Young (RAL) CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Keyhole Science Operations. COMMENTS: ============================================================================= DATE: 2-Mar-2006 DOY: 061 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: P. Young (RAL) CDS INSTRUMENT: A primary memory error was detected at address #8004bdd7 - SAFE (Science Module). GIS raw dumps and a test of the filaments were run between 01:00 UT and 02:30 UT. Both filaments behaved nominally. CDS GROUND SYSTEM: Nominal. DAY PLAN: Keyhole Science Operations. COMMENTS: ============================================================================= DATE: 3-Mar-2006 DOY: 062 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: P. Young (RAL) CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Keyhole Science Operations. COMMENTS: ============================================================================= DATE: 4-Mar-2006 DOY: 063 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: P. Young (RAL) CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Keyhole Science Operations. COMMENTS: ============================================================================= DATE: 5-Mar-2006 DOY: 064 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: P. Young (RAL) CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Keyhole Science Operations. COMMENTS: ============================================================================= DATE: 6-Mar-2006 DOY: 065 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: P. Young (RAL) CDS INSTRUMENT: A primary parity error was detected at address #80068563 - Deferred Module. A reboot will be scheduled at the end of Keyhole. A VDS Setup Register A Failure was detected. CDS Doors (Both NIS and GIS) were closed at 19:35 UT for S/C Maneuvers. ESR flag for CDS was disabled at 19:50 UT. CDS GROUND SYSTEM: Nominal. DAY PLAN: Keyhole Science Operations. COMMENTS: ============================================================================= DATE: 7-Mar-2006 DOY: 066 OPERATIONS ENGINEER(S): C. Maroney SCIENTIST: P. Young (RAL) CDS INSTRUMENT: A secondary parity error was detected at address #80059a73. CDS GROUND SYSTEM: Nominal. DAY PLAN: Doors Closed for S/C Maneuvers COMMENTS: ============================================================================= DATE: 8-Mar-2006 DOY: 067 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: P. Young (RAL) CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Doors Closed for S/C Maneuvers COMMENTS: ============================================================================= DATE: 9-Mar-2006 DOY: 068 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: P. Young (RAL) CDS INSTRUMENT: A parity error was detected on the primary processor at address #80054f47 (Science Module - Safe). CDS NIS door was opened at 23:30 UT (GIS Door remains closed for GIS filament dumps. GIS filament dumps were performed on detectors 1 and 2 from 23:30 UT to 04:00 UT (DOY 069). CDS GROUND SYSTEM: Nominal. DAY PLAN: Keyhole Science Operations. COMMENTS: ============================================================================= DATE: 10-Mar-2006 DOY: 069 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: P. Young (RAL) CDS INSTRUMENT: The ESR flag was re-enabled at 02:16 UT. A parity error was detected on the secondary (Science) processor at address #8000cf93. GIS filament dumps of detectors 3 and 4, occured between 21:30 UT and 00:00 UT. Due to an error in reading the schedule, there was not time at the end of the pass to stop the filament dump and safe the instrument. The filament dump was halted on the next pass at 03:46 UT (DOY 070). CDS GROUND SYSTEM: Nominal. DAY PLAN: Keyhole Science Operations. COMMENTS: ============================================================================= DATE: 11-Mar-2006 DOY: 070 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: P. Young (RAL) CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Keyhole Science Operations. COMMENTS: ============================================================================= DATE: 12-Mar-2006 DOY: 071 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: C. Maroney (GSFC) CDS INSTRUMENT: A secondary (Science) processor error was detected at #8007996b. GIS filament dumps of detectors 1 and 2 (positive FFV) were performed between 01:35 UT and 04:15 UT. CDS GROUND SYSTEM: Nominal. DAY PLAN: Keyhole Science Operations. COMMENTS: ============================================================================= DATE: 13-Mar-2006 DOY: 072 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: C. Maroney (GSFC) CDS INSTRUMENT: GIS filament dumps of detectors 3 and 4 (positive FFV) were performed between 19:00 UT and 21:30 UT. The GIS door was opened at 21:40 UT. CDS GROUND SYSTEM: Nominal. DAY PLAN: Keyhole Science Operations. COMMENTS: ============================================================================= DATE: 14-Mar-2006 DOY: 073 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: C. Maroney (GSFC) CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Keyhole Science Operations. COMMENTS: ============================================================================= DATE: 15-Mar-2006 DOY: 074 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: C. Maroney (GSFC) CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Keyhole Science Operations. COMMENTS: ============================================================================= DATE: 16-Mar-2006 DOY: 075 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: C. Maroney (GSFC) CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Keyhole Science Operations. COMMENTS: 34M Keyhole ends (17:50 UT) ============================================================================= DATE: 17-Mar-2006 DOY: 076 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: C. Maroney (GSFC) CDS INSTRUMENT: The study NISAT_S (s34550r02) was aborted at 19:06 UT for a Submode Change. A Mechanism Lubrication was performed on-board at 20:30 UT. CDS GROUND SYSTEM: A Telemetry Submode Change from 5 to 6 occured at 19:10 UT. CDS Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE: 18-Mar-2006 DOY: 077 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: C. Maroney (GSFC) CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE: 19-Mar-2006 DOY: 078 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: C. Maroney (GSFC) CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE: 20-Mar-2006 DOY: 079 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: C. Maroney (GSFC) CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE: 21-Mar-2006 DOY: 080 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: C. Maroney (GSFC) CDS INSTRUMENT: A secondary (Science) parity error was detected at address #800516ff. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE: 22-Mar-2006 DOY: 081 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: C. Maroney (GSFC) CDS INSTRUMENT: GIS raw dumps were performed from 17:00 UT to 19:00 UT. CDS was rebooted using the CB3RESET command at 21:36 UT. Reboot was completed at 22:47 UT. Due to problems with station 27, a science plan could not be loaded on this pass. The science plan was restarted at 02:40 UT (DOY 082). CDS GROUND SYSTEM: A telemetry submode change from submode 6 to submode 5 occured at 19:37 UT. CDS is nominal after the submode change. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE: 23-Mar-2006 DOY: 082 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: C. Maroney (GSFC) CDS INSTRUMENT: GIS raw dumps were performed from 20:30 UT to 22:00 UT. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE: 24-Mar-2006 DOY: 083 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: C. Maroney (GSFC) CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE: 25-Mar-2006 DOY: 084 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: C. Maroney (GSFC) CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE: 26-Mar-2006 DOY: 085 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: C. Maroney (GSFC) CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE: 27-Mar-2006 DOY: 086 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: P. Young (RAL) CDS INSTRUMENT: At 22:00 UT, CUVMCP violated Red High limits for more than 12 formats. Since CIVMCP was not violating, no action was necessary. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE: 28-Mar-2006 DOY: 087 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: P. Young (RAL) CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE: 29-Mar-2006 DOY: 088 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: P. Young (RAL) CDS INSTRUMENT: A Setup VDS Register A Failure was detected. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE: 30-Mar-2006 DOY: 089 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: P. Young (RAL) CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE: 31-Mar-2006 DOY: 090 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: P. Young (RAL) CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: A Telemetry Submode Change (5 to 6) occured at 16:35 UT. CDS Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= From the CDS Operations Management Team in the Space Science & Technology Department at CCLRC Rutherford Appleton Laboratory Site maintained by John Rainnie. Last revised on Thursday (19/Jan/2006) at 11:09. |