Scientific Operations | ![]() |
|
March 1996
====================================================================================
DOY -- 61
INSTRUMENT STATUS: Nominal
CDS GROUND SYSTEM: Nominal
PLANNING : Test 5/Test 6
Comments : 14:50 Update Alarm database to v.2.6
15:20 update to science s/w
====================================================================================
DOY -- 62
INSTRUMENT STATUS: Nominal
CDS GROUND SYSTEM: Nominal
PLANNING : SPECT (GIS Spectral Atlas) approx. 3 hrs
GIMCP (GIS MCP Test) approx. 50 min
NISAT (NIS SPectral Atlas) approx. 75 min
NIMCP (NIS MCP Test) approx. 15 min
Total Time: approx. 5.5 hrs
Comments : NISAT ran with slit 5 instead of 4
Sequence was aborted due to miscalculation.
NIMCP test was fine.
====================================================================================
DOY -- 63
INSTRUMENT STATUS: Nominal
CDS GROUND SYSTEM: Nominal
PLANNING : GIS raw data on slit 1 and 3 -- quiet sun
NIS Spectral Atlas
GIS MCP Test
Comments : NIS Spectral Atlas succesfull
====================================================================================
DOY -- 64
INSTRUMENT STATUS: Nominal
CDS GROUND SYSTEM: Nominal
PLANNING : Test 6
possibly SYNOP(N-S sun scan with NIS)
Primary event on 8002782b -- OK
====================================================================================
DOY -- 65
INSTRUMENT STATUS: Nominal
CDS GROUND SYSTEM: Nominal
PLANNING : Perform pointing calibration
Ran NISAT
Ran 2 rasters with SUMER
Comments : Low temp due to E Limb location
Calibration Errors on slit position - Corrected by moving it
slightly then back to home.
Studies 144-149.
====================================================================================
DOY -- 66
INSTRUMENT STATUS: Nominal
CDS GROUND SYSTEM: Nominal
PLANNING : GIS Raw data dumps
NIS MCP
NIS Spectral Atlas
VIEWFINDER
overnight
Comments : VIEWFINDER run at 18:40 -> study 150
GIS raw data dumps done prior to 18:40.
Overnight studies:
VIEWF 151
NIMCP_1/V1 152
NIMCP_2/V1 153
TEST6_1/v3 154
NISAT_S/V2 155
TEST6_1/v3 156
TEST6_1/V3 157
NISAT_S/V2 158
====================================================================================
DOY -- 67
INSTRUMENT STATUS: Nominal
CDS GROUND SYSTEM: Nominal
PLANNING : JOP 039 - bad image (159)
instead, VIEWF - 160, ran NIS_MOVIE.
CRASH CDHS
Comments : JOP039 started and we had to end it due to bad image.
Started a VIEWF and NIS_MOVIE.
====================================================================================
DOY -- 68
INSTRUMENT STATUS: Nominal
CDS GROUND SYSTEM: Nominal
PLANNING : Pick-up pieces from the cb9abort fiasco yesterday
Updated scripts in EOF database with those from RAL
Science plan for today:
NISAT_S/v2 164
EJECT study 163
Overnight:
TEST6_1/v3 (3 of them w/ SUMER).
Comments : ran sequence 4 again w/ new scripts and everything ran fine.
====================================================================================
DOY -- 69
INSTRUMENT STATUS: Nominal
CDS GROUND SYSTEM: Nominal
PLANNING :
Comments : GIS_SN/v1 -- had very flaky DSN contact.
====================================================================================
DOY -- 70
INSTRUMENT STATUS: Nominal
CDS GROUND SYSTEM: Nominal
PLANNING :
Comments : Major problems w/ see 10(QCM check)
Studies 175-181 run overnight.
====================================================================================
DOY -- 71
INSTRUMENT STATUS: Nominal
CDS GROUND SYSTEM: Nominal
PLANNING : Limited DSN time, run
2 NIS Spectral Atlas (TEST6_1/V3)
1 NIS raster (NISAT/v1)
====================================================================================
DOY -- 72
INSTRUMENT STATUS: Nominal
CDS GROUND SYSTEM: Nominal
PLANNING : Today COBS s/w patch. Tiday, just getting data and processing
last night's data. Will uplink plan for tomorrow.
Comments : Ended upclearing the DCS in order to uplink a new plan to
accomodate unexpected NRT. Plan is iuncluded here. Ignore stuff
from yesterday. Fits files 186-188.
====================================================================================
DOY -- 73
INSTRUMENT STATUS: Nominal
CDS GROUND SYSTEM: Nominal
PLANNING : Continue running last night's studies.
Comments : Mistakenly ran cb5runs 10 --> forgot we run cpt/new. Gave a
sequence error -- No problem.
Studies 191-196 ran; fits files were generated.
====================================================================================
DOY -- 74
INSTRUMENT STATUS: Nominal
CDS GROUND SYSTEM: Nominal
PLANNING : Continue running things in the TTC file from yesterday.
====================================================================================
DOY -- 75
INSTRUMENT STATUS: Nominal
CDS GROUND SYSTEM: Nominal
PLANNING : Last night processed FITS files up to 218.
Continouing plan from 2 days ago.
====================================================================================
DOY -- 76
INSTRUMENT STATUS: Nominal
CDS GROUND SYSTEM: Nominal
PLANNING : -
Comments : 23:05 GIS HV3 tripped.
====================================================================================
DOY -- 77
INSTRUMENT STATUS: Nominal
CDS GROUND SYSTEM: Nominal
PLANNING : -
====================================================================================
DOY -- 78
INSTRUMENT STATUS: Nominal
CDS GROUND SYSTEM: Nominal
PLANNING : -
====================================================================================
DOY -- 79
INSTRUMENT STATUS: Nominal
CDS GROUND SYSTEM: NominaL
PLANNING : RCMP UP FOR DETECTOR 3
====================================================================================
DOY -- 80
INSTRUMENT STATUS: Nominal. Doors closed.
CDS GROUND SYSTEM: Nominal
PLANNING : Trim Burn, update ICS tree. Moved slit to keep MCU backup happy.
====================================================================================
DOY -- 81
INSTRUMENT STATUS: Nominal
CDS GROUND SYSTEM: Nominal
PLANNING : Dark count test for GIS. Open NIS door.
====================================================================================
DOY -- 82
INSTRUMENT STATUS: Nominal
CDS GROUND SYSTEM: Nominal
PLANNING : GIS Filament data test and door open.
====================================================================================
DOY -- 83
INSTRUMENT STATUS: Nominal
CDS GROUND SYSTEM: Nominal
PLANNING : Test FLARE NIS, O_HIVEL2 NIS, ICAL_2 GIS
====================================================================================
DOY -- 84
INSTRUMENT STATUS: Nominal
CDS GROUND SYSTEM: Nominal
PLANNING :
Comments : MCU Backup errors.
====================================================================================
DOY -- 85
INSTRUMENT STATUS: Nominal
CDS GROUND SYSTEM: Nominal
PLANNING : Intercal 1.
Comments : GIS HV 3 Tripped.
cpt/LOADPLAN put an invalid command up.
====================================================================================
DOY -- 86
INSTRUMENT STATUS: Nominal
CDS GROUND SYSTEM: Nominal
PLANNING : -
====================================================================================
DOY -- 87
INSTRUMENT STATUS: Nominal
CDS GROUND SYSTEM: Nominal
PLANNING : -
====================================================================================
DOY -- 88
INSTRUMENT STATUS: Nominal. NIS Readout mode 2
CDS GROUND SYSTEM: Nominal
PLANNING : End of 50hr plan @ study #408
Comments : NIS AIVMCP High alarm @ 10:36 UT 5*51mA
AIV+5V alarms regularly during NIS sequences.
- added new GSET's (included)
- Updated VDSMODE, CBVCAM to 2 and VDSMODE to 656 in state
database.
====================================================================================
DOY -- 89
INSTRUMENT STATUS: Nominal
CDS GROUND SYSTEM: Nominal
PLANNING : -
====================================================================================
DOY -- 90
INSTRUMENT STATUS: Nominal
CDS GROUND SYSTEM: Nominal. /cs s/w update.
PLANNING : -
====================================================================================
DOY -- 91
INSTRUMENT STATUS: Nominal.
CDS GROUND SYSTEM: Nominal.
Moved /sohos1 and /usr/local disk from /csi_b to TCIB - cds8.
Moved /ecs disk to cds9; remounted it on /cdproc on cds9.
PLANNING :
Comments : ASVERR, ASVRGAF VDS errors detected.
====================================================================================
From the CDS Operations Management Team in the Space Science & Technology Department at CCLRC Rutherford Appleton Laboratory Site maintained by John Rainnie. Last revised on Tuesday (17/Jul/2001) at 09:01. |