Scientific Operations | ||
|
March 1996==================================================================================== DOY -- 61 INSTRUMENT STATUS: Nominal CDS GROUND SYSTEM: Nominal PLANNING : Test 5/Test 6 Comments : 14:50 Update Alarm database to v.2.6 15:20 update to science s/w ==================================================================================== DOY -- 62 INSTRUMENT STATUS: Nominal CDS GROUND SYSTEM: Nominal PLANNING : SPECT (GIS Spectral Atlas) approx. 3 hrs GIMCP (GIS MCP Test) approx. 50 min NISAT (NIS SPectral Atlas) approx. 75 min NIMCP (NIS MCP Test) approx. 15 min Total Time: approx. 5.5 hrs Comments : NISAT ran with slit 5 instead of 4 Sequence was aborted due to miscalculation. NIMCP test was fine. ==================================================================================== DOY -- 63 INSTRUMENT STATUS: Nominal CDS GROUND SYSTEM: Nominal PLANNING : GIS raw data on slit 1 and 3 -- quiet sun NIS Spectral Atlas GIS MCP Test Comments : NIS Spectral Atlas succesfull ==================================================================================== DOY -- 64 INSTRUMENT STATUS: Nominal CDS GROUND SYSTEM: Nominal PLANNING : Test 6 possibly SYNOP(N-S sun scan with NIS) Primary event on 8002782b -- OK ==================================================================================== DOY -- 65 INSTRUMENT STATUS: Nominal CDS GROUND SYSTEM: Nominal PLANNING : Perform pointing calibration Ran NISAT Ran 2 rasters with SUMER Comments : Low temp due to E Limb location Calibration Errors on slit position - Corrected by moving it slightly then back to home. Studies 144-149. ==================================================================================== DOY -- 66 INSTRUMENT STATUS: Nominal CDS GROUND SYSTEM: Nominal PLANNING : GIS Raw data dumps NIS MCP NIS Spectral Atlas VIEWFINDER overnight Comments : VIEWFINDER run at 18:40 -> study 150 GIS raw data dumps done prior to 18:40. Overnight studies: VIEWF 151 NIMCP_1/V1 152 NIMCP_2/V1 153 TEST6_1/v3 154 NISAT_S/V2 155 TEST6_1/v3 156 TEST6_1/V3 157 NISAT_S/V2 158 ==================================================================================== DOY -- 67 INSTRUMENT STATUS: Nominal CDS GROUND SYSTEM: Nominal PLANNING : JOP 039 - bad image (159) instead, VIEWF - 160, ran NIS_MOVIE. CRASH CDHS Comments : JOP039 started and we had to end it due to bad image. Started a VIEWF and NIS_MOVIE. ==================================================================================== DOY -- 68 INSTRUMENT STATUS: Nominal CDS GROUND SYSTEM: Nominal PLANNING : Pick-up pieces from the cb9abort fiasco yesterday Updated scripts in EOF database with those from RAL Science plan for today: NISAT_S/v2 164 EJECT study 163 Overnight: TEST6_1/v3 (3 of them w/ SUMER). Comments : ran sequence 4 again w/ new scripts and everything ran fine. ==================================================================================== DOY -- 69 INSTRUMENT STATUS: Nominal CDS GROUND SYSTEM: Nominal PLANNING : Comments : GIS_SN/v1 -- had very flaky DSN contact. ==================================================================================== DOY -- 70 INSTRUMENT STATUS: Nominal CDS GROUND SYSTEM: Nominal PLANNING : Comments : Major problems w/ see 10(QCM check) Studies 175-181 run overnight. ==================================================================================== DOY -- 71 INSTRUMENT STATUS: Nominal CDS GROUND SYSTEM: Nominal PLANNING : Limited DSN time, run 2 NIS Spectral Atlas (TEST6_1/V3) 1 NIS raster (NISAT/v1) ==================================================================================== DOY -- 72 INSTRUMENT STATUS: Nominal CDS GROUND SYSTEM: Nominal PLANNING : Today COBS s/w patch. Tiday, just getting data and processing last night's data. Will uplink plan for tomorrow. Comments : Ended upclearing the DCS in order to uplink a new plan to accomodate unexpected NRT. Plan is iuncluded here. Ignore stuff from yesterday. Fits files 186-188. ==================================================================================== DOY -- 73 INSTRUMENT STATUS: Nominal CDS GROUND SYSTEM: Nominal PLANNING : Continue running last night's studies. Comments : Mistakenly ran cb5runs 10 --> forgot we run cpt/new. Gave a sequence error -- No problem. Studies 191-196 ran; fits files were generated. ==================================================================================== DOY -- 74 INSTRUMENT STATUS: Nominal CDS GROUND SYSTEM: Nominal PLANNING : Continue running things in the TTC file from yesterday. ==================================================================================== DOY -- 75 INSTRUMENT STATUS: Nominal CDS GROUND SYSTEM: Nominal PLANNING : Last night processed FITS files up to 218. Continouing plan from 2 days ago. ==================================================================================== DOY -- 76 INSTRUMENT STATUS: Nominal CDS GROUND SYSTEM: Nominal PLANNING : - Comments : 23:05 GIS HV3 tripped. ==================================================================================== DOY -- 77 INSTRUMENT STATUS: Nominal CDS GROUND SYSTEM: Nominal PLANNING : - ==================================================================================== DOY -- 78 INSTRUMENT STATUS: Nominal CDS GROUND SYSTEM: Nominal PLANNING : - ==================================================================================== DOY -- 79 INSTRUMENT STATUS: Nominal CDS GROUND SYSTEM: NominaL PLANNING : RCMP UP FOR DETECTOR 3 ==================================================================================== DOY -- 80 INSTRUMENT STATUS: Nominal. Doors closed. CDS GROUND SYSTEM: Nominal PLANNING : Trim Burn, update ICS tree. Moved slit to keep MCU backup happy. ==================================================================================== DOY -- 81 INSTRUMENT STATUS: Nominal CDS GROUND SYSTEM: Nominal PLANNING : Dark count test for GIS. Open NIS door. ==================================================================================== DOY -- 82 INSTRUMENT STATUS: Nominal CDS GROUND SYSTEM: Nominal PLANNING : GIS Filament data test and door open. ==================================================================================== DOY -- 83 INSTRUMENT STATUS: Nominal CDS GROUND SYSTEM: Nominal PLANNING : Test FLARE NIS, O_HIVEL2 NIS, ICAL_2 GIS ==================================================================================== DOY -- 84 INSTRUMENT STATUS: Nominal CDS GROUND SYSTEM: Nominal PLANNING : Comments : MCU Backup errors. ==================================================================================== DOY -- 85 INSTRUMENT STATUS: Nominal CDS GROUND SYSTEM: Nominal PLANNING : Intercal 1. Comments : GIS HV 3 Tripped. cpt/LOADPLAN put an invalid command up. ==================================================================================== DOY -- 86 INSTRUMENT STATUS: Nominal CDS GROUND SYSTEM: Nominal PLANNING : - ==================================================================================== DOY -- 87 INSTRUMENT STATUS: Nominal CDS GROUND SYSTEM: Nominal PLANNING : - ==================================================================================== DOY -- 88 INSTRUMENT STATUS: Nominal. NIS Readout mode 2 CDS GROUND SYSTEM: Nominal PLANNING : End of 50hr plan @ study #408 Comments : NIS AIVMCP High alarm @ 10:36 UT 5*51mA AIV+5V alarms regularly during NIS sequences. - added new GSET's (included) - Updated VDSMODE, CBVCAM to 2 and VDSMODE to 656 in state database. ==================================================================================== DOY -- 89 INSTRUMENT STATUS: Nominal CDS GROUND SYSTEM: Nominal PLANNING : - ==================================================================================== DOY -- 90 INSTRUMENT STATUS: Nominal CDS GROUND SYSTEM: Nominal. /cs s/w update. PLANNING : - ==================================================================================== DOY -- 91 INSTRUMENT STATUS: Nominal. CDS GROUND SYSTEM: Nominal. Moved /sohos1 and /usr/local disk from /csi_b to TCIB - cds8. Moved /ecs disk to cds9; remounted it on /cdproc on cds9. PLANNING : Comments : ASVERR, ASVRGAF VDS errors detected. ==================================================================================== From the CDS Operations Management Team in the Space Science & Technology Department at CCLRC Rutherford Appleton Laboratory Site maintained by John Rainnie. Last revised on Tuesday (17/Jul/2001) at 09:01. |