Scientific Operations
 Front Page
 Scientific Ops
  » Plans
  » Pointings
  » Report
  » Requests
  » Log
  » Notes
  » Tech Info
 Engineering
 Software
 Results
 Gallery
 Atlas
 Press
 Links
 Project
 Newsletter
 Copyright
March 1996
 
====================================================================================
DOY -- 61

INSTRUMENT STATUS: Nominal      
CDS GROUND SYSTEM: Nominal     
PLANNING         : Test 5/Test 6
Comments	 : 14:50 Update Alarm database to v.2.6
		   15:20 update to science s/w 
====================================================================================
DOY -- 62

INSTRUMENT STATUS: Nominal      
CDS GROUND SYSTEM: Nominal     
PLANNING         : SPECT (GIS Spectral Atlas) approx. 3 hrs
		   GIMCP (GIS MCP Test)       approx. 50 min
		   NISAT (NIS SPectral Atlas) approx. 75 min
		   NIMCP (NIS MCP Test)       approx. 15 min
                      Total Time: approx. 5.5 hrs
Comments	 : NISAT ran with slit 5 instead of 4
		   Sequence was aborted due to miscalculation.
		   NIMCP test was fine.
====================================================================================
DOY --  63

INSTRUMENT STATUS: Nominal      
CDS GROUND SYSTEM: Nominal     
PLANNING         : GIS raw data on slit 1 and 3 -- quiet sun
		   NIS Spectral Atlas
		   GIS MCP Test
Comments	 : NIS Spectral Atlas succesfull
====================================================================================
DOY --  64

INSTRUMENT STATUS: Nominal      
CDS GROUND SYSTEM: Nominal     
PLANNING         : Test 6
		   possibly SYNOP(N-S sun scan with NIS)
		   Primary event on 8002782b -- OK 
====================================================================================
DOY --  65

INSTRUMENT STATUS: Nominal      
CDS GROUND SYSTEM: Nominal     
PLANNING         : Perform pointing calibration
		   Ran NISAT
		   Ran 2 rasters with SUMER
Comments	 : Low temp due to E Limb location
		   Calibration Errors on slit position - Corrected by moving it
							 slightly then back to home.
		   Studies 144-149. 
====================================================================================
DOY -- 66

INSTRUMENT STATUS: Nominal      
CDS GROUND SYSTEM: Nominal     
PLANNING         : GIS Raw data dumps
		   NIS MCP
		   NIS Spectral Atlas
		   VIEWFINDER
		   overnight
Comments	 : VIEWFINDER run at 18:40 -> study 150
		   GIS raw data dumps done prior to 18:40.
		   Overnight studies:
			VIEWF 		151
			NIMCP_1/V1	152
			NIMCP_2/V1	153
			TEST6_1/v3	154
			NISAT_S/V2	155
			TEST6_1/v3	156
			TEST6_1/V3	157
			NISAT_S/V2 	158
====================================================================================
DOY -- 67

INSTRUMENT STATUS: Nominal      
CDS GROUND SYSTEM: Nominal     
PLANNING         : JOP 039 - bad image (159)
		   instead, VIEWF - 160, ran NIS_MOVIE.
		   CRASH CDHS
Comments	 : JOP039 started and we had to end it due to bad image.
		   Started a VIEWF and NIS_MOVIE. 
====================================================================================
DOY --  68

INSTRUMENT STATUS: Nominal      
CDS GROUND SYSTEM: Nominal     
PLANNING         : Pick-up pieces from the cb9abort fiasco yesterday
		   Updated scripts in EOF database with those from RAL
		   Science plan for today:
			NISAT_S/v2	164
			EJECT study	163
		   Overnight:
			TEST6_1/v3	(3 of them w/ SUMER).
Comments	 : ran sequence 4 again w/ new scripts and everything ran fine. 
====================================================================================
DOY --  69

INSTRUMENT STATUS: Nominal      
CDS GROUND SYSTEM: Nominal     
PLANNING         :
Comments	 : GIS_SN/v1 -- had very flaky DSN contact.  
====================================================================================
DOY --  70

INSTRUMENT STATUS: Nominal      
CDS GROUND SYSTEM: Nominal     
PLANNING         : 
Comments	 : Major problems w/ see 10(QCM check)
		   Studies 175-181 run overnight. 
====================================================================================
DOY -- 71

INSTRUMENT STATUS: Nominal      
CDS GROUND SYSTEM: Nominal     
PLANNING         : Limited DSN time, run 
		   2 NIS Spectral Atlas (TEST6_1/V3)
		   1 NIS raster (NISAT/v1)
====================================================================================
DOY --  72

INSTRUMENT STATUS: Nominal      
CDS GROUND SYSTEM: Nominal     
PLANNING         : Today COBS s/w patch. Tiday, just getting data and processing
		   last night's data. Will uplink plan for tomorrow.
Comments	 : Ended upclearing the DCS in order to uplink a new plan to 
		   accomodate unexpected NRT. Plan is iuncluded here. Ignore stuff 
		   from yesterday. Fits files 186-188. 
====================================================================================
DOY -- 73

INSTRUMENT STATUS: Nominal      
CDS GROUND SYSTEM: Nominal     
PLANNING         : Continue running last night's studies.
Comments	 : Mistakenly ran cb5runs 10 --> forgot we run cpt/new. Gave a 
		   sequence error -- No problem.
		   Studies 191-196 ran; fits files were generated. 
====================================================================================
DOY -- 74 

INSTRUMENT STATUS: Nominal      
CDS GROUND SYSTEM: Nominal     
PLANNING         : Continue running things in the TTC file from yesterday. 
====================================================================================
DOY -- 75

INSTRUMENT STATUS: Nominal      
CDS GROUND SYSTEM: Nominal     
PLANNING         : Last night processed FITS files up to 218.
		   Continouing plan from 2 days ago. 
====================================================================================
DOY --  76

INSTRUMENT STATUS: Nominal      
CDS GROUND SYSTEM: Nominal     
PLANNING         : -
Comments	 : 23:05 GIS HV3 tripped. 
====================================================================================
DOY --  77

INSTRUMENT STATUS: Nominal      
CDS GROUND SYSTEM: Nominal     
PLANNING         : - 
====================================================================================
DOY --  78

INSTRUMENT STATUS: Nominal      
CDS GROUND SYSTEM: Nominal     
PLANNING         : - 
====================================================================================
DOY -- 79

INSTRUMENT STATUS: Nominal      
CDS GROUND SYSTEM: NominaL
PLANNING         : RCMP UP FOR DETECTOR 3
====================================================================================
DOY -- 80

INSTRUMENT STATUS: Nominal. Doors closed.      
CDS GROUND SYSTEM: Nominal     
PLANNING         : Trim Burn, update ICS tree. Moved slit to keep MCU backup happy.
====================================================================================
DOY -- 81

INSTRUMENT STATUS: Nominal      
CDS GROUND SYSTEM: Nominal     
PLANNING         : Dark count test for GIS. Open NIS door.
====================================================================================
DOY -- 82

INSTRUMENT STATUS: Nominal      
CDS GROUND SYSTEM: Nominal     
PLANNING         : GIS Filament data test and door open. 
====================================================================================
DOY -- 83

INSTRUMENT STATUS: Nominal      
CDS GROUND SYSTEM: Nominal     
PLANNING         : Test FLARE NIS, O_HIVEL2 NIS, ICAL_2 GIS
====================================================================================
DOY -- 84 

INSTRUMENT STATUS: Nominal      
CDS GROUND SYSTEM: Nominal     
PLANNING         : 
Comments	 : MCU Backup errors. 
====================================================================================
DOY -- 85

INSTRUMENT STATUS: Nominal      
CDS GROUND SYSTEM: Nominal     
PLANNING         : Intercal 1.
Comments	 : GIS HV 3 Tripped.
		   cpt/LOADPLAN	put an invalid command up. 
====================================================================================
DOY -- 86

INSTRUMENT STATUS: Nominal      
CDS GROUND SYSTEM: Nominal     
PLANNING         : - 
====================================================================================
DOY -- 87

INSTRUMENT STATUS: Nominal      
CDS GROUND SYSTEM: Nominal     
PLANNING         : - 
====================================================================================
DOY -- 88

INSTRUMENT STATUS: Nominal. NIS Readout mode 2      
CDS GROUND SYSTEM: Nominal     
PLANNING         : End of 50hr plan @ study #408
Comments	 : NIS AIVMCP High alarm @ 10:36 UT 5*51mA
		   AIV+5V alarms regularly during NIS sequences.
		   - added new GSET's (included)
		   - Updated VDSMODE, CBVCAM to 2 and VDSMODE to 656 in state
		     database.
====================================================================================
DOY -- 89

INSTRUMENT STATUS: Nominal      
CDS GROUND SYSTEM: Nominal     
PLANNING         : - 
====================================================================================
DOY -- 90 

INSTRUMENT STATUS: Nominal      
CDS GROUND SYSTEM: Nominal. /cs s/w update.     
PLANNING         :  -
====================================================================================
DOY -- 91

INSTRUMENT STATUS: Nominal.      
CDS GROUND SYSTEM: Nominal. 
		   Moved /sohos1 and /usr/local disk from /csi_b to TCIB - cds8.
		   Moved /ecs disk to cds9; remounted it on /cdproc on cds9.      
PLANNING         :  
Comments	 : ASVERR, ASVRGAF VDS errors detected.
====================================================================================



From the CDS Operations Management Team in the Space Science & Technology Department at CCLRC Rutherford Appleton Laboratory
Site maintained by John Rainnie.
Last revised on Tuesday (17/Jul/2001) at 09:01.