March 1999
 
==============================================================================
DATE:  01-Mar-1999
DOY: 60
OPERATIONS ENGINEER(S): R. Yurow, C. Maroney
SCIENTIST: D. Zarro
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
==============================================================================
DATE:  02-Mar-1999
DOY: 61
OPERATIONS ENGINEER(S): R. Yurow
SCIENTIST: D. Zarro
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM:
  The following studies were imported to the EOF:
	pfloops_3.def
	filobs1_4.def
	filobs2_22.def
DAY PLAN: Science Operations.
COMMENTS:
==============================================================================
DATE:  03-Mar-1999
DOY: 62
OPERATIONS ENGINEER(S): R. Yurow
SCIENTIST: D. Zarro
CDS INSTRUMENT:
  A transition to telemetry submode 6 occured at 13:00 UT
  CDS closed its doors in preparation for the spacecraft maneuver at 13:15 UT
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Close Doors, Science Operations.
COMMENTS:
==============================================================================
DATE:  04-Mar-1999
DOY: 63
OPERATIONS ENGINEER(S): R. Yurow
SCIENTIST: D. Zarro
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Thermal Monitoring.
COMMENTS:
==============================================================================
DATE:  05-Mar-1999
DOY: 64
OPERATIONS ENGINEER(S): R. Yurow
SCIENTIST: D. Zarro
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Thermal Monitoring.
COMMENTS:
==============================================================================
DATE:  06-Mar-1999
DOY: 65
OPERATIONS ENGINEER(S): R. Yurow
SCIENTIST: D. Zarro
CDS INSTRUMENT: 
  GIS closed door detector test (HV ramp up) was performed from 22:11 UT to
  23:40 UT.
  At 23:30 UT a tranisition to telemetry submode 5 occurred.
  CDS opened its doors at 00:37 UT.  
CDS GROUND SYSTEM: Nominal.
DAY PLAN: GIS Engineering, Open Doors.
COMMENTS:
==============================================================================
DATE:  07-Mar-1999
DOY: 66
OPERATIONS ENGINEER(S): R. Yurow
SCIENTIST: D. Zarro
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: 
  The following study was imported to the EOF:
       nis4w_43.def
DAY PLAN: Science Operations.
COMMENTS:
==============================================================================
DATE:  08-Mar-1999
DOY: 67
OPERATIONS ENGINEER(S): R. Yurow
SCIENTIST: N. Ranns
CDS INSTRUMENT: 
  GIS HVs were enabled at 19:34 UT to allow for further GIS testing.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
==============================================================================
DATE:  09-Mar-1999
DOY: 68
OPERATIONS ENGINEER(S): R. Yurow
SCIENTIST: N. Ranns
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
==============================================================================
DATE:  10-Mar-1999
DOY: 69
OPERATIONS ENGINEER(S): R. Yurow
SCIENTIST: N. Ranns
CDS INSTRUMENT: 
  The GIS parking voltages were reset to 2 kV on all detectors  as part of 
  futher GIS testing.  In addition, the state databasse was changed to 
  reflect the new GIS parking voltages.    
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
==============================================================================
DATE:  11-Mar-1999
DOY: 70
OPERATIONS ENGINEER(S): R. Yurow
SCIENTIST: N. Ranns
CDS INSTRUMENT:
  A lubrication study was completed at 19:24 UT.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Lubrication Study, Science Operations.
COMMENTS:
==============================================================================
DATE:  12-Mar-1999
DOY: 71
OPERATIONS ENGINEER(S): C. Maroney
SCIENTIST: N. Ranns
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
==============================================================================
DATE:  13-Mar-1999
DOY: 72
OPERATIONS ENGINEER(S): E. Donaldson
SCIENTIST: N. Ranns
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
==============================================================================
DATE:  14-Mar-1999
DOY: 73
OPERATIONS ENGINEER(S): W. Hammond
SCIENTIST: N. Ranns
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
==============================================================================
DATE:  15-Mar-1999
DOY: 74
OPERATIONS ENGINEER(S): R. Yurow
SCIENTIST: W. Thompson
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
==============================================================================
DATE:  16-Mar-1999
DOY: 75
OPERATIONS ENGINEER(S): R. Yurow
SCIENTIST: W. Thompson
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
==============================================================================
DATE:  17-Mar-1999
DOY: 76
OPERATIONS ENGINEER(S): R. Yurow
SCIENTIST: W. Thompson
CDS INSTRUMENT: 
  GIS testing on all four detectors was performed from 19:40 UT to 22:20 UT.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: GIS Engineering, Science Operations.
COMMENTS:
==============================================================================
DATE:  18-Mar-1999
DOY: 77
OPERATIONS ENGINEER(S): R. Yurow
SCIENTIST: W. Thompson
CDS INSTRUMENT: 
  A Setup Register A Failure System Error was detected on the NIS, the NIS
  NIS was reset at 18:30 UT.
  All three patches were uplinked to the GIS at 17:59.  
  As part of GIS engineering tests, the SPECT_1 study was run at 19:58 UT. 
CDS GROUND SYSTEM: Nominal.
DAY PLAN: GIS Engineering, Science Operations.
COMMENTS:
==============================================================================
DATE:  19-Mar-1999
DOY: 78
OPERATIONS ENGINEER(S): R. Yurow
SCIENTIST: W. Thompson
CDS INSTRUMENT: 
  One run of the NIS Flat Field test (FFCAL) was completed at 16:38 UT.
CDS GROUND SYSTEM: 
  The following study was imported to the EOF:
	gpromcme_44.def
DAY PLAN: FFCAL, Science Operations.
COMMENTS:
==============================================================================
DATE:  20-Mar-1999
DOY: 79
OPERATIONS ENGINEER(S): E. Donaldson
SCIENTIST: W. Thompson
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
==============================================================================
DATE:  21-Mar-1999
DOY: 80
OPERATIONS ENGINEER(S): E. Donaldson
SCIENTIST: W. Thompson
CDS INSTRUMENT: 
  A parity error was detected in the secondary (science) processor memory
  space.  The secondary processor will be rebooted when convenient.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
==============================================================================
DATE:  22-Mar-1999
DOY: 81
OPERATIONS ENGINEER(S): R. Yurow
SCIENTIST: E. Breeveld
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: 
  The fits archive disk was changed to /cdsfits24
  A software update was completed at 20:48 UT.
DAY PLAN: Science Operations.
COMMENTS:
==============================================================================
DATE:  23-Mar-1999
DOY: 82
OPERATIONS ENGINEER(S): R. Yurow, C. Maroney
SCIENTIST: E. Breeveld
CDS INSTRUMENT: 
  A telemetry submode switch to submode 6 occured at 16:04 UT.
  A parity error was detected in the primary processor memory space.  Since 
  the parity was in the Macro Support Module, an unsafe area, a processor
  reboot had to be performed.  The CDHS reboot was completed at 17:19 UT and
  normal operations resumed at 18:00 UT.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
==============================================================================
DATE:  24-Mar-1999
DOY: 83
OPERATIONS ENGINEER(S): R. Yurow, C. Maroney
SCIENTIST: E. Breeveld
CDS INSTRUMENT: 
  GIS raw dumps were performed from 15:30 UT to 20:00 UT.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: GIS Engineering, Science Operations.
COMMENTS:
==============================================================================
DATE:  25-Mar-1999
DOY: 84
OPERATIONS ENGINEER(S): R. Yurow, C. Maroney
SCIENTIST: E. Breeveld
CDS INSTRUMENT: 
  GIS raw dumps were performed from 20:00 UT to 22:30 UT.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: GIS Engineering, Science Operations.
COMMENTS:
==============================================================================
DATE:  26-Mar-1999
DOY: 85
OPERATIONS ENGINEER(S): R. Yurow, C. Maroney
SCIENTIST: E. Breeveld
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
==============================================================================
DATE:  27-Mar-1999
DOY: 86
OPERATIONS ENGINEER(S): E. Donaldson
SCIENTIST: E. Breeveld
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
==============================================================================
DATE:  28-Mar-1999
DOY: 87
OPERATIONS ENGINEER(S): W. Hammond, C. Maroney
SCIENTIST: E. Breeveld
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
==============================================================================
DATE:  29-Mar-1999
DOY: 88
OPERATIONS ENGINEER(S): R. Yurow, C. Maroney
SCIENTIST: T. Kucera
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
==============================================================================
DATE:  30-Mar-1999
DOY: 89
OPERATIONS ENGINEER(S): R. Yurow, C. Maroney
SCIENTIST: T. Kucera
CDS INSTRUMENT:
  A parity error was detected in the primary processor memory space.  Since
  the parity error is in a safe location, no reboot was necessary.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
==============================================================================
DATE:  31-Mar-1999
DOY: 90
OPERATIONS ENGINEER(S): R. Yurow, C. Maroney
SCIENTIST: T. Kucera
CDS INSTRUMENT:
  A parity error was detected in the secondary (science) processor memory
  space.  A reboot of the secondary processor will be performed when
  convenient..
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
==============================================================================



From the CDS Operations Management Team in the Space Science & Technology Department at CCLRC Rutherford Appleton Laboratory