Scientific Operations | ||
|
March 1999============================================================================== DATE: 01-Mar-1999 DOY: 60 OPERATIONS ENGINEER(S): R. Yurow, C. Maroney SCIENTIST: D. Zarro CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================== DATE: 02-Mar-1999 DOY: 61 OPERATIONS ENGINEER(S): R. Yurow SCIENTIST: D. Zarro CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: The following studies were imported to the EOF: pfloops_3.def filobs1_4.def filobs2_22.def DAY PLAN: Science Operations. COMMENTS: ============================================================================== DATE: 03-Mar-1999 DOY: 62 OPERATIONS ENGINEER(S): R. Yurow SCIENTIST: D. Zarro CDS INSTRUMENT: A transition to telemetry submode 6 occured at 13:00 UT CDS closed its doors in preparation for the spacecraft maneuver at 13:15 UT CDS GROUND SYSTEM: Nominal. DAY PLAN: Close Doors, Science Operations. COMMENTS: ============================================================================== DATE: 04-Mar-1999 DOY: 63 OPERATIONS ENGINEER(S): R. Yurow SCIENTIST: D. Zarro CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Thermal Monitoring. COMMENTS: ============================================================================== DATE: 05-Mar-1999 DOY: 64 OPERATIONS ENGINEER(S): R. Yurow SCIENTIST: D. Zarro CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Thermal Monitoring. COMMENTS: ============================================================================== DATE: 06-Mar-1999 DOY: 65 OPERATIONS ENGINEER(S): R. Yurow SCIENTIST: D. Zarro CDS INSTRUMENT: GIS closed door detector test (HV ramp up) was performed from 22:11 UT to 23:40 UT. At 23:30 UT a tranisition to telemetry submode 5 occurred. CDS opened its doors at 00:37 UT. CDS GROUND SYSTEM: Nominal. DAY PLAN: GIS Engineering, Open Doors. COMMENTS: ============================================================================== DATE: 07-Mar-1999 DOY: 66 OPERATIONS ENGINEER(S): R. Yurow SCIENTIST: D. Zarro CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: The following study was imported to the EOF: nis4w_43.def DAY PLAN: Science Operations. COMMENTS: ============================================================================== DATE: 08-Mar-1999 DOY: 67 OPERATIONS ENGINEER(S): R. Yurow SCIENTIST: N. Ranns CDS INSTRUMENT: GIS HVs were enabled at 19:34 UT to allow for further GIS testing. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================== DATE: 09-Mar-1999 DOY: 68 OPERATIONS ENGINEER(S): R. Yurow SCIENTIST: N. Ranns CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================== DATE: 10-Mar-1999 DOY: 69 OPERATIONS ENGINEER(S): R. Yurow SCIENTIST: N. Ranns CDS INSTRUMENT: The GIS parking voltages were reset to 2 kV on all detectors as part of futher GIS testing. In addition, the state databasse was changed to reflect the new GIS parking voltages. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================== DATE: 11-Mar-1999 DOY: 70 OPERATIONS ENGINEER(S): R. Yurow SCIENTIST: N. Ranns CDS INSTRUMENT: A lubrication study was completed at 19:24 UT. CDS GROUND SYSTEM: Nominal. DAY PLAN: Lubrication Study, Science Operations. COMMENTS: ============================================================================== DATE: 12-Mar-1999 DOY: 71 OPERATIONS ENGINEER(S): C. Maroney SCIENTIST: N. Ranns CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================== DATE: 13-Mar-1999 DOY: 72 OPERATIONS ENGINEER(S): E. Donaldson SCIENTIST: N. Ranns CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================== DATE: 14-Mar-1999 DOY: 73 OPERATIONS ENGINEER(S): W. Hammond SCIENTIST: N. Ranns CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================== DATE: 15-Mar-1999 DOY: 74 OPERATIONS ENGINEER(S): R. Yurow SCIENTIST: W. Thompson CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================== DATE: 16-Mar-1999 DOY: 75 OPERATIONS ENGINEER(S): R. Yurow SCIENTIST: W. Thompson CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================== DATE: 17-Mar-1999 DOY: 76 OPERATIONS ENGINEER(S): R. Yurow SCIENTIST: W. Thompson CDS INSTRUMENT: GIS testing on all four detectors was performed from 19:40 UT to 22:20 UT. CDS GROUND SYSTEM: Nominal. DAY PLAN: GIS Engineering, Science Operations. COMMENTS: ============================================================================== DATE: 18-Mar-1999 DOY: 77 OPERATIONS ENGINEER(S): R. Yurow SCIENTIST: W. Thompson CDS INSTRUMENT: A Setup Register A Failure System Error was detected on the NIS, the NIS NIS was reset at 18:30 UT. All three patches were uplinked to the GIS at 17:59. As part of GIS engineering tests, the SPECT_1 study was run at 19:58 UT. CDS GROUND SYSTEM: Nominal. DAY PLAN: GIS Engineering, Science Operations. COMMENTS: ============================================================================== DATE: 19-Mar-1999 DOY: 78 OPERATIONS ENGINEER(S): R. Yurow SCIENTIST: W. Thompson CDS INSTRUMENT: One run of the NIS Flat Field test (FFCAL) was completed at 16:38 UT. CDS GROUND SYSTEM: The following study was imported to the EOF: gpromcme_44.def DAY PLAN: FFCAL, Science Operations. COMMENTS: ============================================================================== DATE: 20-Mar-1999 DOY: 79 OPERATIONS ENGINEER(S): E. Donaldson SCIENTIST: W. Thompson CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================== DATE: 21-Mar-1999 DOY: 80 OPERATIONS ENGINEER(S): E. Donaldson SCIENTIST: W. Thompson CDS INSTRUMENT: A parity error was detected in the secondary (science) processor memory space. The secondary processor will be rebooted when convenient. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================== DATE: 22-Mar-1999 DOY: 81 OPERATIONS ENGINEER(S): R. Yurow SCIENTIST: E. Breeveld CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: The fits archive disk was changed to /cdsfits24 A software update was completed at 20:48 UT. DAY PLAN: Science Operations. COMMENTS: ============================================================================== DATE: 23-Mar-1999 DOY: 82 OPERATIONS ENGINEER(S): R. Yurow, C. Maroney SCIENTIST: E. Breeveld CDS INSTRUMENT: A telemetry submode switch to submode 6 occured at 16:04 UT. A parity error was detected in the primary processor memory space. Since the parity was in the Macro Support Module, an unsafe area, a processor reboot had to be performed. The CDHS reboot was completed at 17:19 UT and normal operations resumed at 18:00 UT. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================== DATE: 24-Mar-1999 DOY: 83 OPERATIONS ENGINEER(S): R. Yurow, C. Maroney SCIENTIST: E. Breeveld CDS INSTRUMENT: GIS raw dumps were performed from 15:30 UT to 20:00 UT. CDS GROUND SYSTEM: Nominal. DAY PLAN: GIS Engineering, Science Operations. COMMENTS: ============================================================================== DATE: 25-Mar-1999 DOY: 84 OPERATIONS ENGINEER(S): R. Yurow, C. Maroney SCIENTIST: E. Breeveld CDS INSTRUMENT: GIS raw dumps were performed from 20:00 UT to 22:30 UT. CDS GROUND SYSTEM: Nominal. DAY PLAN: GIS Engineering, Science Operations. COMMENTS: ============================================================================== DATE: 26-Mar-1999 DOY: 85 OPERATIONS ENGINEER(S): R. Yurow, C. Maroney SCIENTIST: E. Breeveld CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================== DATE: 27-Mar-1999 DOY: 86 OPERATIONS ENGINEER(S): E. Donaldson SCIENTIST: E. Breeveld CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================== DATE: 28-Mar-1999 DOY: 87 OPERATIONS ENGINEER(S): W. Hammond, C. Maroney SCIENTIST: E. Breeveld CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================== DATE: 29-Mar-1999 DOY: 88 OPERATIONS ENGINEER(S): R. Yurow, C. Maroney SCIENTIST: T. Kucera CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================== DATE: 30-Mar-1999 DOY: 89 OPERATIONS ENGINEER(S): R. Yurow, C. Maroney SCIENTIST: T. Kucera CDS INSTRUMENT: A parity error was detected in the primary processor memory space. Since the parity error is in a safe location, no reboot was necessary. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================== DATE: 31-Mar-1999 DOY: 90 OPERATIONS ENGINEER(S): R. Yurow, C. Maroney SCIENTIST: T. Kucera CDS INSTRUMENT: A parity error was detected in the secondary (science) processor memory space. A reboot of the secondary processor will be performed when convenient.. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================== From the CDS Operations Management Team in the Space Science & Technology Department at CCLRC Rutherford Appleton Laboratory Site maintained by John Rainnie. Last revised on Tuesday (17/Jul/2001) at 09:01. |