![]() |
Scientific Operations | ![]() |
|
March 1999
==============================================================================
DATE: 01-Mar-1999
DOY: 60
OPERATIONS ENGINEER(S): R. Yurow, C. Maroney
SCIENTIST: D. Zarro
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
==============================================================================
DATE: 02-Mar-1999
DOY: 61
OPERATIONS ENGINEER(S): R. Yurow
SCIENTIST: D. Zarro
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM:
The following studies were imported to the EOF:
pfloops_3.def
filobs1_4.def
filobs2_22.def
DAY PLAN: Science Operations.
COMMENTS:
==============================================================================
DATE: 03-Mar-1999
DOY: 62
OPERATIONS ENGINEER(S): R. Yurow
SCIENTIST: D. Zarro
CDS INSTRUMENT:
A transition to telemetry submode 6 occured at 13:00 UT
CDS closed its doors in preparation for the spacecraft maneuver at 13:15 UT
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Close Doors, Science Operations.
COMMENTS:
==============================================================================
DATE: 04-Mar-1999
DOY: 63
OPERATIONS ENGINEER(S): R. Yurow
SCIENTIST: D. Zarro
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Thermal Monitoring.
COMMENTS:
==============================================================================
DATE: 05-Mar-1999
DOY: 64
OPERATIONS ENGINEER(S): R. Yurow
SCIENTIST: D. Zarro
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Thermal Monitoring.
COMMENTS:
==============================================================================
DATE: 06-Mar-1999
DOY: 65
OPERATIONS ENGINEER(S): R. Yurow
SCIENTIST: D. Zarro
CDS INSTRUMENT:
GIS closed door detector test (HV ramp up) was performed from 22:11 UT to
23:40 UT.
At 23:30 UT a tranisition to telemetry submode 5 occurred.
CDS opened its doors at 00:37 UT.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: GIS Engineering, Open Doors.
COMMENTS:
==============================================================================
DATE: 07-Mar-1999
DOY: 66
OPERATIONS ENGINEER(S): R. Yurow
SCIENTIST: D. Zarro
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM:
The following study was imported to the EOF:
nis4w_43.def
DAY PLAN: Science Operations.
COMMENTS:
==============================================================================
DATE: 08-Mar-1999
DOY: 67
OPERATIONS ENGINEER(S): R. Yurow
SCIENTIST: N. Ranns
CDS INSTRUMENT:
GIS HVs were enabled at 19:34 UT to allow for further GIS testing.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
==============================================================================
DATE: 09-Mar-1999
DOY: 68
OPERATIONS ENGINEER(S): R. Yurow
SCIENTIST: N. Ranns
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
==============================================================================
DATE: 10-Mar-1999
DOY: 69
OPERATIONS ENGINEER(S): R. Yurow
SCIENTIST: N. Ranns
CDS INSTRUMENT:
The GIS parking voltages were reset to 2 kV on all detectors as part of
futher GIS testing. In addition, the state databasse was changed to
reflect the new GIS parking voltages.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
==============================================================================
DATE: 11-Mar-1999
DOY: 70
OPERATIONS ENGINEER(S): R. Yurow
SCIENTIST: N. Ranns
CDS INSTRUMENT:
A lubrication study was completed at 19:24 UT.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Lubrication Study, Science Operations.
COMMENTS:
==============================================================================
DATE: 12-Mar-1999
DOY: 71
OPERATIONS ENGINEER(S): C. Maroney
SCIENTIST: N. Ranns
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
==============================================================================
DATE: 13-Mar-1999
DOY: 72
OPERATIONS ENGINEER(S): E. Donaldson
SCIENTIST: N. Ranns
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
==============================================================================
DATE: 14-Mar-1999
DOY: 73
OPERATIONS ENGINEER(S): W. Hammond
SCIENTIST: N. Ranns
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
==============================================================================
DATE: 15-Mar-1999
DOY: 74
OPERATIONS ENGINEER(S): R. Yurow
SCIENTIST: W. Thompson
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
==============================================================================
DATE: 16-Mar-1999
DOY: 75
OPERATIONS ENGINEER(S): R. Yurow
SCIENTIST: W. Thompson
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
==============================================================================
DATE: 17-Mar-1999
DOY: 76
OPERATIONS ENGINEER(S): R. Yurow
SCIENTIST: W. Thompson
CDS INSTRUMENT:
GIS testing on all four detectors was performed from 19:40 UT to 22:20 UT.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: GIS Engineering, Science Operations.
COMMENTS:
==============================================================================
DATE: 18-Mar-1999
DOY: 77
OPERATIONS ENGINEER(S): R. Yurow
SCIENTIST: W. Thompson
CDS INSTRUMENT:
A Setup Register A Failure System Error was detected on the NIS, the NIS
NIS was reset at 18:30 UT.
All three patches were uplinked to the GIS at 17:59.
As part of GIS engineering tests, the SPECT_1 study was run at 19:58 UT.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: GIS Engineering, Science Operations.
COMMENTS:
==============================================================================
DATE: 19-Mar-1999
DOY: 78
OPERATIONS ENGINEER(S): R. Yurow
SCIENTIST: W. Thompson
CDS INSTRUMENT:
One run of the NIS Flat Field test (FFCAL) was completed at 16:38 UT.
CDS GROUND SYSTEM:
The following study was imported to the EOF:
gpromcme_44.def
DAY PLAN: FFCAL, Science Operations.
COMMENTS:
==============================================================================
DATE: 20-Mar-1999
DOY: 79
OPERATIONS ENGINEER(S): E. Donaldson
SCIENTIST: W. Thompson
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
==============================================================================
DATE: 21-Mar-1999
DOY: 80
OPERATIONS ENGINEER(S): E. Donaldson
SCIENTIST: W. Thompson
CDS INSTRUMENT:
A parity error was detected in the secondary (science) processor memory
space. The secondary processor will be rebooted when convenient.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
==============================================================================
DATE: 22-Mar-1999
DOY: 81
OPERATIONS ENGINEER(S): R. Yurow
SCIENTIST: E. Breeveld
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM:
The fits archive disk was changed to /cdsfits24
A software update was completed at 20:48 UT.
DAY PLAN: Science Operations.
COMMENTS:
==============================================================================
DATE: 23-Mar-1999
DOY: 82
OPERATIONS ENGINEER(S): R. Yurow, C. Maroney
SCIENTIST: E. Breeveld
CDS INSTRUMENT:
A telemetry submode switch to submode 6 occured at 16:04 UT.
A parity error was detected in the primary processor memory space. Since
the parity was in the Macro Support Module, an unsafe area, a processor
reboot had to be performed. The CDHS reboot was completed at 17:19 UT and
normal operations resumed at 18:00 UT.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
==============================================================================
DATE: 24-Mar-1999
DOY: 83
OPERATIONS ENGINEER(S): R. Yurow, C. Maroney
SCIENTIST: E. Breeveld
CDS INSTRUMENT:
GIS raw dumps were performed from 15:30 UT to 20:00 UT.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: GIS Engineering, Science Operations.
COMMENTS:
==============================================================================
DATE: 25-Mar-1999
DOY: 84
OPERATIONS ENGINEER(S): R. Yurow, C. Maroney
SCIENTIST: E. Breeveld
CDS INSTRUMENT:
GIS raw dumps were performed from 20:00 UT to 22:30 UT.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: GIS Engineering, Science Operations.
COMMENTS:
==============================================================================
DATE: 26-Mar-1999
DOY: 85
OPERATIONS ENGINEER(S): R. Yurow, C. Maroney
SCIENTIST: E. Breeveld
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
==============================================================================
DATE: 27-Mar-1999
DOY: 86
OPERATIONS ENGINEER(S): E. Donaldson
SCIENTIST: E. Breeveld
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
==============================================================================
DATE: 28-Mar-1999
DOY: 87
OPERATIONS ENGINEER(S): W. Hammond, C. Maroney
SCIENTIST: E. Breeveld
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
==============================================================================
DATE: 29-Mar-1999
DOY: 88
OPERATIONS ENGINEER(S): R. Yurow, C. Maroney
SCIENTIST: T. Kucera
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
==============================================================================
DATE: 30-Mar-1999
DOY: 89
OPERATIONS ENGINEER(S): R. Yurow, C. Maroney
SCIENTIST: T. Kucera
CDS INSTRUMENT:
A parity error was detected in the primary processor memory space. Since
the parity error is in a safe location, no reboot was necessary.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
==============================================================================
DATE: 31-Mar-1999
DOY: 90
OPERATIONS ENGINEER(S): R. Yurow, C. Maroney
SCIENTIST: T. Kucera
CDS INSTRUMENT:
A parity error was detected in the secondary (science) processor memory
space. A reboot of the secondary processor will be performed when
convenient..
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
==============================================================================
From the CDS Operations Management Team in the Space Science & Technology Department at CCLRC Rutherford Appleton Laboratory Site maintained by John Rainnie. Last revised on Tuesday (17/Jul/2001) at 09:01. |