Scientific Operations | ||
|
May 2000============================================================================= DATE:1-May-2000 DOY: 122 OPERATIONS ENGINEER(S): R. Yurow / C. Maroney SCIENTIST: A. Gabriel CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Observations. COMMENTS: MEDOC Campaign ============================================================================= DATE:2-May-2000 DOY: 123 OPERATIONS ENGINEER(S): R. Yurow / C. Maroney SCIENTIST: A. Gabriel CDS INSTRUMENT: A telemtry submode transition took place at 13:23 UT from submode 6 to submode 5. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Observations. COMMENTS: MEDOC Campaign ============================================================================= DATE:3-May-2000 DOY: 124 OPERATIONS ENGINEER(S): R. Yurow / C. Maroney SCIENTIST: A. Gabriel CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Observations. COMMENTS: MEDOC Campaign ============================================================================= DATE:4-May-2000 DOY: 125 OPERATIONS ENGINEER(S): R. Yurow / C. Maroney SCIENTIST: A. Gabriel CDS INSTRUMENT: Primary event error in memory location #8005a6df: Compression Module - SAFE area. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Observations. COMMENTS: MEDOC Campaign ============================================================================= DATE:5-May-2000 DOY: 126 OPERATIONS ENGINEER(S): R. Yurow / C. Maroney SCIENTIST: A. Gabriel CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Observations. COMMENTS: MEDOC Campaign ============================================================================= DATE:6-May-2000 DOY: 127 OPERATIONS ENGINEER(S): W. Hammond / E. Donaldson SCIENTIST: A. Gabriel CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Observations. COMMENTS: MEDOC Campaign ============================================================================= DATE:7-May-2000 DOY: 128 OPERATIONS ENGINEER(S): W. Hammond / E. Donaldson SCIENTIST: A. Gabriel CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Observations. COMMENTS: MEDOC Campaign ============================================================================= DATE:8-May-2000 DOY: 129 OPERATIONS ENGINEER(S): R. Yurow / C. Maroney SCIENTIST: A. Gabriel CDS INSTRUMENT: A Primary event was detected at memory location # 800783cf. Memory location is in sequence table 3. Since this is the ESR Table, it may require some action. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Observations. COMMENTS: MEDOC Campaign ============================================================================= DATE:9-May-2000 DOY: 130 OPERATIONS ENGINEER(S): R. Yurow / C. Maroney SCIENTIST: T. Fredvik CDS INSTRUMENT: The science plan was halted at 22:50 in order to perform a CDHS reboot so that the ESR (Sequence table 3) table could be reloaded. The CDHS was rebooted at 23:01 using the CB3RESET command. CDHS recovery procedures were completed at 00:06 UT (DOY 131). Science plan to restart at 02:00 UT (DOY 131). CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Observations. COMMENTS: MEDOC Campaign ============================================================================= DATE:10-May-2000 DOY: 131 OPERATIONS ENGINEER(S): R. Yurow / C. Maroney SCIENTIST: T. Fredvick CDS INSTRUMENT: A mechanism lubrication study was completed at 19:34 UT. The following studies were imported to the EOF: eject_rh_1.def sid 231 / var 1 cospev_6.def sid 15 / var 6 CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Observations. COMMENTS: MEDOC Campaign ============================================================================= DATE:11-May-2000 DOY: 132 OPERATIONS ENGINEER(S): R. Yurow / C. Maroney SCIENTIST: T. Fredvick CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Observations. COMMENTS: MEDOC Campaign ============================================================================= DATE:12-May-2000 DOY: 133 OPERATIONS ENGINEER(S): R. Yurow / C. Maroney SCIENTIST: T. Fredvick CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Observations. COMMENTS: MEDOC Campaign ============================================================================= DATE:13-May-2000 DOY: 134 OPERATIONS ENGINEER(S): E. Donaldson / C. Maroney SCIENTIST: T. Fredvick CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Contact was lost at the SOC machine at 17:25 UT. After the SOC machines were rebooted, the IWS software was restarted at 22:13 UT. Data gaps will be filled once Quicklook files arrive. DAY PLAN: Science Observations. COMMENTS: MEDOC Campaign ============================================================================= DATE:14-May-2000 DOY: 135 OPERATIONS ENGINEER(S): W. Hammond / C. Maroney SCIENTIST: T. Fredvick CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Observations. COMMENTS: MEDOC Campaign ============================================================================= DATE:15-May-2000 DOY: 136 OPERATIONS ENGINEER(S): R. Yurow / C. Maroney SCIENTIST: Spiros Patsourakos CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Observations. COMMENTS: MEDOC Campaign ============================================================================= DATE:16-May-2000 DOY: 137 OPERATIONS ENGINEER(S): R. Yurow / C. Maroney SCIENTIST: Spiros Patsourakos CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: The following studies were imported to the EOF: sp_psf_1.def tel_psf_7.def DAY PLAN: Science Observations. COMMENTS: MEDOC Campaign ============================================================================= DATE:17-May-2000 DOY: 138 OPERATIONS ENGINEER(S): R. Yurow / C. Maroney SCIENTIST: Spiros Patsourakos CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Observations. COMMENTS: MEDOC Campaign ============================================================================= DATE:18-May-2000 DOY: 139 OPERATIONS ENGINEER(S): R. Yurow / C. Maroney SCIENTIST: Spiros Patsourakos CDS INSTRUMENT: A parity error was detected in Primary Memory location #8003b207: SAFE. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Observations. COMMENTS: MEDOC Campaign ============================================================================= DATE:19-May-2000 DOY: 140 OPERATIONS ENGINEER(S): R. Yurow / C. Maroney SCIENTIST: Spiros Patsourakos CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Observations. COMMENTS: MEDOC Campaign ============================================================================= DATE:20-May-2000 DOY: 141 OPERATIONS ENGINEER(S): W. Hammond SCIENTIST: Spiros Patsourakos CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Observations. COMMENTS: MEDOC Campaign ============================================================================= DATE:21-May-2000 DOY: 142 OPERATIONS ENGINEER(S): W. Hammond SCIENTIST: Spiros Patsourakos CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Observations. COMMENTS: MEDOC Campaign ============================================================================= DATE:22-May-2000 DOY: 143 OPERATIONS ENGINEER(S): R. Yurow / C. Maroney SCIENTIST: A. Fludra CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Observations. COMMENTS: MEDOC Campaign ============================================================================= DATE:23-May-2000 DOY: 144 OPERATIONS ENGINEER(S): R. Yurow / C. Maroney SCIENTIST: A. Fludra CDS INSTRUMENT: A parity error in Primary memory location #8001579f was detected. This is in the Health Monitor module: action might need to be taken. CDS GROUND SYSTEM: A submode switch, to submode 6, occured at 17:06 UT. CDS is nominal after the submode switch. DAY PLAN: Science Observations. COMMENTS: MEDOC Campaign ============================================================================= DATE:24-May-2000 DOY: 145 OPERATIONS ENGINEER(S): R. Yurow / C. Maroney SCIENTIST: A. Fludra CDS INSTRUMENT: Normal. CDS GROUND SYSTEM: Normal. DAY PLAN: Science Observations. COMMENTS: ============================================================================= DATE:25-May-2000 DOY: 146 OPERATIONS ENGINEER(S): R. Yurow / C. Maroney SCIENTIST: A. Fludra CDS INSTRUMENT: A parity error in Secondary Memory location #8007286b was detected. A CDHS reboot is scheduled for Friday (DOY 147). CDS GROUND SYSTEM: Normal. DAY PLAN: Science Observations. COMMENTS: ============================================================================= DATE:26-May-2000 DOY: 147 OPERATIONS ENGINEER(S): R. Yurow / C. Maroney SCIENTIST: A. Fludra CDS INSTRUMENT: A mechanism lubrication study was completed at 19:16 UT. The CDHS was rebooted at 19:27 UT in order to clear the parity error in the Health Monitor Module. Recover procedures were completed at 20:31 UT and the science plan resumed at 22:36 UT. CDS GROUND SYSTEM: Normal. DAY PLAN: Science Observations. COMMENTS: ============================================================================= DATE:27-May-2000 DOY: 148 OPERATIONS ENGINEER(S): W. Hammond / E. Donaldson SCIENTIST: A. Fludra CDS INSTRUMENT: A NIS Setup Register A Failure system error occured. The NIS will be reset when convienient. CDS GROUND SYSTEM: Normal. DAY PLAN: Science Observations. COMMENTS: ============================================================================= DATE:28-May-2000 DOY: 149 OPERATIONS ENGINEER(S): W. Hammond / E. Donaldson SCIENTIST: A. Fludra CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Normal. DAY PLAN: Science Observations. COMMENTS: ============================================================================= DATE:29-May-2000 DOY: 150 OPERATIONS ENGINEER(S): R. Yurow SCIENTIST: D. Zarro CDS INSTRUMENT: The COSPEV study was interupted by SPECT_1 at 21:35 UT causing the QCM study which was to follow the COSPEV study not to be run. The study interupt was due to the predicted raster duration for the COSPEV study being shorter then the actual raster duration. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Observations. COMMENTS: ============================================================================= DATE:30-May-2000 DOY: 151 OPERATIONS ENGINEER(S): R. Yurow / C. Maroney SCIENTIST: D. Zarro CDS INSTRUMENT: The COSPEV study was interupted by EJECTV_3 at 15:37 UT causing the NISAT_S, GIMCP_1B, GIMCP_2, QCM, FULLCCD, and NIMCP studies not to be run. The study interupt was due to the predicted raster duration for the COSPEV study being shorter then the actual raster duration. CDS GROUND SYSTEM: Normal. DAY PLAN: Science Observations. COMMENTS: ============================================================================= DATE:31-May-2000 DOY: 152 OPERATIONS ENGINEER(S): R. Yurow / C. Maroney SCIENTIST: D. Zarro CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Software update was performed at 19:34 UT. DAY PLAN: Science Observations. COMMENTS: ============================================================================= From the CDS Operations Management Team in the Space Science & Technology Department at CCLRC Rutherford Appleton Laboratory Site maintained by John Rainnie. Last revised on Tuesday (17/Jul/2001) at 09:01. |