Scientific Operations | ||
|
May 2001============================================================================= DATE:01-May-2001 DOY: 121 OPERATIONS ENGINEER(S): R. Yurow / C. Maroney SCIENTIST: A. Fludra CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations COMMENTS: ============================================================================= DATE:02-May-2001 DOY: 122 OPERATIONS ENGINEER(S): R. Yurow / C. Maroney SCIENTIST: A. Fludra CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations COMMENTS: ============================================================================= DATE:03-May-2001 DOY: 123 OPERATIONS ENGINEER(S): R. Yurow / C. Maroney SCIENTIST: A. Fludra CDS INSTRUMENT: One run of FFCAL (NIS Flat Field Calibration Study) was completed at 23:58 UT. CDS GROUND SYSTEM: Nominal. DAY PLAN: FFCAL, Science Operations COMMENTS: ============================================================================= DATE:04-May-2001 DOY: 124 OPERATIONS ENGINEER(S): R. Yurow / C. Maroney SCIENTIST: A. Fludra CDS INSTRUMENT: Due to a large number of parity errors (at least 5) on the secondary (science) processor in a short space of time, the science plan was aborted at 20:17 UT and the secondary processor reset at 20:41 UT. The science plan was resumed at 21:00 UT. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations COMMENTS: ============================================================================= DATE:05-May-2001 DOY: 125 OPERATIONS ENGINEER(S): W. Hammond / B. Donaldson SCIENTIST: A. Fludra CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations COMMENTS: ============================================================================= DATE:06-May-2001 DOY: 126 OPERATIONS ENGINEER(S): W. Hammond / B. Donaldson SCIENTIST: A. Fludra CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations COMMENTS: ============================================================================= DATE:07-May-2001 DOY: 127 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: A. Fludra CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations COMMENTS: ============================================================================= DATE:08-May-2001 DOY: 128 OPERATIONS ENGINEER(S): C. Maroney SCIENTIST: A. Fludra CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations COMMENTS: ============================================================================= DATE:09-May-2001 DOY: 129 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: A. Fludra CDS INSTRUMENT: GIS detector 2 testing was conducted from 16:54 UT to 18:40 UT. Testing consisted of ramping up the detector 2 MCP voltage. At 17:40 UT, detector tripped due to CDS being pointed on disk while using slit 4. It was reset at 17:48 UT. Otherwise, the test was successful. CDS GROUND SYSTEM: Nominal. DAY PLAN: GIS Detector 2 Test, Science Operations COMMENTS: ============================================================================= DATE:10-May-2001 DOY: 130 OPERATIONS ENGINEER(S): R. Yurow / C. Maroney SCIENTIST: A. Fludra CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations COMMENTS: ============================================================================= DATE:11-May-2001 DOY: 131 OPERATIONS ENGINEER(S): R. Yurow SCIENTIST: A. Fludra CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations COMMENTS: ============================================================================= DATE:12-May-2001 DOY: 132 OPERATIONS ENGINEER(S): W. Hammond / B. Donaldson SCIENTIST: A. Fludra CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations COMMENTS: ============================================================================= DATE:13-May-2001 DOY: 133 OPERATIONS ENGINEER(S): W. Hammond / B. Donaldson SCIENTIST: A. Fludra CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations COMMENTS: ============================================================================= DATE:14-May-2001 DOY: 134 OPERATIONS ENGINEER(S): R. Yurow / C. Maroney SCIENTIST: R. Ben El Hadj CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations COMMENTS: ============================================================================= DATE:15-May-2001 DOY: 135 OPERATIONS ENGINEER(S): R. Yurow / C. Maroney SCIENTIST: R. Ben El Hadj CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations COMMENTS: ============================================================================= DATE:16-May-2001 DOY: 136 OPERATIONS ENGINEER(S): R. Yurow / C. Maroney SCIENTIST: R. Ben El Hadj CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: The command rate of the CDS instrument increased to 7 seconds as a test while loading the days plan. After the the plan was loaded, it was reset back to its nominal rate of 3 seconds. DAY PLAN: Science Operations COMMENTS: ============================================================================= DATE:17-May-2001 DOY: 137 OPERATIONS ENGINEER(S): R. Yurow / C. Maroney SCIENTIST: R. Ben El Hadj CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations COMMENTS: ============================================================================= DATE:18-May-2001 DOY: 138 OPERATIONS ENGINEER(S): R. Yurow / C. Maroney SCIENTIST: R. Ben El Hadj CDS INSTRUMENT: A mechanism lubrication was completed at 19:12 UT. CDS GROUND SYSTEM: Nominal. DAY PLAN: Lube, Science Operations COMMENTS: ============================================================================= DATE:19-May-2001 DOY: 139 OPERATIONS ENGINEER(S): W. Hammond / B. Donaldson SCIENTIST: R. Ben El Hadj CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations COMMENTS: ============================================================================= DATE:20-May-2001 DOY: 140 OPERATIONS ENGINEER(S): R. Yurow / B. Donaldson SCIENTIST: R. Ben El Hadj CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations COMMENTS: ============================================================================= DATE:21-May-2001 DOY: 141 OPERATIONS ENGINEER(S): R. Yurow / C. Maroney SCIENTIST: D. Pike CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: The command rate of the IWS software was reduced to 1 / 8 s seconds to help load the plan on DSN-27. The command rate was set back to its nominal value after the science plan was loaded. DAY PLAN: Science Operations COMMENTS: ============================================================================= DATE:22-May-2001 DOY: 142 OPERATIONS ENGINEER(S): R. Yurow / C. Maroney SCIENTIST: D. Pike CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations COMMENTS: ============================================================================= DATE:23-May-2001 DOY: 143 OPERATIONS ENGINEER(S): R. Yurow / C. Maroney SCIENTIST: D. Pike CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations COMMENTS: ============================================================================= DATE:24-May-2001 DOY: 144 OPERATIONS ENGINEER(S): R. Yurow / C. Maroney SCIENTIST: D. Pike CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations COMMENTS: ============================================================================= DATE:25-May-2001 DOY: 145 OPERATIONS ENGINEER(S): C. Maroney SCIENTIST: D. Pike CDS INSTRUMENT: The science plan was aborted at 19:45 UT in order to load a newly modified weekend that was imported after XCPT was run. The onboard tables will be deleted and new ones reloaded. Science plan will resume at 21:15 UT. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations COMMENTS: ============================================================================= DATE:26-May-2001 DOY: 146 OPERATIONS ENGINEER(S): W. Hammond / B. Donaldson SCIENTIST: D. Pike CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations COMMENTS: ============================================================================= DATE:27-May-2001 DOY: 147 OPERATIONS ENGINEER(S): W. Hammond / B. Donaldson SCIENTIST: D. Pike CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations COMMENTS: ============================================================================= DATE:28-May-2001 DOY: 148 OPERATIONS ENGINEER(S): C. Maroney / B. Donaldson SCIENTIST: R. Bentley CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations COMMENTS: ============================================================================= DATE:29-May-2001 DOY: 149 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: R. Bentley CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations COMMENTS: ============================================================================= DATE:30-May-2001 DOY: 150 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: R. Bentley CDS INSTRUMENT: Nominal. A Telemetry Submode Switch was completed at 13:22UT. CDS was Nominal through the Submode Switch (from Submode 5 to Submode 6). CDS GROUND SYSTEM: The following studies were imported to the EOF: filobs3_44.def (SID 44 / Var 54) spect_2_1.def (SID 248 / Var 1) DAY PLAN: Science Operations COMMENTS: ============================================================================= DATE:30-May-2001 DOY: 150 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: R. Bentley CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations COMMENTS: ============================================================================= From the CDS Operations Management Team in the Space Science & Technology Department at CCLRC Rutherford Appleton Laboratory Site maintained by John Rainnie. Last revised on Tuesday (17/Jul/2001) at 09:01. |