Scientific Operations | ||
|
May 2003============================================================================= DATE:1-May-2003 DOY: 121 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: A. Fludra CDS INSTRUMENT: A Mechanism Lubrication was completed at 18:45 UT. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:2-May-2003 DOY: 122 OPERATIONS ENGINEER(S): R. Yurow SCIENTIST: A. Fludra CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:3-May-2003 DOY: 123 OPERATIONS ENGINEER(S): J. Seidel SCIENTIST: A. Fludra CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:4-May-2003 DOY: 124 OPERATIONS ENGINEER(S): C. King SCIENTIST: A. Fludra CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:5-May-2003 DOY: 125 OPERATIONS ENGINEER(S): R. Yurow SCIENTIST: P. Gallagher CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: The following raster durations were changed: MERMOV rid/108 var/2 1821s - 1833s MERMOV rid/108 var/3 1821s - 1833s RAPID11 rid/228 var/1 285s - 298s MERSS rid/229 var/1 1145s - 1162s MERSSW rid/230 var/1 1164s - 1182s. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:6-May-2003 DOY: 126 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: P. Gallagher CDS INSTRUMENT: Science plan was aborted at 17:14 UT for the submode change. Science will resume at 18:00 UT. CDS GROUND SYSTEM: SOHO telemetry was lost at 00:00:39 UT. Telemetry was reaquired at 02:23 UT in low-rate. Medium rate telemetry was aquired at 03:30:04 UT. CDS appears to be Nominal at this time. A Telemetry Submode change (from 5 to 6) occurred at 17:24 UT. CDS Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:7-May-2003 DOY: 127 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: P. Gallagher CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations, Mercury Obsverations. COMMENTS: ============================================================================= DATE:8-May-2003 DOY: 128 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: P. Gallagher CDS INSTRUMENT: A parity error was detected in the Secondary (Science) Processor at address location #8007997b. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:9-May-2003 DOY: 129 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: P. Gallagher CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:10-May-2003 DOY: 130 OPERATIONS ENGINEER(S): J. Siedel SCIENTIST: P. Gallagher CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:11-May-2003 DOY: 131 OPERATIONS ENGINEER(S): C. King SCIENTIST: P. Gallagher CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:12-May-2003 DOY: 132 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: W. Thompson CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:13-May-2003 DOY: 133 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: W. Thompson CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:14-May-2003 DOY: 134 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: W. Thompson CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:15-May-2003 DOY: 135 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: W. Thompson CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: The IWS command rate was changed to 1/10s to enable commanding on DSN-27. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:16-May-2003 DOY: 136 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: W. Thompson CDS INSTRUMENT: A parity error was detected on the Secondary (Science) Processor at memory location #8006a216. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:17-May-2003 DOY: 137 OPERATIONS ENGINEER(S): C. King / R. Yurow SCIENTIST: W. Thompson CDS INSTRUMENT: A parity error was detected on the Secondary (Science) Processor at memory location #8007b9df. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:18-May-2003 DOY: 138 OPERATIONS ENGINEER(S): J. Seidel SCIENTIST: W. Thompson CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:19-May-2003 DOY: 139 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: S. Parenti CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: MEDOC Campaign ============================================================================= DATE:20-May-2003 DOY: 140 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: S. Parenti CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: MEDOC Campaign ============================================================================= DATE:21-May-2003 DOY: 141 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: S. Parenti CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: MEDOC Campaign ============================================================================= DATE:22-May-2003 DOY: 142 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: S. Parenti CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: While attempting to import the science plan from MEDOC the following error occured: ADD_PLAN: Definition overlaps with on in the Database. Importing failed on this error. Solution: Remove the CDS-SCI entries for that day and import the plan again. Reason: The CDS-SCI entry imported conflicts with one already in the DB. DAY PLAN: Science Operations. COMMENTS: MEDOC Campaign ============================================================================= DATE:23-May-2003 DOY: 143 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: S. Parenti CDS INSTRUMENT: A Mechanism Lubrication was completed at 19:50 UT. A reboot of the Secondary (Science) Processor was complete at 20:12 UT. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: MEDOC Campaign ============================================================================= DATE:24-May-2003 DOY: 144 OPERATIONS ENGINEER(S): J. Seidel SCIENTIST: S. Parenti CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: MEDOC Campaign ============================================================================= DATE:25-May-2003 DOY: 145 OPERATIONS ENGINEER(S): C. King SCIENTIST: S. Parenti CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: MEDOC Campaign ============================================================================= DATE:26-May-2003 DOY: 146 OPERATIONS ENGINEER(S): C. Maroney SCIENTIST: S. Parenti CDS INSTRUMENT: CUV-CLK violated YELLOW LOW limit (57.6 DegC) at 22:05 UT. JOP 158 was running at this time. CDS Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: MEDOC Campaign, Memorial Day (US Holiday) ============================================================================= DATE:27-May-2003 DOY: 147 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: K. Bocchialini CDS INSTRUMENT: The Emergency study was started because SYNOP was not loaded. This was an Operator error. CDS is Nominal. A VDS Setup Register A Failure was detected. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: MEDOC Campaign ============================================================================= DATE:28-May-2003 DOY: 148 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: K. Bocchialini CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: MEDOC Campaign ============================================================================= DATE:29-May-2003 DOY: 149 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: K. Bocchialini CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: The IWS command rate was changed to 1/3s. GSET 73 was imported to the EOF. DAY PLAN: Science Operations. COMMENTS: MEDOC Campaign ============================================================================= DATE:30-May-2003 DOY: 150 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: K. Bocchialini CDS INSTRUMENT: A VDS Reset was completed at 15:10 UT. A VDS Setup Register A Failure was detected (Post VDS Reset). CDS GROUND SYSTEM: A Telemetry Submode switch (to Submode 6) occured at 14:41 UT; CDS Nominal. DAY PLAN: Science Operations. COMMENTS: MEDOC Campaign ============================================================================= DATE:31-May-2003 DOY: 151 OPERATIONS ENGINEER(S): J. Seidel SCIENTIST: K. Bocchialini CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: MEDOC Campaign ============================================================================= From the CDS Operations Management Team in the Space Science & Technology Department at CCLRC Rutherford Appleton Laboratory Site maintained by John Rainnie. Last revised on Tuesday (17/Jul/2001) at 09:01. |