May 2005============================================================================= DATE: 1-May-2005 DOY: 121 OPERATIONS ENGINEER(S): R. Yurow SCIENTIST: G. Del Zanna (RAL) CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE: 2-May-2005 DOY: 122 OPERATIONS ENGINEER(S): C. Maroney SCIENTIST: P. Young (RAL) CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: The following raster duration times were changed: ARC_CALN RID/82 VAR/4 793s - 865s. DEM_GIS RID/62 VAR/2 786s - 795s. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE: 3-May-2005 DOY: 123 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: P. Young (RAL) CDS INSTRUMENT: An abort was sent at 18:55 UT (study 32553 running) to prepare CDS for a scheduled submode change at 19 UT. A parity error was detected on the Primary processor at address location #80012feb - MCU Heater Backup Module. This is considered UNSAFE and a Primary Reboot will be scheduled as soon as possible. CDS GROUND SYSTEM: A submode change (from submode 5 to 6) occured at 19:06 UT. CDS Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE: 4-May-2005 DOY: 124 OPERATIONS ENGINEER(S): C. Maroney SCIENTIST: P. Young (RAL) CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: The following study was imported to the EOF: ewgscan2_2.def. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE: 5-May-2005 DOY: 125 OPERATIONS ENGINEER(S): C. Maroney SCIENTIST: P. Young (RAL) CDS INSTRUMENT: A Full CDS Reboot was performed from 16:22 - 18:28 UT. Science plan will continue at 19:45 UT. CDS is Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE: 6-May-2005 DOY: 126 OPERATIONS ENGINEER(S): R. Yurow SCIENTIST: P. Young (RAL) CDS INSTRUMENT: A parity error was detected in the Primary processor memory space at address #8007ba67. This is in the Sequence Tables. No other actions should be required at this time. CIEG+5V violated its YELLOW High limits on DOY 125. The cause of the violation was the GIS loading lookup tables. A Mechanism Lubrication was completed at 18:16 UT. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE: 7-May-2005 DOY: 127 OPERATIONS ENGINEER(S): R. Yurow SCIENTIST: P. Young (RAL) CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE: 8-May-2005 DOY: 128 OPERATIONS ENGINEER(S): R. Yurow SCIENTIST: P. Young (RAL) CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE: 9-May-2005 DOY: 129 OPERATIONS ENGINEER(S): R. Yurow / C. Maroney SCIENTIST: R. Milligan (GSFC) CDS INSTRUMENT: A parity error in the Secondary (Science) processor memory space was detected at address #80023b5f. CDS GROUND SYSTEM: The following raster duration changes were made: HECATRG5 rid/132 var/1 4376s - 4390s. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE: 10-May-2005 DOY: 130 OPERATIONS ENGINEER(S): R. Yurow / C. Maroney SCIENTIST: R. Milligan (GSFC) CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE: 11-May-2005 DOY: 131 OPERATIONS ENGINEER(S): R. Yurow / C. Maroney SCIENTIST: R. Milligan (GSFC) CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE: 12-May-2005 DOY: 132 OPERATIONS ENGINEER(S): R. Yurow / C. Maroney SCIENTIST: R. Milligan (GSFC) CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE: 13-May-2005 DOY: 133 OPERATIONS ENGINEER(S): R. Yurow / C. Maroney SCIENTIST: R. Milligan (GSFC) CDS INSTRUMENT: At 17:23 UT, one successful run of FFCAL was completed. Due to a last minute change in the DSN schedule (end of pass at 17:55 UT), the FFCAL study was aborted at 17:45 UT to allow time to load the weekend science plan and point to next study position. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE: 14-May-2005 DOY: 134 OPERATIONS ENGINEER(S): R. Yurow SCIENTIST: R. Milligan (GSFC) CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE: 15-May-2005 DOY: 135 OPERATIONS ENGINEER(S): R. Yurow SCIENTIST: R. Milligan (GSFC) CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE: 16-May-2005 DOY: 136 OPERATIONS ENGINEER(S): C. Maroney SCIENTIST: G. Pouget (MEDOC) CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: A telemetry submode change (from 6 to 5) occured at 12:06 UT. CDS Nominal. DAY PLAN: Science Operations. COMMENTS: MEDOC Campaign ============================================================================= DATE: 17-May-2005 DOY: 137 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: G. Pouget (MEDOC) CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: The following study was imported to the EOF: gisat_2.def DAY PLAN: Science Operations. COMMENTS: MEDOC Campaign ============================================================================= DATE: 18-May-2005 DOY: 138 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: G. Pouget (MEDOC) CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: MEDOC Campaign ============================================================================= DATE: 19-May-2005 DOY: 139 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: G. Pouget (MEDOC) CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: MEDOC Campaign ============================================================================= DATE: 20-May-2005 DOY: 140 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: G. Pouget (MEDOC) CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: MEDOC Campaign ============================================================================= DATE: 21-May-2005 DOY: 141 OPERATIONS ENGINEER(S): R. Yurow SCIENTIST: G. Pouget (MEDOC) CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: MEDOC Campaign ============================================================================= DATE: 22-May-2005 DOY: 142 OPERATIONS ENGINEER(S): R. Yurow SCIENTIST: G. Pouget (MEDOC) CDS INSTRUMENT: A parity error in the secondary (Science) processor was detected at address location #80065143. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: MEDOC Campaign ============================================================================= DATE: 23-May-2005 DOY: 143 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: A. Gabriel (MEDOC) CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: MEDOC Campaign ============================================================================= DATE: 24-May-2005 DOY: 144 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: A. Gabriel (MEDOC) CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: MEDOC Campaign ============================================================================= DATE: 25-May-2005 DOY: 145 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: A. Gabriel (MEDOC) CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: MEDOC Campaign ============================================================================= DATE: 26-May-2005 DOY: 146 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: A. Gabriel (MEDOC) CDS INSTRUMENT: A VDS Setup Register A failure was detected. A parity error was detected on the secondary (Science) processor at address location #8000cf2b. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: MEDOC Campaign ============================================================================= DATE: 27-May-2005 DOY: 147 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: A. Gabriel (MEDOC) CDS INSTRUMENT: A Mechanism Lubrication was completed at 16:06 UT. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: MEDOC Campaign ============================================================================= DATE: 28-May-2005 DOY: 148 OPERATIONS ENGINEER(S): R. Yurow SCIENTIST: A. Gabriel (MEDOC) CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: MEDOC Campaign ============================================================================= DATE: 29-May-2005 DOY: 149 OPERATIONS ENGINEER(S): R. Yurow SCIENTIST: A. Gabriel (MEDOC) CDS INSTRUMENT: A parity error was detected in the primary processor memory space at address location #8004ec7f (Science Module - Safe). CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: MEDOC Campaign ============================================================================= DATE: 30-May-2005 DOY: 150 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: S. Parenti (MEDOC) CDS INSTRUMENT: A parity error was detected in the primary processor at memory space #8000ec7f (Exposure Controller - Not Safe). CTM18, CTM20, CTM21 flagged RED HIGH at about 16:15 UT. This was due to accidently including a mechanism lubrication in the plan. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: MEDOC Campaign ============================================================================= DATE: 31-May-2005 DOY: 151 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: S. Parenti (MEDOC) CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: EOF tested old data (tm.04_244_16) for a SLE test during a gap from 17:12 - 18:33 UT. The following preparations were made: - cdso8 was taken off the TLM list; - fitsgen processing was halted during the test; - RTDIS program exited (looked for current tm file) - STM was stopped (looked for current tm file) The following raster duration change was made: EFINAR_1 rid/10 var/60 3100s - 3130s. DAY PLAN: Science Operations. COMMENTS: MEDOC Campaign ============================================================================= From the CDS Operations Management Team in the Space Science & Technology Department at CCLRC Rutherford Appleton Laboratory Site maintained by John Rainnie. Last revised on Tuesday (17/Jul/2001) at 09:01. |