DATE: 1-May-2005
DOY: 121
OPERATIONS ENGINEER(S): R. Yurow
SCIENTIST: G. Del Zanna (RAL)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE: 2-May-2005
DOY: 122
OPERATIONS ENGINEER(S): C. Maroney
SCIENTIST: P. Young (RAL)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: 
  The following raster duration times were changed:
    ARC_CALN    RID/82    VAR/4    793s - 865s.
    DEM_GIS     RID/62    VAR/2    786s - 795s.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE: 3-May-2005
DOY: 123
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: P. Young (RAL)
CDS INSTRUMENT: 
  An abort was sent at 18:55 UT (study 32553 running) to prepare CDS for
a scheduled submode change at 19 UT.
  A parity error was detected on the Primary processor at address
location #80012feb - MCU Heater Backup Module.  This is considered UNSAFE
and a Primary Reboot will be scheduled as soon as possible.
CDS GROUND SYSTEM: 
  A submode change (from submode 5 to 6) occured at 19:06 UT.  CDS Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE: 4-May-2005
DOY: 124
OPERATIONS ENGINEER(S): C. Maroney
SCIENTIST: P. Young (RAL)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: 
  The following study was imported to the EOF:
    ewgscan2_2.def.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE: 5-May-2005
DOY: 125
OPERATIONS ENGINEER(S): C. Maroney
SCIENTIST: P. Young (RAL)
CDS INSTRUMENT: 
  A Full CDS Reboot was performed from 16:22 - 18:28 UT.  Science plan will
continue at 19:45 UT.  CDS is Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE: 6-May-2005
DOY: 126
OPERATIONS ENGINEER(S): R. Yurow
SCIENTIST: P. Young (RAL)
CDS INSTRUMENT: 
  A parity error was detected in the Primary processor memory space at
address #8007ba67.  This is in the Sequence Tables.  No other actions should
be required at this time.
  CIEG+5V violated its YELLOW High limits on DOY 125.  The cause of the
violation was the GIS loading lookup tables.
  A Mechanism Lubrication was completed at 18:16 UT.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE: 7-May-2005
DOY: 127
OPERATIONS ENGINEER(S): R. Yurow
SCIENTIST: P. Young (RAL)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE: 8-May-2005
DOY: 128
OPERATIONS ENGINEER(S): R. Yurow
SCIENTIST: P. Young (RAL)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE: 9-May-2005
DOY: 129
OPERATIONS ENGINEER(S): R. Yurow / C. Maroney
SCIENTIST: R. Milligan (GSFC)
CDS INSTRUMENT: 
  A parity error in the Secondary (Science) processor memory space was
detected at address #80023b5f.
CDS GROUND SYSTEM: 
  The following raster duration changes were made:
    HECATRG5    rid/132    var/1    4376s - 4390s.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE: 10-May-2005
DOY: 130
OPERATIONS ENGINEER(S): R. Yurow / C. Maroney
SCIENTIST: R. Milligan (GSFC)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE: 11-May-2005
DOY: 131
OPERATIONS ENGINEER(S): R. Yurow / C. Maroney
SCIENTIST: R. Milligan (GSFC)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE: 12-May-2005
DOY: 132
OPERATIONS ENGINEER(S): R. Yurow / C. Maroney
SCIENTIST: R. Milligan (GSFC)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE: 13-May-2005
DOY: 133
OPERATIONS ENGINEER(S): R. Yurow / C. Maroney
SCIENTIST: R. Milligan (GSFC)
CDS INSTRUMENT: 
  At 17:23 UT, one successful run of FFCAL was completed.  Due to a last
minute change in the DSN schedule (end of pass at 17:55 UT), the FFCAL study
was aborted at 17:45 UT to allow time to load the weekend science plan and 
point to next study position.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE: 14-May-2005
DOY: 134
OPERATIONS ENGINEER(S): R. Yurow
SCIENTIST: R. Milligan (GSFC)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE: 15-May-2005
DOY: 135
OPERATIONS ENGINEER(S): R. Yurow
SCIENTIST: R. Milligan (GSFC)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE: 16-May-2005
DOY: 136
OPERATIONS ENGINEER(S): C. Maroney
SCIENTIST: G. Pouget (MEDOC)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: 
  A telemetry submode change (from 6 to 5) occured at 12:06 UT.  CDS Nominal.
DAY PLAN: Science Operations.
COMMENTS: MEDOC Campaign
=============================================================================
DATE: 17-May-2005
DOY: 137
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: G. Pouget (MEDOC)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: 
  The following study was imported to the EOF:
    gisat_2.def
DAY PLAN: Science Operations.
COMMENTS: MEDOC Campaign
=============================================================================
DATE: 18-May-2005
DOY: 138
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: G. Pouget (MEDOC)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: MEDOC Campaign
=============================================================================
DATE: 19-May-2005
DOY: 139
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: G. Pouget (MEDOC)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: MEDOC Campaign
=============================================================================
DATE: 20-May-2005
DOY: 140
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: G. Pouget (MEDOC)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: MEDOC Campaign
=============================================================================
DATE: 21-May-2005
DOY: 141
OPERATIONS ENGINEER(S): R. Yurow
SCIENTIST: G. Pouget (MEDOC)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: MEDOC Campaign
=============================================================================
DATE: 22-May-2005
DOY: 142
OPERATIONS ENGINEER(S): R. Yurow
SCIENTIST: G. Pouget (MEDOC)
CDS INSTRUMENT: 
  A parity error in the secondary (Science) processor was detected at
address location #80065143.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: MEDOC Campaign
=============================================================================
DATE: 23-May-2005
DOY: 143
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: A. Gabriel (MEDOC)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: MEDOC Campaign
=============================================================================
DATE: 24-May-2005
DOY: 144
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: A. Gabriel (MEDOC)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: MEDOC Campaign
=============================================================================
DATE: 25-May-2005
DOY: 145
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: A. Gabriel (MEDOC)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: MEDOC Campaign
=============================================================================
DATE: 26-May-2005
DOY: 146
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: A. Gabriel (MEDOC)
CDS INSTRUMENT: 
  A VDS Setup Register A failure was detected.
  A parity error was detected on the secondary (Science) processor at
address location #8000cf2b.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: MEDOC Campaign
=============================================================================
DATE: 27-May-2005
DOY: 147
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: A. Gabriel (MEDOC)
CDS INSTRUMENT: 
  A Mechanism Lubrication was completed at 16:06 UT.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: MEDOC Campaign
=============================================================================
DATE: 28-May-2005
DOY: 148
OPERATIONS ENGINEER(S): R. Yurow
SCIENTIST: A. Gabriel (MEDOC)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: MEDOC Campaign
=============================================================================
DATE: 29-May-2005
DOY: 149
OPERATIONS ENGINEER(S): R. Yurow
SCIENTIST: A. Gabriel (MEDOC)
CDS INSTRUMENT: 
  A parity error was detected in the primary processor memory space
at address location #8004ec7f (Science Module - Safe).
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: MEDOC Campaign
=============================================================================
DATE: 30-May-2005
DOY: 150
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: S. Parenti (MEDOC)
CDS INSTRUMENT: 
  A parity error was detected in the primary processor at memory space
#8000ec7f (Exposure Controller - Not Safe).
  CTM18, CTM20, CTM21 flagged RED HIGH at about 16:15 UT.  This was due to
accidently including a mechanism lubrication in the plan.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: MEDOC Campaign
=============================================================================
DATE: 31-May-2005
DOY: 151
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: S. Parenti (MEDOC)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: 
  EOF tested old data (tm.04_244_16) for a SLE test during a gap from
17:12 - 18:33 UT.  The following preparations were made:
 - cdso8 was taken off the TLM list;
 - fitsgen processing was halted during the test;
 - RTDIS program exited (looked for current tm file)
 - STM was stopped (looked for current tm file)
  The following raster duration change was made:
    EFINAR_1    rid/10    var/60    3100s - 3130s.
DAY PLAN: Science Operations.
COMMENTS: MEDOC Campaign
=============================================================================