DATE: 1-May-2007
DOY: 121
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: J. Rainnie (RAL)
CDS INSTRUMENT: A primary parity error was detected at address #80023fb3 - 
IEF Controller (NOT SAFE). Memory dumps shows no corrupt memory tables.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
==============================================================================
DATE: 2-May-2007
DOY: 122
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: J. Rainnie (RAL)
CDS INSTRUMENT: A primary parity error was detected at address #8005dad3 -
Compression Module (SAFE).
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
==============================================================================
DATE: 3-May-2007
DOY: 123
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: J. Rainnie (RAL)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: The following study was imported to the EOF database:
NISAT_S6 (study_id=104/var=24).
DAY PLAN: Science Operations.
COMMENTS:
==============================================================================
DATE: 4-May-2007
DOY: 124
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: J. Rainnie (RAL)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
==============================================================================
DATE: 5-May-2007
DOY: 125
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: J. Rainnie (RAL)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
==============================================================================
DATE: 6-May-2007
DOY: 126
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: J. Rainnie (RAL)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
==============================================================================
DATE: 7-May-2007
DOY: 127
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: A. Fludra (RAL)
CDS INSTRUMENT: A primary parity error was detected at address #8007827b - 
SEQUENCE TABLES.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
==============================================================================
DATE: 8-May-2007
DOY: 128
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: A. Fludra (RAL)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
==============================================================================
DATE: 9-May-2007
DOY: 129
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: A. Fludra (RAL)
CDS INSTRUMENT: A primary parity error was detected at address #80068273 - 
Deferred Module (NOT SAFE).
A primary parity error was detected at address #8003e23b - Science Module 
(SAFE).
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
==============================================================================
DATE: 10-May-2007
DOY: 130
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: A. Fludra (RAL)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
==============================================================================
DATE: 11-May-2007
DOY: 131
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: A. Fludra (RAL)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
==============================================================================
DATE: 12-May-2007
DOY: 132
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: A. Fludra (RAL)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
==============================================================================
DATE: 13-May-2007
DOY: 133
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: A. Fludra (RAL)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
==============================================================================
DATE: 14-May-2007
DOY: 134
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: A. Fludra (RAL)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
==============================================================================
DATE: 15-May-2007
DOY: 135
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: C. Henderson (GSFC)
CDS INSTRUMENT: A primary parity error was detected at address #80068273 - 
Deferred Module.
A primary parity error was detected at address #80078276 - Sequence Tables.
A primary parity error was detected at address #80023fb7 - MCU decode.
A primary parity error was detected at address #8003e23b - Science Module
(SAFE).
A primary parity error was detected at address #8005dad3 - Compression 
Module (SAFE).
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
==============================================================================
DATE: 16-May-2007
DOY: 136
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: C. Henderson (GSFC)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
==============================================================================
DATE: 17-May-2007
DOY: 137
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: C. Henderson (GSFC)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
==============================================================================
DATE: 18-May-2007
DOY: 138
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: C. Henderson (GSFC)
CDS INSTRUMENT: A telemetry submode change from submode 6 to submode 5 
occurred at 16:00 UT. CDS is nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
==============================================================================
DATE: 19-May-2007
DOY: 139
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: C. Henderson (GSFC)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
==============================================================================
DATE: 20-May-2007
DOY: 140
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: C. Henderson (GSFC)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
==============================================================================
DATE: 21-May-2007
DOY: 141
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: C. Henderson (GSFC)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Keyhole Operations.
COMMENTS:
==============================================================================
DATE: 22-May-2007
DOY: 142
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: C. Henderson (GSFC)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Keyhole Operations.
COMMENTS:
==============================================================================
DATE: 23-May-2007
DOY: 143
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: C. Henderson (GSFC)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Keyhole Operations.
COMMENTS:
==============================================================================
DATE: 24-May-2007
DOY: 144
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: C. Henderson (GSFC)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Keyhole Operations.
COMMENTS:
==============================================================================
DATE: 25-May-2007
DOY: 145
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: C. Henderson (GSFC)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Keyhole Operations.
COMMENTS:
==============================================================================
DATE: 26-May-2007
DOY: 146
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: C. Henderson (GSFC)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Keyhole Operations.
COMMENTS:
==============================================================================
DATE: 27-May-2007
DOY: 147
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: C. Henderson (GSFC)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Keyhole Operations.
COMMENTS:
==============================================================================
DATE: 28-May-2007
DOY: 148
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: C. Henderson (GSFC)
CDS INSTRUMENT: CDS doors were CLOSED at 12:25 UT for S/C maneuvers. ESR flag
was disabled for CDS at 12:30 UT.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Keyhole Operations.
COMMENTS:
==============================================================================
DATE: 29-May-2007
DOY: 149
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: C. Henderson (GSFC)
CDS INSTRUMENT: Las burn at ~20:32 UT.
A primary parity error was detected at #8005c47f in the primary processor 
memory space - Compression Module (SAFE).
A primary memory parity error was detected at address #80057d5b - Science
Module (SAFE).
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Keyhole Operations.
COMMENTS:
==============================================================================
DATE: 30-May-2007
DOY: 150
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: C. Henderson (GSFC)
CDS INSTRUMENT: A submode change from submode 5 to submode 6 was commanded at
22:16 UT. CDS crashed after the submode change.
CDS was rebooted using ccersetn/c2cprpu2 commands at 23:07 UT. LOBT was sent
at 23:15 UT. CDS returned to STANDBY at 23:22 UT after study counter 
incremented to 36921. CDS entered READY_BOTH at 23:54 UT, however a GIS patch
reload was required. 
CDS opened doors at 23:30 UT.
CDS was added to the ESR WARNING FLAG list at ~00:00 UT DOY 151. 
GIS patches were reloaded at 00:15 UT DOY 151.
CDS recovery operations were completed at 00:40 UT DOY 151. CDS is nominal
after the recovery.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Keyhole Operations.
COMMENTS:
==============================================================================
DATE: 31-May-2007
DOY: 151
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: C. Henderson (GSFC)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Keyhole Operations.
COMMENTS:
==============================================================================