May 1996
===============================================================================
MAY 1, 1996 -- DOY 122
INSTRUMENT STATUS: Test study test6_1/v3 for raster durations
GROUND SYSTEM STATUS: nominal
PLANNING:
=====
MAY 2, 1996 -- DOY 123
INSTRUMENT STATUS: Watchdog error, CDS rebooted back to Standby. CDS was
rebooted and is now nominal
GROUND SYSTEM STATUS: nominal
PLANNING:
=====
MAY 3, 1996 -- DOY 124
INSTRUMENT STATUS: Sequence counter fiasco. The counter was accidentally
bumped up 700 or so studies. It will be left where it is
now, and studies will increment from that point on.
GROUND SYSTEM STATUS: s/w update.
PLANNING:
=====
MAY 4, 1996 -- DOY 125
INSTRUMENT STATUS: nominal
GROUND SYSTEM STATUS: nominal
PLANNING:
=====
MAY 5, 1996 -- DOY 126
INSTRUMENT STATUS: Problem after NIS engineering work in which studies were
overwritten by things that were uploaded. A couple studies
were lost in the process.
GROUND SYSTEM STATUS: nominal
PLANNING:
=====
MAY 6, 1996 -- DOY 127
INSTRUMENT STATUS: GIS raw dumps taken.
GROUND SYSTEM STATUS: nominal
PLANNING:
=====
MAY 7, 1996 -- DOY 128
INSTRUMENT STATUS: Problem with command link while loading a plan. Plan was
reloaded later.
GROUND SYSTEM STATUS: nominal
PLANNING:
=====
MAY 8, 1996 -- DOY 129
INSTRUMENT STATUS: GIS raw dumps.
GROUND SYSTEM STATUS: imported NIMCPO_1, and changed disk to /cdsd5.
PLANNING:
=====
MAY 9, 1996 -- DOY 130
INSTRUMENT STATUS: GIS raw dumps.
GROUND SYSTEM STATUS: s/w update
PLANNING:
=====
MAY 10, 1996 -- DOY 131
INSTRUMENT STATUS: GIS raw dumps. Secondary SEU - secondary rebooted, feature
tracking run.
GROUND SYSTEM STATUS: imported into EOF: chrom_n1_16, chrom_n2_1, net14,
net24, nfctr_6, scatter_1, fillfacn_10
PLANNING:
=====
MAY 11 1996 -- DOY 132
INSTRUMENT STATUS: nominal
GROUND SYSTEM STATUS: Switched ECS display to run from CDS7 instead of CDS8
PLANNING:
=====
MAY 12, 1996 -- DOY 133
INSTRUMENT STATUS: nominal
GROUND SYSTEM STATUS: nominal
PLANNING:
=====
MAY 13, 1996 -- DOY 134
INSTRUMENT STATUS: NIS engineering
GROUND SYSTEM STATUS: nominal
PLANNING:
=====
MAY 14, 1996 -- DOY 135
INSTRUMENT STATUS: Watchdog error, CDS rebooted nominally
GROUND SYSTEM STATUS: nominal
PLANNING:
=====
MAY 15, 1996 -- DOY 136
INSTRUMENT STATUS: TGRAD study tested
GROUND SYSTEM STATUS: s/w update
PLANNING:
=====
MAY 16, 1996 -- DOY 137
INSTRUMENT STATUS: nominal
GROUND SYSTEM STATUS: nominal
PLANNING:
=====
MAY 17, 1996 -- DOY 138
INSTRUMENT STATUS: doors shut for momentum management at 20:20 UT.
GROUND SYSTEM STATUS: nominal
PLANNING:
=====
MAY 18, 1996 -- DOY 139
INSTRUMENT STATUS: Doors still closed, GIS filament dumps performed, VDS door
opened at 23:45 UT.
GROUND SYSTEM STATUS: nominal
PLANNING:
=====
MAY 19, 1996 -- DOY 140
INSTRUMENT STATUS: 3 SEU's reported, 2 on primary, 1 on VDS. VDS rebooted,
GIS filament dumps done, GIS door opened at 02:10 UT.
GROUND SYSTEM STATUS: nominal
PLANNING:
=====
MAY 20, 1996 -- DOY 141
INSTRUMENT STATUS: feature tracking run again, primary rebooted due to
SEU hits the day before, rebooted nominally.
GROUND SYSTEM STATUS: DCS_edit used to edit the start of JOP002.
PLANNING:
=====
MAY 21, 1996 -- DOY 142
INSTRUMENT STATUS: TGRAD run, 90 degree spacecraft roll performed
GROUND SYSTEM STATUS: New telemtry database installed, version 5.3
PLANNING:
=====
MAY 22, 1996 -- DOY 143
INSTRUMENT STATUS: Doors shut for orbit trim at 16:00 UT, GIS filament dumps
performed.
GROUND SYSTEM STATUS: nominal
PLANNING:
=====
MAY 23, 1996 -- DOY 144
INSTRUMENT STATUS: Filament dumps completed, GIS and NIS doors opened at 00:00
UT (tomorrow).
GROUND SYSTEM STATUS: nominal
PLANNING:
=====
MAY 24, 1996 -- DOY 145
INSTRUMENT STATUS: nominal
GROUND SYSTEM STATUS: nominal
PLANNING:
=====
MAY 25, 1996 -- DOY 146
INSTRUMENT STATUS: GIS raw dumps
GROUND SYSTEM STATUS: nominal
PLANNING:
=====
MAY 26, 1996 -- DOY 147
INSTRUMENT STATUS: nominal, test of pointing to 20'.
GROUND SYSTEM STATUS: nominal
PLANNING:
=====
MAY 27, 1996 -- DOY 148
INSTRUMENT STATUS: tested lube study, secondary SEU reported.
GROUND SYSTEM STATUS: nominal
PLANNING:
=====
MAY 28, 1996 -- DOY 149
INSTRUMENT STATUS: GIS raw dumps on the off limb
GROUND SYSTEM STATUS: nominal
PLANNING:
=====
MAY 29, 1996 -- DOY 150
INSTRUMENT STATUS: test feature tracking, GIS raw dumps off limb
GROUND SYSTEM STATUS:
PLANNING:
=====
MAY 30, 1996 -- DOY 151
INSTRUMENT STATUS: nominal
GROUND SYSTEM STATUS: tar'd /cdsfits to tape, deleted files on /cdsd2, /cdsd3,
/cdsd4, /cdsr1, and /cdsr2, and added soho-arch01 to all
IWS's
PLANNING:
=====
MAY 31, 1996 -- DOY 152
INSTRUMENT STATUS: nominal
GROUND SYSTEM STATUS: nominal
PLANNING: