May 1996=============================================================================== MAY 1, 1996 -- DOY 122 INSTRUMENT STATUS: Test study test6_1/v3 for raster durations GROUND SYSTEM STATUS: nominal PLANNING: ===== MAY 2, 1996 -- DOY 123 INSTRUMENT STATUS: Watchdog error, CDS rebooted back to Standby. CDS was rebooted and is now nominal GROUND SYSTEM STATUS: nominal PLANNING: ===== MAY 3, 1996 -- DOY 124 INSTRUMENT STATUS: Sequence counter fiasco. The counter was accidentally bumped up 700 or so studies. It will be left where it is now, and studies will increment from that point on. GROUND SYSTEM STATUS: s/w update. PLANNING: ===== MAY 4, 1996 -- DOY 125 INSTRUMENT STATUS: nominal GROUND SYSTEM STATUS: nominal PLANNING: ===== MAY 5, 1996 -- DOY 126 INSTRUMENT STATUS: Problem after NIS engineering work in which studies were overwritten by things that were uploaded. A couple studies were lost in the process. GROUND SYSTEM STATUS: nominal PLANNING: ===== MAY 6, 1996 -- DOY 127 INSTRUMENT STATUS: GIS raw dumps taken. GROUND SYSTEM STATUS: nominal PLANNING: ===== MAY 7, 1996 -- DOY 128 INSTRUMENT STATUS: Problem with command link while loading a plan. Plan was reloaded later. GROUND SYSTEM STATUS: nominal PLANNING: ===== MAY 8, 1996 -- DOY 129 INSTRUMENT STATUS: GIS raw dumps. GROUND SYSTEM STATUS: imported NIMCPO_1, and changed disk to /cdsd5. PLANNING: ===== MAY 9, 1996 -- DOY 130 INSTRUMENT STATUS: GIS raw dumps. GROUND SYSTEM STATUS: s/w update PLANNING: ===== MAY 10, 1996 -- DOY 131 INSTRUMENT STATUS: GIS raw dumps. Secondary SEU - secondary rebooted, feature tracking run. GROUND SYSTEM STATUS: imported into EOF: chrom_n1_16, chrom_n2_1, net14, net24, nfctr_6, scatter_1, fillfacn_10 PLANNING: ===== MAY 11 1996 -- DOY 132 INSTRUMENT STATUS: nominal GROUND SYSTEM STATUS: Switched ECS display to run from CDS7 instead of CDS8 PLANNING: ===== MAY 12, 1996 -- DOY 133 INSTRUMENT STATUS: nominal GROUND SYSTEM STATUS: nominal PLANNING: ===== MAY 13, 1996 -- DOY 134 INSTRUMENT STATUS: NIS engineering GROUND SYSTEM STATUS: nominal PLANNING: ===== MAY 14, 1996 -- DOY 135 INSTRUMENT STATUS: Watchdog error, CDS rebooted nominally GROUND SYSTEM STATUS: nominal PLANNING: ===== MAY 15, 1996 -- DOY 136 INSTRUMENT STATUS: TGRAD study tested GROUND SYSTEM STATUS: s/w update PLANNING: ===== MAY 16, 1996 -- DOY 137 INSTRUMENT STATUS: nominal GROUND SYSTEM STATUS: nominal PLANNING: ===== MAY 17, 1996 -- DOY 138 INSTRUMENT STATUS: doors shut for momentum management at 20:20 UT. GROUND SYSTEM STATUS: nominal PLANNING: ===== MAY 18, 1996 -- DOY 139 INSTRUMENT STATUS: Doors still closed, GIS filament dumps performed, VDS door opened at 23:45 UT. GROUND SYSTEM STATUS: nominal PLANNING: ===== MAY 19, 1996 -- DOY 140 INSTRUMENT STATUS: 3 SEU's reported, 2 on primary, 1 on VDS. VDS rebooted, GIS filament dumps done, GIS door opened at 02:10 UT. GROUND SYSTEM STATUS: nominal PLANNING: ===== MAY 20, 1996 -- DOY 141 INSTRUMENT STATUS: feature tracking run again, primary rebooted due to SEU hits the day before, rebooted nominally. GROUND SYSTEM STATUS: DCS_edit used to edit the start of JOP002. PLANNING: ===== MAY 21, 1996 -- DOY 142 INSTRUMENT STATUS: TGRAD run, 90 degree spacecraft roll performed GROUND SYSTEM STATUS: New telemtry database installed, version 5.3 PLANNING: ===== MAY 22, 1996 -- DOY 143 INSTRUMENT STATUS: Doors shut for orbit trim at 16:00 UT, GIS filament dumps performed. GROUND SYSTEM STATUS: nominal PLANNING: ===== MAY 23, 1996 -- DOY 144 INSTRUMENT STATUS: Filament dumps completed, GIS and NIS doors opened at 00:00 UT (tomorrow). GROUND SYSTEM STATUS: nominal PLANNING: ===== MAY 24, 1996 -- DOY 145 INSTRUMENT STATUS: nominal GROUND SYSTEM STATUS: nominal PLANNING: ===== MAY 25, 1996 -- DOY 146 INSTRUMENT STATUS: GIS raw dumps GROUND SYSTEM STATUS: nominal PLANNING: ===== MAY 26, 1996 -- DOY 147 INSTRUMENT STATUS: nominal, test of pointing to 20'. GROUND SYSTEM STATUS: nominal PLANNING: ===== MAY 27, 1996 -- DOY 148 INSTRUMENT STATUS: tested lube study, secondary SEU reported. GROUND SYSTEM STATUS: nominal PLANNING: ===== MAY 28, 1996 -- DOY 149 INSTRUMENT STATUS: GIS raw dumps on the off limb GROUND SYSTEM STATUS: nominal PLANNING: ===== MAY 29, 1996 -- DOY 150 INSTRUMENT STATUS: test feature tracking, GIS raw dumps off limb GROUND SYSTEM STATUS: PLANNING: ===== MAY 30, 1996 -- DOY 151 INSTRUMENT STATUS: nominal GROUND SYSTEM STATUS: tar'd /cdsfits to tape, deleted files on /cdsd2, /cdsd3, /cdsd4, /cdsr1, and /cdsr2, and added soho-arch01 to all IWS's PLANNING: ===== MAY 31, 1996 -- DOY 152 INSTRUMENT STATUS: nominal GROUND SYSTEM STATUS: nominal PLANNING: From the CDS Operations Management Team in the Space Science & Technology Department at CCLRC Rutherford Appleton Laboratory Site maintained by John Rainnie. Last revised on Tuesday (17/Jul/2001) at 09:01. |