Scientific Operations | ||
|
May 1997============================================================================== DATE: 1-May-1997 DOY: 121 OPERATIONS ENGINEER(S): C. Haskell / R. Yurow SCIENTIST: L.H.-M. CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: A software update was performed at 10:10 local time. DAY PLAN: Science Operations COMMENTS: ============================================================================== DATE: 2-May-1997 DOY: 122 OPERATIONS ENGINEER(S): R. Yurow SCIENTIST: L.H.-M. CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations COMMENTS: ============================================================================== DATE: 3-May-1997 DOY: 123 OPERATIONS ENGINEER(S): R. Yurow SCIENTIST: S. V. Haugan CDS INSTRUMENT: A WATCHDOG error occured at 16:13 UT. The instrument was rebooted and recovery was completed at 19:34 UT. The recovery was nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations COMMENTS: ============================================================================== DATE: 4-May-1997 DOY: 124 OPERATIONS ENGINEER(S): C. Haskell SCIENTIST: S. V. Haugan CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations COMMENTS: ============================================================================== DATE: 5-May-1997 DOY: 125 OPERATIONS ENGINEER(S): C. Haskell / R. Yurow SCIENTIST: S. V. Haugan CDS INSTRUMENT: An SEU occured in the secondary (science) processor memory space. The secondary processor was rebooted. A lubrication study was performed. The plan failed to load due to a problem with the QCM study. The QCM study was deleted and the plan loaded nominally. CDS GROUND SYSTEM: Nominal. DAY PLAN: Lube Study, Science Operations COMMENTS: ============================================================================== DATE: 6-May-1997 DOY: 126 OPERATIONS ENGINEER(S): C. Haskell / R. Yurow SCIENTIST: S. V. Haugan CDS INSTRUMENT: A WATCHDOG error occured at 04:00 UT. The instrument was rebooted and recovery was completed at 05:33 UT. The recovery was nominal. CDS GROUND SYSTEM: Updated the following raster durations: 36/3 from 1375 to 1511 36/34 from 3064 to 3238 38/16 from 3785 to 3854 132/1 from 4263 to 4376 135/1 from 1710 to 1829 DAY PLAN: Science Operations COMMENTS: ============================================================================== DATE: 7-May-1997 DOY: 127 OPERATIONS ENGINEER(S): C. Haskell / R. Yurow SCIENTIST: S. V. Haugan CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations COMMENTS: ============================================================================== DATE: 8-May-1997 DOY: 128 OPERATIONS ENGINEER(S): C. Haskell / R. Yurow SCIENTIST: S. V. Haugan CDS INSTRUMENT: NIS Setup Register A Failure. The NIS will be rebooted Saturday. Attempt to load too large of a plan caused a BS4OVF (Command Buffer Overflow). The rest of the DCS commands will be loaded tommorow. CDS GROUND SYSTEM: The following studies were imported to the EOF: mssh_1.def treg22.def evers_3.def The lengths of the engineering study definition files engineering_1.dt and engineering_2.dt were reset to the their correct values. DAY PLAN: Science Operations COMMENTS: ============================================================================== DATE: 9-May-1997 DOY: 129 OPERATIONS ENGINEER(S): C. Haskell / R. Yurow SCIENTIST: S. V. Haugan CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations COMMENTS: ============================================================================== DATE: 10-May-1997 DOY: 130 OPERATIONS ENGINEER(S): R. Yurow SCIENTIST: A. Fludra CDS INSTRUMENT: Nominal. The NIS was reset. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations COMMENTS: ============================================================================== DATE: 11-May-1997 DOY: 131 OPERATIONS ENGINEER(S): R. Yurow SCIENTIST: A. Fludra CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations COMMENTS: ============================================================================== DATE: 12-May-1997 DOY: 132 OPERATIONS ENGINEER(S): C. Haskell / R. Yurow SCIENTIST: A. Fludra CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: A Sorftware update was performed today at 17:45 UT. DAY PLAN: Science Operations COMMENTS: ============================================================================== DATE: 13-May-1997 DOY: 133 OPERATIONS ENGINEER(S): C. Haskell / R. Yurow SCIENTIST: A. Fludra CDS INSTRUMENT: A new GIS software patch was loaded at 16:45 UT in preparation for the GIS Engineering work to performed during the rest of the week. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations COMMENTS: ============================================================================== DATE: 14-May-1997 DOY: 134 OPERATIONS ENGINEER(S): C. Haskell / R. Yurow SCIENTIST: A. Fludra CDS INSTRUMENT: A CDS WATCHDOG error occured at ~ 16:30 UT. The instrument recovery procecure was completed at 17:06 UT. The GIS instrument became corrupted (Invalid Processor Checksum). The GIS was reset and all patches reloaded. GIS Engineering was performed from 13:00 to 16:30 UT and from 22:00 to 23:00 UT. CDS GROUND SYSTEM: Nominal. DAY PLAN: GIS Engineering (raw dump activities) was performed from 12:00 to 23:00 UT, Science Operations. COMMENTS: ============================================================================== DATE: 15-May-1997 DOY: 135 OPERATIONS ENGINEER(S): C. Haskell / R. Yurow SCIENTIST: A. Fludra CDS INSTRUMENT: A plan created with the /NEW option was loaded while GISAT44S was running. This caused FSUN to begin to execute after GISAT44S (FSUN was later aborted), but otherwise had no other ill effects. CDS GROUND SYSTEM: Nominal. DAY PLAN: Woods Rocket Flight, Science Operations COMMENTS: ============================================================================== DATE: 16-May-1997 DOY: 136 OPERATIONS ENGINEER(S): C. Haskell / R. Yurow SCIENTIST: A. Fludra CDS INSTRUMENT: GIS Engineering work performed from 12:30 UT to 21:30 UT CDS GROUND SYSTEM: Nominal. DAY PLAN: GIS Engineering, Science Operations COMMENTS: ============================================================================== DATE: 17-May-1997 DOY: 137 OPERATIONS ENGINEER(S): R. Yurow SCIENTIST: W. Thompson CDS INSTRUMENT: GIS Engineering work performed from 13:53 UT to 22:44 UT A WATCHDOG error occured at ~19:00 UT. Instrument recovery procedures were completed at 20:20 UT. As part of the instrument recovery, the GIS patches were reinstalled. CDS GROUND SYSTEM: Nominal. DAY PLAN: GIS Engineering, Science Operations COMMENTS: ============================================================================== DATE: 18-May-1997 DOY: 138 OPERATIONS ENGINEER(S): R. Yurow SCIENTIST: W. Thompson CDS INSTRUMENT: A parity error was detected in the secondary (science) processor memory space. The secondary processor was rebooted. GIS Raw dumps were performed from 14:00 UT to 21:17 UT. Mistakes by the operator in commanding on station D27 forced the SYNOP study to be deleted from the plan. Other studies were courrupted. CDS GROUND SYSTEM: Nominal. DAY PLAN: GIS Engineering, Science Operations COMMENTS: ============================================================================== DATE: 19-May-1997 DOY: 139 OPERATIONS ENGINEER(S): C. Haskell / R. Yurow SCIENTIST: W. Thompson CDS INSTRUMENT: The CDS Instrument was rebooted at 14:15 UT to correct problems from the previous day. GIS Raw dumps were performed from 15:07 UT to 19:30 UT. A WATCHDOG error occured at 21:26 UT. The GIS was restarted with only the the old patch. The reboot was completed at 22:36 UT. The science plan will resume at DOY 140 00:00 UT. CDS GROUND SYSTEM: Nominal. DAY PLAN: GIS Engineering, Science Operations COMMENTS: ============================================================================== DATE: 20-May-1997 DOY: 140 OPERATIONS ENGINEER(S): C. Haskell SCIENTIST: W. Thompson CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Changed the disk to /cdsd3 DAY PLAN: Science Operations, MEDOC campaign continues. COMMENTS: ============================================================================== DATE: 21-May-1997 DOY: 141 OPERATIONS ENGINEER(S): C. Haskell / R. Yurow SCIENTIST: W. Thompson CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations, MEDOC campaign continues. COMMENTS: ============================================================================== DATE: 22-May-1997 DOY: 142 OPERATIONS ENGINEER(S): C. Haskell / R. Yurow SCIENTIST: W. Thompson CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Changed the duration for the following rasters: 10/44 6019 -> 6940 DAY PLAN: Science Operations, MEDOC campaign continues. COMMENTS: ============================================================================== DATE: 23-May-1997 DOY: 143 OPERATIONS ENGINEER(S): C. Haskell / R. Yurow SCIENTIST: W. Thompson CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations, MEDOC campaign continues. COMMENTS: ============================================================================== DATE: 24-May-1997 DOY: 144 OPERATIONS ENGINEER(S): C. Haskell SCIENTIST: C. Haskell CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations, MEDOC campaign continues. COMMENTS: ============================================================================== DATE: 25-May-1997 DOY: 145 OPERATIONS ENGINEER(S): C. Haskell SCIENTIST: C. Haskell CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations, MEDOC campaign continues. COMMENTS: ============================================================================== DATE: 26-May-1997 DOY: 146 OPERATIONS ENGINEER(S): C. Haskell SCIENTIST: C. Haskell CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: A slight problem while importing the plan from MEDOC only enabled us to load 1/2 of the day for tomorrow. DAY PLAN: Science Operations, MEDOC campaign continues. COMMENTS: ============================================================================== DATE: 26-May-1997 DOY: 146 OPERATIONS ENGINEER(S): C. Haskell SCIENTIST: C. Haskell CDS INSTRUMENT: VDS Register A setup failure - VDS will be rebooted when a convenient time is available. CDS GROUND SYSTEM: The problem that occurred yesterday regarding the import of the plan from MEDOC has been corrected. Some studies were inserted into the plan from GSFC. DAY PLAN: Science Operations, MEDOC campaign continues. COMMENTS: ============================================================================== DATE: 27-May-1997 DOY: 147 OPERATIONS ENGINEER(S): C. Haskell / R. Yurow SCIENTIST: C. Haskell CDS INSTRUMENT: VDS Setup Register A Failure. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations, MEDOC campaign continues. COMMENTS: ============================================================================== DATE: 28-May-1997 DOY: 148 OPERATIONS ENGINEER(S): C. Haskell / R. Yurow SCIENTIST: C. Haskell CDS INSTRUMENT: Parity error detected in secondary (science) processors memory space. CDS GROUND SYSTEM: Changed FITS disk to /cdsfits11 DAY PLAN: Science Operations, MEDOC campaign continues. COMMENTS: ============================================================================== DATE: 29-May-1997 DOY: 149 OPERATIONS ENGINEER(S): C. Haskell / R. Yurow SCIENTIST: C. Haskell CDS INSTRUMENT: Nominal CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations, MEDOC campaign continues. COMMENTS: ============================================================================== DATE: 30-May-1997 DOY: 150 OPERATIONS ENGINEER(S): C. Haskell / R. Yurow SCIENTIST: C. Haskell CDS INSTRUMENT: The NIS detector was reset. A lubrication study was performed. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations, MEDOC campaign continues. COMMENTS: ============================================================================== DATE: 31-May-1997 DOY: 151 OPERATIONS ENGINEER(S): A. Hammond / R. Yurow SCIENTIST: CDS INSTRUMENT: Nominal CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations, MEDOC campaign continues. COMMENTS: ============================================================================== From the CDS Operations Management Team in the Space Science & Technology Department at CCLRC Rutherford Appleton Laboratory Site maintained by John Rainnie. Last revised on Tuesday (17/Jul/2001) at 09:00. |