DATE:01-Nov-2000
DOY: 306
OPERATIONS ENGINEER(S):  R. Yurow / C. Maroney
SCIENTIST: S. Regnier
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Observations.
COMMENTS: 
=============================================================================
DATE:02-Nov-2000
DOY: 307
OPERATIONS ENGINEER(S):  C. Maroney
SCIENTIST: S. Regnier
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Observations.
COMMENTS: 
=============================================================================
DATE:03-Nov-2000
DOY: 308
OPERATIONS ENGINEER(S):  C. Maroney
SCIENTIST: S. Regnier
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Observations.
COMMENTS: 
=============================================================================
DATE:04-Nov-2000
DOY: 309
OPERATIONS ENGINEER(S):  W. Hammond / B. Donaldson
SCIENTIST: S. Regnier
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Observations.
COMMENTS: 
=============================================================================
DATE:05-Nov-2000
DOY: 310
OPERATIONS ENGINEER(S):  W. Hammond / B. Donaldson
SCIENTIST: S. Regnier
CDS INSTRUMENT: 
  CTM2 and CTM5 began flagging YELLOW HIGH on the POCC display.  BTM0, BTM1
  BTM2, BTM3, BTM4, BTM5 (the instrument front end) showed elevated 
  temperature levels.  Elevated temperature levels may be due to offpointing
  from the sun in combination with elevated spacecraft panel temperature.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Observations.
COMMENTS: 
=============================================================================
DATE:06-Nov-2000
DOY: 311
OPERATIONS ENGINEER(S):  R. Yurow
SCIENTIST: D. Pike
CDS INSTRUMENT: 
  Elevated CDS front end temperatures continue.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Observations.
COMMENTS: 
=============================================================================
DATE:07-Nov-2000
DOY: 312
OPERATIONS ENGINEER(S):  R. Yurow
SCIENTIST: D. Pike
CDS INSTRUMENT: Nominal.
  Elevated CDS front end temperatures continue.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Observations.
COMMENTS: 
=============================================================================
DATE:08-Nov-2000
DOY: 313
OPERATIONS ENGINEER(S):  R. Yurow / C. Maroney
SCIENTIST: D. Pike
CDS INSTRUMENT: Nominal.
  Elevated CDS front end temperatures continue.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Observations.
COMMENTS: 
=============================================================================
DATE:09-Nov-2000
DOY: 314
OPERATIONS ENGINEER(S):  R. Yurow / C. Maroney
SCIENTIST: D. Pike
CDS INSTRUMENT: Nominal.
  A M8 X-Ray occured at 00:00 UT along with a large CME and a proton event. 
  This caused GIS detector 1 to trip at 00:06 UT followed by detector 3
  (00:16 UT) and  detector 4 (00:18 UT).  All detectors were reset at by
  00:22 UT.
  Due to the negative impact of the proton storm on the science data, the
  science plan was aborted at 13:40 UT and the NIS high voltage disabled.  The 
  NIS was then reset at 13:49 UT in order to clear a prior error.  Following
  the NIS reset a WATCHDOG error occured at 13:53 while running cpt/UPDATE.
  Recovery operations for the WATCHDOG error began at 16:19 UT.  LOBT was 
  sent at 16:38 UT.  At 16:54 UT a transition from telemetry submode 5 to 
  telemetry submode 6.  During the transition CDS ceased responding to
  commands.  CDS was then reset at 17:12 UT.  LOBT was sent at 17:18 UT and
  recovery operations were completed at 18:11 UT.
  Two parity errors were detected in the primary processor memory space.
CDS GROUND SYSTEM:
  Change the durations of the following raster:
       Raster ID:10/ Variation: 44    old: 14500 --> new: 7000
DAY PLAN: Science Observations.
COMMENTS: 
=============================================================================
DATE:10-Nov-2000
DOY: 315
OPERATIONS ENGINEER(S):  R. Yurow / C. Maroney
SCIENTIST: D. Pike
CDS INSTRUMENT:
  A mechanism lubrication was completed at 21:13 UT.  NIS High Voltage remains
  disabled for proton storm.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Mechanism Lubrication, Monitor Temperatures
COMMENTS: 
=============================================================================
DATE:11-Nov-2000
DOY: 316
OPERATIONS ENGINEER(S):  R. Yurow / B. Donaldson
SCIENTIST: D. Pike
CDS INSTRUMENT: Nominal.
  NIS High Voltage was reenabled at 20:05 UT.  After running several tests,
  the science plan was restarted at 00:00 UT on DOY 317
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Restart Science Plan
COMMENTS: 
=============================================================================
DATE:12-Nov-2000
DOY: 317
OPERATIONS ENGINEER(S):  W. Hammond
SCIENTIST: D. Pike
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Observations.
COMMENTS: 
=============================================================================
DATE:13-Nov-2000
DOY: 318
OPERATIONS ENGINEER(S):  R. Yurow / C. Maroney
SCIENTIST: G. Del Zanna
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Observations.
COMMENTS: 
=============================================================================
DATE:14-Nov-2000
DOY: 319
OPERATIONS ENGINEER(S):  R. Yurow / C. Maroney
SCIENTIST: G. Del Zanna
CDS INSTRUMENT:
  CUVMCP flagged RED HIGH at 21:41 UT for 5 formats
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Observations.
COMMENTS: 
=============================================================================
DATE:15-Nov-2000
DOY: 320
OPERATIONS ENGINEER(S):  R. Yurow / C. Maroney
SCIENTIST: G. Del Zanna
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Observations.
COMMENTS: 
=============================================================================
DATE:16-Nov-2000
DOY: 321
OPERATIONS ENGINEER(S):  R. Yurow / C. Maroney
SCIENTIST: G. Del Zanna
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Observations.
COMMENTS: 
=============================================================================
DATE:17-Nov-2000
DOY: 322
OPERATIONS ENGINEER(S):  R. Yurow / C. Maroney
SCIENTIST: G. Del Zanna
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Observations.
COMMENTS: 
=============================================================================
DATE:18-Nov-2000
DOY: 323
OPERATIONS ENGINEER(S):  W. Hammond / B. Donaldson
SCIENTIST: G. Del Zanna
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Observations.
COMMENTS: 
=============================================================================
DATE:19-Nov-2000
DOY: 324
OPERATIONS ENGINEER(S):  W. Hammond / B. Donaldson
SCIENTIST: G. Del Zanna
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Observations.
COMMENTS: 
=============================================================================
DATE:20-Nov-2000
DOY: 325
OPERATIONS ENGINEER(S):  R. Yurow / C. Maroney
SCIENTIST: A. Fludra
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Observations.
COMMENTS: 
=============================================================================
DATE:21-Nov-2000
DOY: 326
OPERATIONS ENGINEER(S):  R. Yurow / C. Maroney
SCIENTIST: A. Fludra
CDS INSTRUMENT: 
  The science plan was aborted at 19:34 UT in order to observe a M1 class
  flare.  The science plan was resumed at 22:35 UT.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Observations.
COMMENTS: 
=============================================================================
DATE:22-Nov-2000
DOY: 327
OPERATIONS ENGINEER(S):  R. Yurow / C. Maroney
SCIENTIST: A. Fludra
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Observations.
COMMENTS: 
=============================================================================
DATE:23-Nov-2000
DOY: 328
OPERATIONS ENGINEER(S):  R. Yurow
SCIENTIST: A. Fludra
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Observations.
COMMENTS: 
=============================================================================
DATE:24-Nov-2000
DOY: 329
OPERATIONS ENGINEER(S):  R. Yurow / C. Maroney
SCIENTIST: A. Fludra
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Observations.
COMMENTS:  3 X Class solar flares occured.  CDS probably observed one or more
  of these flares. 
=============================================================================
DATE:25-Nov-2000
DOY: 330
OPERATIONS ENGINEER(S):  R. Yurow / C. Maroney
SCIENTIST: A. Fludra
CDS INSTRUMENT:
  The CDS science plan was interupted to insert serveral engineering studies
  in order to determine if there was any NIS MCP degradation caused by the
  flare observations on DOY 329.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Observations.
COMMENTS: 
=============================================================================
DATE:26-Nov-2000
DOY: 331
OPERATIONS ENGINEER(S):  W. Hammond / B. Donaldson
SCIENTIST: A. Fludra
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Observations.
COMMENTS: 
=============================================================================
DATE:27-Nov-2000
DOY: 332
OPERATIONS ENGINEER(S):  R. Yurow / C. Maroney
SCIENTIST: T. Fredvik
CDS INSTRUMENT:
  An NIS flat field calibration study (FFCAL) was completed at 21:00 UT.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Observations.
COMMENTS: 
=============================================================================
DATE:28-Nov-2000
DOY: 333
OPERATIONS ENGINEER(S):  R. Yurow / C. Maroney
SCIENTIST: T. Fredvik
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Observations.
COMMENTS: 
=============================================================================
DATE:29-Nov-2000
DOY: 334
OPERATIONS ENGINEER(S):  R. Yurow / C. Maroney
SCIENTIST: T. Fredvik
CDS INSTRUMENT:
  A S/C ESR occured at 00:19 UT after an ACU reset.  CDS is nominal in 
  STANDBY mode after the ESR with doors closed and spacecraft substition
  heaters enabled. 
  A parity error was detected in the primary processor memory space.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Thermal Monitoring.
COMMENTS: 
=============================================================================
DATE:30-Nov-2000
DOY: 335
OPERATIONS ENGINEER(S):  R. Yurow / C. Maroney
SCIENTIST: T. Fredvik
CDS INSTRUMENT:
  CDS is nominal in STANDBY mode with doors closed.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Thermal Monitoring.
COMMENTS: 
=============================================================================



From the CDS Operations Management Team in the Space Science & Technology Department at CCLRC Rutherford Appleton Laboratory
Site maintained by John Rainnie.
Last revised on Tuesday (17/Jul/2001) at 09:00.