Scientific Operations | ||
|
November 2002============================================================================= DATE:1-Nov-2002 DOY: 305 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: K. Bocchialini CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Submode Change, Science Operations. COMMENTS: MEDOC Campaign ============================================================================= DATE:2-Nov-2002 DOY: 306 OPERATIONS ENGINEER(S): C. King SCIENTIST: K. Bocchialini CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: MEDOC Campaign ============================================================================= DATE:3-Nov-2002 DOY: 307 OPERATIONS ENGINEER(S): C. King SCIENTIST: K. Bocchialini CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: MEDOC Campaign ============================================================================= DATE:4-Nov-2002 DOY: 308 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: P. Gallagher CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:5-Nov-2002 DOY: 309 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: P. Gallagher CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: IWS command rate was changed to 1/3s. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:6-Nov-2002 DOY: 310 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: P. Gallagher CDS INSTRUMENT: A NIS Register A Failure was detected. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:7-Nov-2002 DOY: 311 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: P. Gallagher CDS INSTRUMENT: A parity error was detected on the Secondary (Science) Processor at memory location #8007bc43. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:8-Nov-2002 DOY: 312 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: P. Gallagher CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:9-Nov-2002 DOY: 313 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: P. Gallagher CDS INSTRUMENT: One successful run of FFCAL (NIS Flat Field Calibration) was run between 18:00 and 19:00 UT. Because the next study after FFCAL was not time-tagged, the OPS positions had to be repositioned during the first 6 exposures of that study. Consequently, the first raster of the study in question STRE4W/v88 (Study 26213 Raster 13) was corrupted. CDS GROUND SYSTEM: Nominal. DAY PLAN: FFCAL, Science Operations. COMMENTS: ============================================================================= DATE:10-Nov-2002 DOY: 314 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: P. Gallagher CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:11-Nov-2002 DOY: 315 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: P. Gallagher CDS INSTRUMENT: A VDS Reset was completed at 19:37 UT. A Mechanism Lubrication was completed at 20:45 UT. CDS GROUND SYSTEM: The IWS command rate was changed from 1/3s to 1/10s at 21:40 UT, for commanding on DSN-27. DAY PLAN: Mechanism Lubrication, Science Operations. COMMENTS: ============================================================================= DATE:12-Nov-2002 DOY: 316 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: P. Gallagher CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:13-Nov-2002 DOY: 317 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: P. Gallagher CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:14-Nov-2002 DOY: 318 OPERATIONS ENGINEER(S): R. Yurow SCIENTIST: P. Gallagher CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:15-Nov-2002 DOY: 319 OPERATIONS ENGINEER(S): R. Yurow SCIENTIST: P. Gallagher CDS INSTRUMENT: A Secondary memory error at an unkown address and a NIS Register A Failure were detected. CDS crashed on the Telemetry Submode change at 17:05 UT. The CDHS was rebooted. Recovery procedures completed nominally at 18:24 UT. The science plan was resumed at 18:50 UT. CDS GROUND SYSTEM: A Telemetry Submode Change (from Submode 6 to 5) occured at 17:05 UT. The IWS command rate was reset to nominal rate of 1/3s at 17:21 UT for CDS recovery. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:16-Nov-2002 DOY: 320 OPERATIONS ENGINEER(S): R. Yurow / C. King SCIENTIST: P. Gallagher CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: The following studies were imported to the EOF: ser75w_1.def SID/268 Var/1 ser150w_2.def SID/254 Var/2. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:17-Nov-2002 DOY: 321 OPERATIONS ENGINEER(S): C. King SCIENTIST: P. Gallagher CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:18-Nov-2002 DOY: 322 OPERATIONS ENGINEER(S): R. Yurow SCIENTIST: T. Kucera CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:19-Nov-2002 DOY: 323 OPERATIONS ENGINEER(S): R. Yurow SCIENTIST: T. Kucera CDS INSTRUMENT: A NIS Register A Failure System error was detected. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:20-Nov-2002 DOY: 324 OPERATIONS ENGINEER(S): R. Yurow SCIENTIST: T. Kucera CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:21-Nov-2002 DOY: 325 OPERATIONS ENGINEER(S): R. Yurow SCIENTIST: T. Kucera CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:22-Nov-2002 DOY: 326 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: T. Kucera CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: A Telemetry Submode Change (from Submode 5 to 6) occured at 17:05 UT. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:23-Nov-2002 DOY: 327 OPERATIONS ENGINEER(S): C. King SCIENTIST: T. Kucera CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:24-Nov-2002 DOY: 328 OPERATIONS ENGINEER(S): C. King SCIENTIST: T. Kucera CDS INSTRUMENT: A Parity error on the Primary Processor was detected at memory location #80052ff3. This is in the Compression Module: SAFE. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:25-Nov-2002 DOY: 329 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: J. Ireland CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Due to high winds at DSN-16, antennas were stowed away before SOHO could be put into record. Data lost from 14:32 - 15:08 UT. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:26-Nov-2002 DOY: 330 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: J. Ireland CDS INSTRUMENT: A parity error was detected in the Primary Processor at memory location #80052fb3 - Science Module (SAFE). CDS GROUND SYSTEM: The IWS command rate was changed to 1/10s for commanding on DSN-27. The following raster duration was changed: GENE rid/11 var/99 2280s - 2288s DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:27-Nov-2002 DOY: 331 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: J. Ireland CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:28-Nov-2002 DOY: 332 OPERATIONS ENGINEER(S): C. Maroney (On Call) SCIENTIST: J. Ireland CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: Thanksgiving (U.S.) Holiday ============================================================================= DATE:29-Nov-2002 DOY: 333 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: J. Ireland CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:30-Nov-2002 DOY: 334 OPERATIONS ENGINEER(S): C. King SCIENTIST: J. Ireland CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= From the CDS Operations Management Team in the Space Science & Technology Department at CCLRC Rutherford Appleton Laboratory Site maintained by John Rainnie. Last revised on Tuesday (17/Jul/2001) at 09:00. |