November 2002
 
=============================================================================
DATE:1-Nov-2002
DOY: 305
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: K. Bocchialini
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Submode Change, Science Operations.
COMMENTS: MEDOC Campaign
=============================================================================
DATE:2-Nov-2002
DOY: 306
OPERATIONS ENGINEER(S): C. King
SCIENTIST: K. Bocchialini
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: MEDOC Campaign
=============================================================================
DATE:3-Nov-2002
DOY: 307
OPERATIONS ENGINEER(S): C. King
SCIENTIST: K. Bocchialini
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: MEDOC Campaign
=============================================================================
DATE:4-Nov-2002
DOY: 308
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: P. Gallagher
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:5-Nov-2002
DOY: 309
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: P. Gallagher
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: 
  IWS command rate was changed to 1/3s.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:6-Nov-2002
DOY: 310
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: P. Gallagher
CDS INSTRUMENT: 
  A NIS Register A Failure was detected.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:7-Nov-2002
DOY: 311
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: P. Gallagher
CDS INSTRUMENT: 
  A parity error was detected on the Secondary (Science) Processor at memory
location #8007bc43.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:8-Nov-2002
DOY: 312
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: P. Gallagher
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:9-Nov-2002
DOY: 313
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: P. Gallagher
CDS INSTRUMENT: 
  One successful run of FFCAL (NIS Flat Field Calibration) was run between
18:00 and 19:00 UT.  Because the next study after FFCAL was not time-tagged, 
the OPS positions had to be repositioned during the first 6 exposures of 
that study.  Consequently, the first raster of the study in question 
STRE4W/v88 (Study 26213 Raster 13) was corrupted.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: FFCAL, Science Operations.
COMMENTS: 
=============================================================================
DATE:10-Nov-2002
DOY: 314
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: P. Gallagher
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:11-Nov-2002
DOY: 315
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: P. Gallagher
CDS INSTRUMENT: 
  A VDS Reset was completed at 19:37 UT.
  A Mechanism Lubrication was completed at 20:45 UT.
CDS GROUND SYSTEM: 
  The IWS command rate was changed from 1/3s to 1/10s at 21:40 UT, for 
commanding on DSN-27.
DAY PLAN: Mechanism Lubrication, Science Operations.
COMMENTS: 
=============================================================================
DATE:12-Nov-2002
DOY: 316
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: P. Gallagher
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:13-Nov-2002
DOY: 317
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: P. Gallagher
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:14-Nov-2002
DOY: 318
OPERATIONS ENGINEER(S): R. Yurow
SCIENTIST: P. Gallagher
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:15-Nov-2002
DOY: 319
OPERATIONS ENGINEER(S): R. Yurow
SCIENTIST: P. Gallagher
CDS INSTRUMENT: 
  A Secondary memory error at an unkown address and a NIS Register A Failure
were detected.
  CDS crashed on the Telemetry Submode change at 17:05 UT.  The CDHS was
rebooted.  Recovery procedures completed nominally at 18:24 UT.  The science
plan was resumed at 18:50 UT.
CDS GROUND SYSTEM: 
  A Telemetry Submode Change (from Submode 6 to 5) occured at 17:05 UT.
  The IWS command rate was reset to nominal rate of 1/3s at 17:21 UT for CDS
recovery.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:16-Nov-2002
DOY: 320
OPERATIONS ENGINEER(S): R. Yurow / C. King
SCIENTIST: P. Gallagher
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: 
  The following studies were imported to the EOF:
ser75w_1.def    SID/268    Var/1
ser150w_2.def   SID/254    Var/2.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:17-Nov-2002
DOY: 321
OPERATIONS ENGINEER(S): C. King
SCIENTIST: P. Gallagher
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:18-Nov-2002
DOY: 322
OPERATIONS ENGINEER(S): R. Yurow
SCIENTIST: T. Kucera
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:19-Nov-2002
DOY: 323
OPERATIONS ENGINEER(S): R. Yurow
SCIENTIST: T. Kucera
CDS INSTRUMENT: 
  A NIS Register A Failure System error was detected.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:20-Nov-2002
DOY: 324
OPERATIONS ENGINEER(S): R. Yurow
SCIENTIST: T. Kucera
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:21-Nov-2002
DOY: 325
OPERATIONS ENGINEER(S): R. Yurow
SCIENTIST: T. Kucera
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:22-Nov-2002
DOY: 326
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: T. Kucera
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: 
  A Telemetry Submode Change (from Submode 5 to 6) occured at 17:05 UT.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:23-Nov-2002
DOY: 327
OPERATIONS ENGINEER(S): C. King
SCIENTIST: T. Kucera
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:24-Nov-2002
DOY: 328
OPERATIONS ENGINEER(S): C. King
SCIENTIST: T. Kucera
CDS INSTRUMENT: 
  A Parity error on the Primary Processor was detected at memory location
#80052ff3.  This is in the Compression Module: SAFE.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:25-Nov-2002
DOY: 329
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: J. Ireland
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: 
  Due to high winds at DSN-16, antennas were stowed away before SOHO could
be put into record.  Data lost from 14:32 - 15:08 UT.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:26-Nov-2002
DOY: 330
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: J. Ireland
CDS INSTRUMENT: 
  A parity error was detected in the Primary Processor at memory location
#80052fb3 - Science Module (SAFE).
CDS GROUND SYSTEM:
  The IWS command rate was changed to 1/10s for commanding on DSN-27. 
  The following raster duration was changed:
GENE   rid/11    var/99    2280s - 2288s
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:27-Nov-2002
DOY: 331
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: J. Ireland
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:28-Nov-2002
DOY: 332
OPERATIONS ENGINEER(S): C. Maroney (On Call)
SCIENTIST: J. Ireland
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: Thanksgiving (U.S.) Holiday
=============================================================================
DATE:29-Nov-2002
DOY: 333
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: J. Ireland
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:30-Nov-2002
DOY: 334
OPERATIONS ENGINEER(S): C. King
SCIENTIST: J. Ireland
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================



From the CDS Operations Management Team in the Space Science & Technology Department at CCLRC Rutherford Appleton Laboratory
Site maintained by John Rainnie.
Last revised on Tuesday (17/Jul/2001) at 09:00.