November 2003
 
=============================================================================
DATE:1-Nov-2003
DOY: 305
OPERATIONS ENGINEER(S): J. Seidel / C. King
SCIENTIST: J. Ireland
CDS INSTRUMENT: Nominal. 
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:2-Nov-2003
DOY: 306
OPERATIONS ENGINEER(S): R. Yurow
SCIENTIST: J. Ireland
CDS INSTRUMENT: 
  A parity error was detected in the Secondary (Science) Processor at
address #80067cff. 
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:3-Nov-2003
DOY: 307
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: P. Young (RAL)
CDS INSTRUMENT: 
  Due to an over-site (on Friday), the weekend science plan ended at 00:00 UT
(DOY 307) and the Emergency study was started at 01:00 UT.  At 14:45 UT, the
Emergency study was aborted and a modified science plan was loaded to start
at 15:40 UT.
  At 16:03 UT, CUV+CLK violated Yellow High limit (at 13.5168) and returned
to a nominal state (13.48) at 16:05 UT.  FLARE_AR/v9 (Oslo study) was running
at this time.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:4-Nov-2003
DOY: 308
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: P. Young (RAL)
CDS INSTRUMENT: 
  At 19:48 UT, an enormous Xflare occured.  CDS was observing with the GIS
at the time.  GIS Detector 2 tripped at 19:52 UT, then GIS Detector 1 at
19:55 UT.  Operator contacted Jeff Payne at home.  While explaining the
events GIS Detector 3 tripped at 20:15 UT.  Because of a station hand-over and
station problems (on the next station) GIS Detectors 1, 2 & 3 remained
safed.  Detector 4 raw counts peaked at 12,000 counts, but later subsided.
  GIS Detectors 1, 2 & 3 were recovered to parking voltages at 22:06 UT.
  GIS Detector 3 HV was set to its operational level (0xC6) at 22:30 UT.
  GIS Detector 2 HV was set to its operational level (0xCB) at 22:33 UT.
  GIS Detector 1 HV was set to its operational level (0xCD) at 22:42 UT.
  GIS study (o_loop) is due to end at 23:40 UT.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:5-Nov-2003
DOY: 309
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: P. Young (RAL)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: 
  The following study was imported to the EOF:
    ffcal_5_1.def
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:6-Nov-2003
DOY: 310
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: P. Young (RAL)
CDS INSTRUMENT: 
  A new version of FFCAL (FFCAL/v5) was run successfully (for 100 min) over
both sides of the sun (X).  The script was modified to run twice to make use
of the remaining time the study was running.  The study ended and script
aborted at 17:48 UT.
  A Mechanism Lubrication was completed at 19:03 UT.
CDS GROUND SYSTEM: 
  At ~1:00 UT, cdso9 failed.  In the morning, George Dimitoglou contacted
HP to service cdso9.  A technician arrived from HP early and replaced the
power supply.  At 18:55 UT, cdso9 was up and operational.  Power supply 
failure was perhaps caused by local lightning storm at GSFC.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:7-Nov-2003
DOY: 311
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: P. Young (RAL)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: 
  A Software Update was successfully completed from RAL.
  At ~23:00 UT, The EOF Network problems occured and stopped the distribution
of telemetry files to CDS (and all SOHO instruments teams).  Telemetry is
being stored in the FOT (and level 0).  Network problem is being worked out.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:8-Nov-2003
DOY: 312
OPERATIONS ENGINEER(S): J. Seidel / C. King
SCIENTIST: P. Young (RAL)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: 
  EOF telemetry network is still down, problem still being resolved.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:9-Nov-2003
DOY: 313
OPERATIONS ENGINEER(S): J. Seidel / C. King
SCIENTIST: P. Young (RAL)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM:
  The network is back up and running as of this morning.  .REL files were
imported to the EOF and fits files for this gap are being processed.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:10-Nov-2003
DOY: 314
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: S. Chapman, B. Bromage, M. Marsh (RAL)
CDS INSTRUMENT: 
  A parity error was detected on the Primary Processor at memory location
#80071913: This is in Unused Memory.
  Two parity errors were detected on the Secondary (Science) Processor at
memory location #80076cdb and #8000a93b.
CDS GROUND SYSTEM: 
  Tuesdays plan was imported and XCPT was run.  MK_PLAN crashed (what
appeared to be lack of table space).  XCPT was run again over less time with
the same result.  Operator contacted Andrzej Fludra to review the imported
plan.  Andrzej reviewed the plan didn't see anything unusual.  Operator
contacted Dominic Zarro and sent him error message.  The problem was found
in XCPT with the engineering study QCM.  The study was removed and the plan
was run and loaded successfully.  The problem is being reviewed by Dominic
and Ron Yurow.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:11-Nov-2003
DOY: 315
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: S. Chapman, B. Bromage, M. Marsh (RAL)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM:
  The followin study was imported to the EOF:
    uclan_mv_2.def
  XCPT was patched from yesterdays problems with QCM.
DAY PLAN: Science Operations.
COMMENTS: Veterans Day (US Holiday)
=============================================================================
DATE:12-Nov-2003
DOY: 316
OPERATIONS ENGINEER(S): C. Maroney
SCIENTIST: S. Chapman, B. Bromage, M. Marsh (RAL)
CDS INSTRUMENT: 
  A VDS Setup Register A Failure was detected.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:13-Nov-2003
DOY: 317
OPERATIONS ENGINEER(S): C. Maroney
SCIENTIST: S. Chapman, B. Bromage, M. Marsh (RAL)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: 
  The following studies were imported to the EOF:
    pouget_2_68.def
    pouget_4_108.def
  The following raster duration change was made:
    FFCAL_5    rid/237    var/1    6000s - 6321s
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:14-Nov-2003
DOY: 318
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: S. Chapman, B. Bromage, M. Marsh (RAL)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: 
  At 21:15 UT, CDS initiated a submode change (from submode 6 to submode 5)
for upcoming MEDOC Campaign with SUMER observing.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:15-Nov-2003
DOY: 319
OPERATIONS ENGINEER(S): J. Seidel / C. King
SCIENTIST: S. Chapman, B. Bromage, M. Marsh (RAL)
CDS INSTRUMENT: 
  A parity error at address #800685e7 was detected in the primary processor
memory space.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:16-Nov-2003
DOY: 320
OPERATIONS ENGINEER(S): J. Seidel / C. King
SCIENTIST: S. Chapman, B. Bromage, M. Marsh (RAL)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:17-Nov-2003
DOY: 321
OPERATIONS ENGINEER(S): R. Yurow
SCIENTIST: S. Parenti (MEDOC)
CDS INSTRUMENT: 
  A CDS reboot began at 21:35 UT.  CDS was brought down to SNOOZE mode at
21:59 UT.  The CDHS was reset by sending the CB3RESET command.  The LOBT was
sent at 22:02 UT.  At 22:42 UT, CDS was brought back up to READY_BOTH and
Science Operations were resumed at 00:00 UT (DOY 321). CDS Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: MEDOC Campaign
=============================================================================
DATE:18-Nov-2003
DOY: 322
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: S. Parenti (MEDOC)
CDS INSTRUMENT: 
  Due to station problems on DSN-27, the science plan had to be retransmitted
several times.  Ground sation switched over to their backup uplink system
and the load was uplinked successfully.
CDS GROUND SYSTEM: 
  The following raster duration changes were made:
    UCLAN_N4    rid/ 11    var/84    3225s - 3260s
    LOOP2D_5    rid/ 31    var/ 8      44s -   55s
    MICEV       rid/ 31    var/ 9      74s -   85s
    HTGIWE      rid/177    var/ 1    2089s - 2100s
DAY PLAN: Science Operations.
COMMENTS: MEDOC Campaign
=============================================================================
DATE:19-Nov-2003
DOY: 323
OPERATIONS ENGINEER(S): R. Yurow
SCIENTIST: S. Parenti (MEDOC)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: MEDOC Campaign
=============================================================================
DATE:20-Nov-2003
DOY: 324
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: S. Parenti (MEDOC)
CDS INSTRUMENT: 
  A Setup VDS Register A Failure was detected.
CDS GROUND SYSTEM: 
  The command interval on the IWS was set to 1/10s at 01:38 UT to enable
commanding on the station with degraded telemetry.
  The following studies were imported to the EOF:
    pouget_1_8.def
    pouget_3_5.def
DAY PLAN: Science Operations.
COMMENTS: MEDOC Campaign
=============================================================================
DATE:21-Nov-2003
DOY: 325
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: S. Parenti (MEDOC)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: MEDOC Campaign
=============================================================================
DATE:22-Nov-2003
DOY: 326
OPERATIONS ENGINEER(S): J. Seidel / C. King
SCIENTIST: S. Parenti (MEDOC)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: MEDOC Campaign
=============================================================================
DATE:23-Nov-2003
DOY: 327
OPERATIONS ENGINEER(S): J. Seidel / C. King
SCIENTIST: S. Parenti (MEDOC)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: MEDOC Campaign
=============================================================================
DATE:24-Nov-2003
DOY: 328
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: S. Parenti / G. Pouget (MEDOC)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: MEDOC Campaign
=============================================================================
DATE:25-Nov-2003
DOY: 329
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: S. Parenti / G. Pouget (MEDOC)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: MEDOC Campaign
=============================================================================
DATE:26-Nov-2003
DOY: 330
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: S. Parenti / G. Pouget (MEDOC)
CDS INSTRUMENT: 
  A Mechanism Lubrication was completed at 20:00 UT.
  A VDS Reset was completed at 20:20 UT.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: MEDOC Campaign
=============================================================================
DATE:27-Nov-2003
DOY: 331
OPERATIONS ENGINEER(S): R. Yurow
SCIENTIST: S. Parenti / G. Pouget (MEDOC)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: MEDOC Campaign, Thanksgiving (US Holiday)
=============================================================================
DATE:28-Nov-2003
DOY: 332
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: S. Parenti / G. Pouget (MEDOC)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: 
  The following raster duration changes were made:
    POUGET_3    rid/104  var/5    601s -  625s
    FLARE_AR    rid/140  var/9    690s -  698s
    VARDYN3     rid/233  var/1    310s -  321s
    VARDYN4     rid/234  var/1   2200s - 2222s
DAY PLAN: Science Operations.
COMMENTS: MEDOC Campaign
=============================================================================
DATE:29-Nov-2003
DOY: 333
OPERATIONS ENGINEER(S): J. Seidel / C. King
SCIENTIST: S. Parenti / G. Pouget (MEDOC)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: MEDOC Campaign
=============================================================================
DATE:30-Nov-2003
DOY: 334
OPERATIONS ENGINEER(S): J. Seidel / C. King
SCIENTIST: S. Parenti / G. Pouget (MEDOC)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: MEDOC Campaign
=============================================================================