![]() |
Scientific Operations | ![]() |
|
November 2008
==============================================================================
DATE: 01-Nov-2008
DOY: 306
OPERATIONS ENGINEER(S): R. Yurow / N. Cheung
SCIENTIST: Andrzej Fludra (RAL)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
==============================================================================
DATE: 02-Nov-2008
DOY: 307
OPERATIONS ENGINEER(S): R. Yurow / N. Cheung
SCIENTIST: Andrzej Fludra (RAL)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
==============================================================================
DATE: 03-Nov-2008
DOY: 308
OPERATIONS ENGINEER(S): R. Yurow / N. Cheung
SCIENTIST: Andrzej Fludra (RAL)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
==============================================================================
DATE: 04-Nov-2008
DOY: 309
OPERATIONS ENGINEER(S): R. Yurow / N. Cheung
SCIENTIST: Barry Kellett (RAL)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
==============================================================================
DATE: 05-Nov-2008
DOY: 310
OPERATIONS ENGINEER(S): R. Yurow / N. Cheung
SCIENTIST: Barry Kellett (RAL)
CDS INSTRUMENT:
A parity error was detected in the secondary processor memory
address space at address #800568bf
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: Keyhole Operations 5-Nov-2008 thru 23-Aug-2008
==============================================================================
DATE: 06-Nov-2008
DOY: 311
OPERATIONS ENGINEER(S): R. Yurow / N. Cheung
SCIENTIST: Barry Kellett (RAL)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: Keyhole Operations 5-Nov-2008 thru 23-Aug-2008
==============================================================================
DATE: 07-Nov-2008
DOY: 312
OPERATIONS ENGINEER(S): R. Yurow / N. Cheung
SCIENTIST: Barry Kellett (RAL)
CDS INSTRUMENT:
A submode transition from submode 6 to submode 5 was requested at
14:35 UT, CDS is nominal after the submode transition.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Submode Change. Science Operations.
COMMENTS: Keyhole Operations 5-Nov-2008 thru 23-Aug-2008
==============================================================================
DATE: 08-Nov-2008
DOY: 313
OPERATIONS ENGINEER(S): R. Yurow / N. Cheung
SCIENTIST: Barry Kellett (RAL)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: Keyhole Operations 5-Nov-2008 thru 23-Aug-2008
==============================================================================
DATE: 09-Nov-2008
DOY: 314
OPERATIONS ENGINEER(S): R. Yurow / N. Cheung
SCIENTIST: Barry Kellett (RAL)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: Keyhole Operations 5-Nov-2008 thru 23-Aug-2008
==============================================================================
DATE: 10-Nov-2008
DOY: 315
OPERATIONS ENGINEER(S): R. Yurow / N. Cheung
SCIENTIST: Barry Kellett (RAL)
CDS INSTRUMENT:
The science plan was stopped at 3:55 UT in order to reload the
science plan with the new option. This is necessary since CPT was run
twice. The science plan will be resumed on day 316 at 8:05 UT
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: Keyhole Operations 5-Nov-2008 thru 23-Aug-2008
=============================================================================
DATE: 11-Nov-2008
DOY: 316
OPERATIONS ENGINEER(S): R. Yurow / N. Cheung
SCIENTIST: Ron Yurow (GSFC)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: Keyhole Operations 5-Nov-2008 thru 23-Aug-2008
==============================================================================
DATE: 12-Nov-2008
DOY: 317
OPERATIONS ENGINEER(S): R. Yurow / N. Cheung
SCIENTIST: Ron Yurow (GSFC)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: Keyhole Operations 5-Nov-2008 thru 23-Aug-2008
==============================================================================
DATE: 13-Nov-2008
DOY: 318
OPERATIONS ENGINEER(S): R. Yurow / N. Cheung
SCIENTIST: Ron Yurow (GSFC)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: Keyhole Operations 5-Nov-2008 thru 23-Aug-2008
==============================================================================
DATE: 14-Nov-2008
DOY: 319
OPERATIONS ENGINEER(S): R. Yurow / N. Cheung
SCIENTIST: Ron Yurow (GSFC)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: Keyhole Operations 5-Nov-2008 thru 23-Aug-2008
==============================================================================
DATE: 15-Nov-2008
DOY: 320
OPERATIONS ENGINEER(S): R. Yurow / N. Cheung
SCIENTIST: Ron Yurow (GSFC)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: Keyhole Operations 5-Nov-2008 thru 23-Aug-2008
==============================================================================
DATE: 16-Nov-2008
DOY: 321
OPERATIONS ENGINEER(S): R. Yurow / N. Cheung
SCIENTIST: Ron Yurow (GSFC)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: Keyhole Operations 5-Nov-2008 thru 23-Aug-2008
==============================================================================
DATE: 17-Nov-2008
DOY: 322
OPERATIONS ENGINEER(S): R. Yurow / N. Cheung
SCIENTIST: Ron Yurow (GSFC)
CDS INSTRUMENT: CDS doors were shut at 21:18 in preparation for S/C
maneuvers. CDS was removed from the ESR warning flag lwt at 21:23 UT.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: Keyhole Operations 5-Nov-2008 thru 23-Aug-2008
==============================================================================
DATE: 18-Nov-2008
DOY: 323
OPERATIONS ENGINEER(S): R. Yurow / N. Cheung
SCIENTIST: Ron Yurow (GSFC)
CDS INSTRUMENT: A submode transition from submode 5 to 6 occurred at
20:35 UT. CDS is nominal after the submode transition.
CDS was rebooted at 20:56 UT prior to full recovery to be completed
on DOY 324. Following the reboot, CDS was returned to STANDBY mode.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Submode Change. Science Operations.
COMMENTS: Keyhole Operations 5-Nov-2008 thru 23-Aug-2008
==============================================================================
DATE: 19-Nov-2008
DOY: 324
OPERATIONS ENGINEER(S): R. Yurow / N. Cheung
SCIENTIST: Ron Yurow (GSFC)
CDS INSTRUMENT: CDS doors were opened at ~ 23:39 UT via TSTOL. CDS
was then returned to the ESR warning flag list and spacecraft
substitution heaters were disabled.
Following these procedures, CDS was returned to READY-BOTH mode
from STANDBY mode at 00:09 UT. CDS science plan was resumed at
00:00 UT DOY 326.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: Keyhole Operations 5-Nov-2008 thru 23-Aug-2008
==============================================================================
DATE: 20-Nov-2008
DOY: 325
OPERATIONS ENGINEER(S): R. Yurow / N. Cheung
SCIENTIST: Andrzej Fludra (RAL)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: Keyhole Operations 5-Nov-2008 thru 23-Aug-2008
==============================================================================
DATE: 21-Nov-2008
DOY: 326
OPERATIONS ENGINEER(S): R. Yurow / N. Cheung
SCIENTIST: Andrzej Fludra (RAL)
CDS INSTRUMENT:
Attempt to load the plan was aborted at 13:55 UT due to multiple
command anomalies combinbed with the end-of-pass. CDS will go idle at
00:00 UT DOY 327.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: Keyhole Operations 5-Nov-2008 thru 23-Aug-2008
==============================================================================
DATE: 22-Nov-2008
DOY: 327
OPERATIONS ENGINEER(S): R. Yurow / N. Cheung
SCIENTIST: Andrzej Fludra (RAL)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM:
A plan was loaded at 23:23 to restart CDS science operations. The
science plan will resume at 00:00 UT Day 328.
DAY PLAN: Science Operations.
COMMENTS: Keyhole Operations 5-Nov-2008 thru 23-Aug-2008
==============================================================================
DATE: 23-Nov-2008
DOY: 328
OPERATIONS ENGINEER(S): R. Yurow / N. Cheung
SCIENTIST: Andrzej Fludra (RAL)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: Keyhole Operations 5-Nov-2008 thru 23-Aug-2008
==============================================================================
DATE: 24-Nov-2008
DOY: 329
OPERATIONS ENGINEER(S): R. Yurow / N. Cheung
SCIENTIST: Andrzej Fludra (RAL)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
==============================================================================
DATE: 25-Nov-2008
DOY: 330
OPERATIONS ENGINEER(S): R. Yurow / N. Cheung
SCIENTIST: John Rainnie (RAL)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
==============================================================================
DATE: 26-Nov-2008
DOY: 331
OPERATIONS ENGINEER(S): R. Yurow / N. Cheung
SCIENTIST: John Rainnie (RAL)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
==============================================================================
DATE: 27-Nov-2008
DOY: 332
OPERATIONS ENGINEER(S): R. Yurow / N. Cheung
SCIENTIST: John Rainnie (RAL)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
==============================================================================
DATE: 28-Nov-2008
DOY: 333
OPERATIONS ENGINEER(S): R. Yurow / N. Cheung
SCIENTIST: John Rainnie (RAL)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
==============================================================================
DATE: 29-Nov-2008
DOY: 334
OPERATIONS ENGINEER(S): R. Yurow / N. Cheung
SCIENTIST: John Rainnie (RAL)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
==============================================================================
DATE: 30-Nov-2008
DOY: 335
OPERATIONS ENGINEER(S): R. Yurow / N. Cheung
SCIENTIST: John Rainnie (RAL)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
==============================================================================
From the CDS Operations Management Team in the Space Science & Technology Department at CCLRC Rutherford Appleton Laboratory Site maintained by John Rainnie. Last revised on Tuesday (22/Apr/2008) at 21:15. |