DATE: 01-Nov-1999
DOY: 305
OPERATIONS ENGINEER(S):  R. Yurow
SCIENTIST: J. Brosius
CDS INSTRUMENT: 
  CTM31 continued to flag YELLOW high intermittently.
  GIS detector 1 was reenabled at 16:06 UT
  A telemetry submode transition from submode 4 (CDS low rate) to submode 5
  (CDS medium rate) occurred at 20:12 UT.
  CDS was brought down to SNOOZE mode at 21:12 in order to reload all 
  CDHS patches (it was decided that this necessary due to possible
  complications from the recovery on DOY 303).  The CDHS memory was then
  cleared and all CDHS patches were reloaded from the ground.  The CDS
  recovery was completed at 00:17 UT DOY 305 and science plan resumed at
  02:00 UT DOY 305.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
=============================================================================
DATE: 02-Nov-1999
DOY: 306
OPERATIONS ENGINEER(S):  R. Yurow
SCIENTIST: J. Brosius
CDS INSTRUMENT: 
  GIS detector 3 tripped at 2:01 UT.  Apparent cause of the trip was high
  curent as the MCP voltage was switched from 1.0 KV to 2.0 KV.  Detector 3
  was reset at 17:40 UT.  The detector was disabled at 23:14 UT pending 
  further investigation.
  A parity error in the primary processor memory space was detected.  Since
  the parity error is in a safe location, no reboot is necessary.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
=============================================================================
DATE: 03-Nov-1999
DOY: 307
OPERATIONS ENGINEER(S):  R. Yurow
SCIENTIST: J. Brosius
CDS INSTRUMENT: 
  A parity error occurred in the primary processor memory space.  Since the 
  parity error is in an unused location, no reboot is necessary.
  The GIS was reset at 00:00 UT DOY 308 and all three patches were reloaded 
  the bring the software up to version 2.6.  Following the reset, GIS 
  detector 3 high voltage tests were conducted.  
CDS GROUND SYSTEM: 
  The following studies were imported to the EOF:
	ffcal_3_1.def	ID 223 / Var 1
	ffcal_4_1.def	ID 224 / Var 1
DAY PLAN: Science Operations.
COMMENTS:
=============================================================================
DATE: 04-Nov-1999
DOY: 308
OPERATIONS ENGINEER(S):  R. Yurow
SCIENTIST: J. Brosius
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: 
  Wavelength calibration for GSET 57 was created.
DAY PLAN: Science Operations.
COMMENTS:
=============================================================================
DATE: 05-Nov-1999
DOY: 309
OPERATIONS ENGINEER(S):  R. Yurow
SCIENTIST: J. Brosius
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: 
  The following study was imported to the EOF:
	o_spot10_1.def	ID 225 / Var 1
DAY PLAN: Science Operations.
COMMENTS:
=============================================================================
DATE: 06-Nov-1999
DOY: 310
OPERATIONS ENGINEER(S):  E. Donaldson
SCIENTIST: J. Brosius
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
=============================================================================
DATE: 07-Nov-1999
DOY: 311
OPERATIONS ENGINEER(S):  W. Hammond
SCIENTIST: J. Brosius
CDS INSTRUMENT:
  A parity error was detected in the secondary (science) processor space.
  The secondary processor will be rebooted when convenient.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
=============================================================================
DATE: 08-Nov-1999
DOY: 312
OPERATIONS ENGINEER(S):  R. Yurow
SCIENTIST: A. Fludra
CDS INSTRUMENT:
  The secondary (science) processor was rebooted at 21:59 UT in order to clear
  a parity error.
  CDS shut its doors at 22:08 UT.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Close Doors, Science Operations.
COMMENTS:
=============================================================================
DATE: 09-Nov-1999
DOY: 313
OPERATIONS ENGINEER(S):  R. Yurow
SCIENTIST: A. Fludra
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Temperature Monitoring.
COMMENTS:
=============================================================================
DATE: 10-Nov-1999
DOY: 314
OPERATIONS ENGINEER(S):  R. Yurow / C. Maroney
SCIENTIST: A. Fludra
CDS INSTRUMENT: 
  CDS doors were opened at 22:26 UT.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Open Doors, Science Operations.
COMMENTS:
=============================================================================
DATE: 11-Nov-1999
DOY: 315
OPERATIONS ENGINEER(S):  R. Yurow / C. Maroney
SCIENTIST: A. Fludra
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM:
  The following study was imported to the EOF:
	merc2_2.def	ID 200 / Var 2
DAY PLAN: Open Doors, Science Operations.
COMMENTS:
=============================================================================
DATE: 12-Nov-1999
DOY: 316
OPERATIONS ENGINEER(S):  R. Yurow / C. Maroney
SCIENTIST: A. Fludra
CDS INSTRUMENT:
  A parity errror was detected in the secondary (science) processor memory
  space.  The secondary processor was rebooted at 23:53 UT.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Open Doors, Science Operations.
COMMENTS:
=============================================================================
DATE: 13-Nov-1999
DOY: 317
OPERATIONS ENGINEER(S):  E. Donaldson
SCIENTIST: A. Fludra
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
=============================================================================
DATE: 14-Nov-1999
DOY: 318
OPERATIONS ENGINEER(S):  C. Maroney / W. Hammond
SCIENTIST: A. Fludra
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
=============================================================================
DATE: 15-Nov-1999
DOY: 319
OPERATIONS ENGINEER(S):  C. Maroney
SCIENTIST: A. Fludra
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
=============================================================================
DATE: 16-Nov-1999
DOY: 320
OPERATIONS ENGINEER(S):  R. Yurow  / C. Maroney
SCIENTIST: A. Fludra
CDS INSTRUMENT: 
  CDS doors were closed at 11:14 UT and brought down to SNOOZE mode at
  11:22 UT in preparation for the Leonids meteor storm.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Close Doors, Science Operations.
COMMENTS:
=============================================================================
DATE: 17-Nov-1999
DOY: 321
OPERATIONS ENGINEER(S):  R. Yurow  / C. Maroney
SCIENTIST: A. Fludra
CDS INSTRUMENT: 
  Nominal, CDS remains in SNOOZE mode.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Temperature Monitoring.
COMMENTS:
=============================================================================
DATE: 18-Nov-1999
DOY: 322
OPERATIONS ENGINEER(S):  R. Yurow  / C. Maroney
SCIENTIST: A. Fludra
CDS INSTRUMENT: 
  Nominal, CDS remains in SNOOZE mode.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Temperature Monitoring.
COMMENTS:
=============================================================================
DATE: 19-Nov-1999
DOY: 323
OPERATIONS ENGINEER(S):  R. Yurow  / C. Maroney
SCIENTIST: A. Fludra
CDS INSTRUMENT: 
  Nominal, CDS remains in SNOOZE mode.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Temperature Monitoring.
COMMENTS:
=============================================================================
DATE: 20-Nov-1999
DOY: 324
OPERATIONS ENGINEER(S):  R. Yurow  / C. Maroney
SCIENTIST: A. Fludra
CDS INSTRUMENT: 
  CDS spacecraft substitution heaters were switched off at ~20:45 UT.  CDS was
  then reset and brought up to STANDBY mode at 21:19 UT.  Following MCU 
  mechanism test as well as NIS and GIS electronics tests, CDS was brought up
  to standby by at 23:29 UT.  Recovery was completed at 00:19 UT DOY 325.
  CDS doors were opened at 02:35 UT DOY 325 following NIS closed door detector
  tests.   
CDS GROUND SYSTEM: Nominal.
DAY PLAN: CDS Recovery.
COMMENTS:
=============================================================================
DATE: 21-Nov-1999
DOY: 325
OPERATIONS ENGINEER(S):  R. Yurow
SCIENTIST: A. Fludra
CDS INSTRUMENT: 
  CDS remains nominal.  NIS and GIS test images were taken followed by pointing
  tests using the HEII2P study.  The science plan will resume at 00:00 UT 
  DOY 326
CDS GROUND SYSTEM: Nominal.
DAY PLAN: CDS Engineering Tests
COMMENTS:
=============================================================================
DATE: 22-Nov-1999
DOY: 326
OPERATIONS ENGINEER(S):  R. Yurow / C. Maroney
SCIENTIST: B. Thompson
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations
COMMENTS:
=============================================================================
DATE: 23-Nov-1999
DOY: 327
OPERATIONS ENGINEER(S):  C. Maroney
SCIENTIST: B. Thompson
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations
COMMENTS:
=============================================================================
DATE: 24-Nov-1999
DOY: 328
OPERATIONS ENGINEER(S):  C. Maroney
SCIENTIST: B. Thompson
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations
COMMENTS:
=============================================================================
DATE: 25-Nov-1999
DOY: 329
OPERATIONS ENGINEER(S):  C. Maroney
SCIENTIST: B. Thompson
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations
COMMENTS:Thanksgiving Holiday
=============================================================================
DATE: 26-Nov-1999
DOY: 330
OPERATIONS ENGINEER(S):  C. Maroney / W. Hammond
SCIENTIST: B. Thompson
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: 
  EGSE stopped collecting data at ~20:00UT (DOY 328) due to a full archive
disk.  Removed old data and continued EGSE software.  Started replay of
data covering 99_328_20 through 99_330_17.
DAY PLAN: Science Operations
COMMENTS:
=============================================================================
DATE: 27-Nov-1999
DOY: 331
OPERATIONS ENGINEER(S):  E. Donaldson / W. Hammond
SCIENTIST: B. Thompson
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations
COMMENTS:
=============================================================================
DATE: 28-Nov-1999
DOY: 332
OPERATIONS ENGINEER(S):  C. Maroney
SCIENTIST: B. Thompson
CDS INSTRUMENT: 
  SOHO went into ESR mode at 11:36UT.  It appears CDS crashed in the
transition into ESR mode.  Current status is: Processor down, Doors open,
and MCU contolling thermal environment.  OCD was submitted to turn on
substitution heater #62 (at 60% duty cycle) if QTC temperatures drop below
5 degC of intitial readings.  
CDS GROUND SYSTEM: Nominal.
DAY PLAN: QTC temperature monitoring
COMMENTS:
=============================================================================
DATE: 29-Nov-1999
DOY: 333
OPERATIONS ENGINEER(S):  C. Maroney
SCIENTIST: T. Kucera
CDS INSTRUMENT:  
  CDHS was rebooted at 23:23 UT, doors closed at 23:32 UT and CDS placed
into SNOOZE mode at 23:33 UT in preperation for Momentum Management.
Substitution heaters were turned on at 23:52 UT.
CDS GROUND SYSTEM: Nominal
DAY PLAN: Reboot CDHS, Close door, SNOOZE mode, Temperature monitoring
COMMENTS:
=============================================================================
DATE: 30-Nov-1999
DOY: 334
OPERATIONS ENGINEER(S):  C. Maroney
SCIENTIST: T. Kucera
CDS INSTRUMENT:  
  In SNOOZE mode.
CDS GROUND SYSTEM: Nominal
DAY PLAN: Temperature monitoring
COMMENTS:
=============================================================================



From the CDS Operations Management Team in the Space Science & Technology Department at CCLRC Rutherford Appleton Laboratory
Site maintained by John Rainnie.