Scientific Operations | ![]() |
|
October 2000
=============================================================================
DATE:01-Oct-2000
DOY: 275
OPERATIONS ENGINEER(S): W. Hammond / B. Donaldson
SCIENTIST: D. Zarro
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Observations.
COMMENTS:
=============================================================================
DATE:02-Oct-2000
DOY: 276
OPERATIONS ENGINEER(S): R. Yurow / C. Maroney
SCIENTIST: A. Fludra
CDS INSTRUMENT:
A parity error was detected in the primary processor memory space. Since
the parity error was located in the vectorspace of a module, no reboot
was necessary.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Observations.
COMMENTS:
=============================================================================
DATE:03-Oct-2000
DOY: 277
OPERATIONS ENGINEER(S): R. Yurow / C. Maroney
SCIENTIST: A. Fludra
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Observations.
COMMENTS:
=============================================================================
DATE:04-Oct-2000
DOY: 278
OPERATIONS ENGINEER(S): R. Yurow / C. Maroney
SCIENTIST: A. Fludra
CDS INSTRUMENT:
A parity error was detected in the primary processor memory space. The
parity error was located in the packetization module which is considered
safe.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Observations.
COMMENTS:
=============================================================================
DATE:05-Oct-2000
DOY: 279
OPERATIONS ENGINEER(S): R. Yurow / C. Maroney
SCIENTIST: A. Fludra
CDS INSTRUMENT:
Slit position test were conducted between 19:00 UT and 22:30 UT
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Observations.
COMMENTS:
=============================================================================
DATE:06-Oct-2000
DOY: 280
OPERATIONS ENGINEER(S): R. Yurow / C. Maroney
SCIENTIST: A. Fludra
CDS INSTRUMENT:
Slit position test were conducted between 20:00 UT and 22:30 UT
CDS GROUND SYSTEM: Nominal.
The following study was imported to the EOF:
ardiag_1_53.def (Study ID: 44 / Variation: 53)
DAY PLAN: Science Observations.
COMMENTS:
=============================================================================
DATE:07-Oct-2000
DOY: 281
OPERATIONS ENGINEER(S): W. Hammond / B. Donaldson
SCIENTIST: A. Fludra
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Observations.
COMMENTS:
=============================================================================
DATE:08-Oct-2000
DOY: 282
OPERATIONS ENGINEER(S): W. Hammond / B. Donaldson
SCIENTIST: A. Fludra
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Observations.
COMMENTS:
=============================================================================
DATE:09-Oct-2000
DOY: 283
OPERATIONS ENGINEER(S): C. Maroney
SCIENTIST: T. Kucera
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Observations.
COMMENTS:
=============================================================================
DATE:10-Oct-2000
DOY: 284
OPERATIONS ENGINEER(S): R. Yurow / C. Maroney
SCIENTIST: T. Kucera
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Observations.
COMMENTS:
=============================================================================
DATE:11-Oct-2000
DOY: 285
OPERATIONS ENGINEER(S): R. Yurow / C. Maroney
SCIENTIST: T. Kucera
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Observations.
COMMENTS:
=============================================================================
DATE:12-Oct-2000
DOY: 286
OPERATIONS ENGINEER(S): R. Yurow / C. Maroney
SCIENTIST: T. Kucera
CDS INSTRUMENT:
Due to a SEU in the secondary (science) processor memory space, sience data
was corrupted with cyclic artifacts starting at 6:00 UT. The secondary
processor was rebooted at 14;12 UT and several test studies were run. The
primary processor was then reboot with recovery procedures completed at
18:55 UT. The science plan was resumed at 19:30 UT.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Observations.
COMMENTS:
=============================================================================
DATE:13-Oct-2000
DOY: 287
OPERATIONS ENGINEER(S): R. Yurow / C. Maroney
SCIENTIST: T. Kucera
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM:
The following study was imported to the EOF:
stre4w_63.def (Study ID: 11 / Variation: 88)
DAY PLAN: Science Observations.
COMMENTS:
=============================================================================
DATE:14-Oct-2000
DOY: 288
OPERATIONS ENGINEER(S): W. Hammond / B. Donaldson
SCIENTIST: T. Kucera
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Observations.
COMMENTS:
=============================================================================
DATE:15-Oct-2000
DOY: 289
OPERATIONS ENGINEER(S): W. Hammond / B. Donaldson
SCIENTIST: T. Kucera
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Observations.
COMMENTS:
=============================================================================
DATE:16-Oct-2000
DOY: 290
OPERATIONS ENGINEER(S): R. Yurow / C. Maroney
SCIENTIST: H. Magee
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Observations.
COMMENTS:
=============================================================================
DATE:17-Oct-2000
DOY: 291
OPERATIONS ENGINEER(S): R. Yurow / C. Maroney
SCIENTIST: H. Magee
CDS INSTRUMENT:
One run of FFCAL (NIS Sensitivity Scan) was begun at 20:33 UT. It was
aborted at 22:02 after the onboard study completed.
A parity error was detected in the primary processor memory space, in the
MACRO7 module. Since this is an unsafe location, a CDHS reboot was required.
The science plan was aborted at 22:40 and recovery operations were completed
at 23:45 UT. The science plan was resumed at 00:00 UT DOY 292
CDS GROUND SYSTEM:
The following study was imported to the EOF:
gplage2_64.def
DAY PLAN: Science Observations.
COMMENTS:
=============================================================================
DATE:18-Oct-2000
DOY: 292
OPERATIONS ENGINEER(S): R. Yurow / C. Maroney
SCIENTIST: H. Magee
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Observations.
COMMENTS:
=============================================================================
DATE:19-Oct-2000
DOY: 293
OPERATIONS ENGINEER(S): R. Yurow / C. Maroney
SCIENTIST: H. Magee
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Observations.
COMMENTS:
=============================================================================
DATE:20-Oct-2000
DOY: 294
OPERATIONS ENGINEER(S): R. Yurow / C. Maroney
SCIENTIST: H. Magee
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM:
The following studies were imported to the EOF:
o_loop4.def (Study ID: 125 / Variation: 2)
o_loop5.def (Study ID: 242 / Variation: 1)
DAY PLAN: Science Observations.
COMMENTS:
=============================================================================
DATE:21-Oct-2000
DOY: 295
OPERATIONS ENGINEER(S): W. Hammond / B. Donaldson
SCIENTIST: H. Magee
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Observations.
COMMENTS:
=============================================================================
DATE:22-Oct-2000
DOY: 296
OPERATIONS ENGINEER(S): W. Hammond / B. Donaldson
SCIENTIST: H. Magee
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Observations.
COMMENTS:
=============================================================================
DATE:23-Oct-2000
DOY: 297
OPERATIONS ENGINEER(S): R. Yurow / C. Maroney
SCIENTIST: T. Fredvik
CDS INSTRUMENT:
A parity error was detected in the secondary (science) processor memory
space.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Observations.
COMMENTS:
=============================================================================
DATE:24-Oct-2000
DOY: 298
OPERATIONS ENGINEER(S): R. Yurow / C. Maroney
SCIENTIST: T. Fredvik
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Observations.
COMMENTS:
=============================================================================
DATE:25-Oct-2000
DOY: 299
OPERATIONS ENGINEER(S): R. Yurow / C. Maroney
SCIENTIST: T. Fredvik
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Observations.
COMMENTS:
=============================================================================
DATE:26-Oct-2000
DOY: 300
OPERATIONS ENGINEER(S): R. Yurow / C. Maroney
SCIENTIST: T. Fredvik
CDS INSTRUMENT:
CDS doors were shut at 21:26 for S/C maneuvers.
The secondary (science) processor was rebooted at 21:48 UT
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Observations, Close Doors.
COMMENTS:
=============================================================================
DATE:27-Oct-2000
DOY: 301
OPERATIONS ENGINEER(S): R. Yurow / C. Maroney
SCIENTIST: T. Fredvik
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Temperature Monitoring.
COMMENTS:
=============================================================================
DATE:28-Oct-2000
DOY: 302
OPERATIONS ENGINEER(S): B. Donaldson / W. Hammond
SCIENTIST: T. Fredvik
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Temperature Monitoring.
COMMENTS:
=============================================================================
DATE:29-Oct-2000
DOY: 303
OPERATIONS ENGINEER(S): R. Yurow / W. Hammond
SCIENTIST: T. Fredvik
CDS INSTRUMENT:
CDS doors were opened at 00:30 UT.
A parity error was detected in the primary processor memory space. Since
parity error is located in an unused memory location, no reboot is
necessary.
Slit testing was conducted between 21:34 UT and 23:00 UT.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Open Doors, Science Observations.
COMMENTS:
=============================================================================
DATE:30-Oct-2000
DOY: 304
OPERATIONS ENGINEER(S): R. Yurow / C. Maroney
SCIENTIST: S. Regnier
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Temperature Monitoring.
COMMENTS:
=============================================================================
DATE:31-Oct-2000
DOY: 305
OPERATIONS ENGINEER(S): R. Yurow / C. Maroney
SCIENTIST: S. Regnier
CDS INSTRUMENT:
An NIS Setup Register A Failure system error was detected.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Temperature Monitoring.
COMMENTS:
=============================================================================
From the CDS Operations Management Team in the Space Science & Technology Department at CCLRC Rutherford Appleton Laboratory Site maintained by John Rainnie. Last revised on Tuesday (17/Jul/2001) at 08:59. |