September 2001
 
=============================================================================
DATE:1-September-2001
DOY: 244
OPERATIONS ENGINEER(S): B. Donaldson
SCIENTIST: C. Foley
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
=============================================================================
DATE:2-September-2001
DOY: 245
OPERATIONS ENGINEER(S): C. Maroney
SCIENTIST: C. Foley
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
=============================================================================
DATE:3-September-2001
DOY: 246
OPERATIONS ENGINEER(S): R. Yurow
SCIENTIST: C. Foley
CDS INSTRUMENT: 
  Secondary Memory error detected at memory location #8007125f.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
=============================================================================
DATE:4-September-2001
DOY: 247
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: C. Foley
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
=============================================================================
DATE:5-September-2001
DOY: 248
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: C. Foley
CDS INSTRUMENT: 
  The CDHS primary processor was reset at 17:58 UT, by the CB3RESET command.
However, following the return to READY_BOTH, it was noticed that the GIS
processor checksum was incorrect.  The GIS was reset and all 3 patches were
uploaded to bring the GIS up to software version 2.6.  Recovery operations
were completed at 19:24 UT and the science plan was resumed at 20:20 UT. CDS
is nominal after the recovery.
One run of FFCAL(NIS flat field calibration study) was completed at 21:20UT.
CDS GROUND SYSTEM: 
The following study was imported to the EOF:
  chrom_n8_1.def.
DAY PLAN: Science Operations.
COMMENTS:
=============================================================================
DATE:6-September-2001
DOY: 249
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: C. Foley
CDS INSTRUMENT: 
  GIS detector 1 and detector 2 tripped at 05:50 UT due to ecessive count
rate.  Detector 1 was reset at 6:58 UT and Detector 2 at 6:59 UT.
  A lubrication study was completed at 20:53 UT.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
=============================================================================
DATE:7-September-2001
DOY: 250
OPERATIONS ENGINEER(S): R. Yurow
SCIENTIST: C. Foley
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
=============================================================================
DATE:8-September-2001
DOY: 251
OPERATIONS ENGINEER(S): B. Donaldson
SCIENTIST: C. Foley
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
=============================================================================
DATE:9-September-2001
DOY: 252
OPERATIONS ENGINEER(S): R. Yurow
SCIENTIST: C. Foley
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
=============================================================================
DATE:10-September-2001
DOY: 253
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: J. Ireland
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
=============================================================================
DATE:11-September-2001
DOY: 254
OPERATIONS ENGINEER(S): R. Yurow
SCIENTIST: J. Ireland
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:13-September-2001
DOY: 256
OPERATIONS ENGINEER(S): R. Yurow
SCIENTIST: B. Thompson 
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE:14-September-2001
DOY: 257
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: B. Thompson
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
=============================================================================
DATE:15-September-2001
DOY: 258
OPERATIONS ENGINEER(S): B. Donaldson
SCIENTIST: B. Thompson
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
=============================================================================
DATE:16-September-2001
DOY: 259
OPERATIONS ENGINEER(S): R. Yurow
SCIENTIST: B. Thompson
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
=============================================================================
DATE:17-September-2001
DOY: 260
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: B. Thompson
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
=============================================================================
DATE:18-September-2001
DOY: 261
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: B. Thompson
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
=============================================================================
DATE:19-September-2001
DOY: 262
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: B. Thompson
CDS INSTRUMENT: 
  Slit Testing was conducted from 20:00 UT to 23:30 UT.
  CDS was rebooted at 23:37 UT to clear error in the study counter.
  GIS patches were reloaded and recovery was completed at 01:00 UT (DOY 263).
  The science plan resumed at 06:20 UT (DOY 263)
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
=============================================================================
DATE:20-September-2001
DOY: 263
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: B. Thompson
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
=============================================================================
DATE:21-September-2001
DOY: 264
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: B. Thompson
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
=============================================================================
DATE:22-September-2001
DOY: 265
OPERATIONS ENGINEER(S): B. Donaldson
SCIENTIST: B. Thompson
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
=============================================================================
DATE:23-September-2001
DOY: 266
OPERATIONS ENGINEER(S): C. Maroney
SCIENTIST: B. Thompson
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
=============================================================================
DATE:24-September-2001
DOY: 267
OPERATIONS ENGINEER(S): R. Yurow
SCIENTIST: A. Fludra
CDS INSTRUMENT: 
  CDS was safed at 16:31 by turning off the High Voltage to the NIS as well
as all 4 GIS detectors in response to a proton event earlier in the day.
Proton levels eventually reached 10^2 for >50 MEV from the GOES plots.
  A parity error was detected on the primary processor at address #80056697.
Parity error is in the science module and therefore safe.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS:
=============================================================================
DATE:25-September-2001
DOY: 268
OPERATIONS ENGINEER(S): R. Yurow / C. Maroney
SCIENTIST: A. Fludra
CDS INSTRUMENT: 
  A parity error was detected on the secondary processor at address #8001423f
  A mechanism lubrication was completed at 19:48 UT.
  Slit mechanism testing was conducted between 20:00 UT and 21:30 UT.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Monitor Proton levels / Instrument
COMMENTS: CDS Safed Due to High Proton Levels
=============================================================================
DATE:26-September-2001
DOY: 269
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: A. Fludra
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Monitor Proton levels / Instrument
COMMENTS: CDS Safed Due to High Proton Levels
=============================================================================
DATE:27-September-2001
DOY: 270
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: A. Fludra
CDS INSTRUMENT: 
  CDS was recovered at 21:15 UT.  This included a full reboot and loading of
GIS patches (v2.6) at 20:30 UT.  Science plan will resume at 22:08 UT.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: CDS Recovery, Science Operations
COMMENTS: 
=============================================================================
DATE:28-September-2001
DOY: 271
OPERATIONS ENGINEER(S): C. Maroney
SCIENTIST: A. Fludra
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations
COMMENTS: 
=============================================================================
DATE:29-September-2001
DOY: 272
OPERATIONS ENGINEER(S): B. Donaldson
SCIENTIST: A. Fludra
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations
COMMENTS: 
=============================================================================
DATE:30-September-2001
DOY: 273
OPERATIONS ENGINEER(S): R. Yurow
SCIENTIST: A. Fludra
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations
COMMENTS: 
=============================================================================