Scientific Operations | ||
|
September 2001============================================================================= DATE:1-September-2001 DOY: 244 OPERATIONS ENGINEER(S): B. Donaldson SCIENTIST: C. Foley CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:2-September-2001 DOY: 245 OPERATIONS ENGINEER(S): C. Maroney SCIENTIST: C. Foley CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:3-September-2001 DOY: 246 OPERATIONS ENGINEER(S): R. Yurow SCIENTIST: C. Foley CDS INSTRUMENT: Secondary Memory error detected at memory location #8007125f. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:4-September-2001 DOY: 247 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: C. Foley CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:5-September-2001 DOY: 248 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: C. Foley CDS INSTRUMENT: The CDHS primary processor was reset at 17:58 UT, by the CB3RESET command. However, following the return to READY_BOTH, it was noticed that the GIS processor checksum was incorrect. The GIS was reset and all 3 patches were uploaded to bring the GIS up to software version 2.6. Recovery operations were completed at 19:24 UT and the science plan was resumed at 20:20 UT. CDS is nominal after the recovery. One run of FFCAL(NIS flat field calibration study) was completed at 21:20UT. CDS GROUND SYSTEM: The following study was imported to the EOF: chrom_n8_1.def. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:6-September-2001 DOY: 249 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: C. Foley CDS INSTRUMENT: GIS detector 1 and detector 2 tripped at 05:50 UT due to ecessive count rate. Detector 1 was reset at 6:58 UT and Detector 2 at 6:59 UT. A lubrication study was completed at 20:53 UT. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:7-September-2001 DOY: 250 OPERATIONS ENGINEER(S): R. Yurow SCIENTIST: C. Foley CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:8-September-2001 DOY: 251 OPERATIONS ENGINEER(S): B. Donaldson SCIENTIST: C. Foley CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:9-September-2001 DOY: 252 OPERATIONS ENGINEER(S): R. Yurow SCIENTIST: C. Foley CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:10-September-2001 DOY: 253 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: J. Ireland CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:11-September-2001 DOY: 254 OPERATIONS ENGINEER(S): R. Yurow SCIENTIST: J. Ireland CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:13-September-2001 DOY: 256 OPERATIONS ENGINEER(S): R. Yurow SCIENTIST: B. Thompson CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:14-September-2001 DOY: 257 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: B. Thompson CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:15-September-2001 DOY: 258 OPERATIONS ENGINEER(S): B. Donaldson SCIENTIST: B. Thompson CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:16-September-2001 DOY: 259 OPERATIONS ENGINEER(S): R. Yurow SCIENTIST: B. Thompson CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:17-September-2001 DOY: 260 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: B. Thompson CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:18-September-2001 DOY: 261 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: B. Thompson CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:19-September-2001 DOY: 262 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: B. Thompson CDS INSTRUMENT: Slit Testing was conducted from 20:00 UT to 23:30 UT. CDS was rebooted at 23:37 UT to clear error in the study counter. GIS patches were reloaded and recovery was completed at 01:00 UT (DOY 263). The science plan resumed at 06:20 UT (DOY 263) CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:20-September-2001 DOY: 263 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: B. Thompson CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:21-September-2001 DOY: 264 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: B. Thompson CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:22-September-2001 DOY: 265 OPERATIONS ENGINEER(S): B. Donaldson SCIENTIST: B. Thompson CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:23-September-2001 DOY: 266 OPERATIONS ENGINEER(S): C. Maroney SCIENTIST: B. Thompson CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:24-September-2001 DOY: 267 OPERATIONS ENGINEER(S): R. Yurow SCIENTIST: A. Fludra CDS INSTRUMENT: CDS was safed at 16:31 by turning off the High Voltage to the NIS as well as all 4 GIS detectors in response to a proton event earlier in the day. Proton levels eventually reached 10^2 for >50 MEV from the GOES plots. A parity error was detected on the primary processor at address #80056697. Parity error is in the science module and therefore safe. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:25-September-2001 DOY: 268 OPERATIONS ENGINEER(S): R. Yurow / C. Maroney SCIENTIST: A. Fludra CDS INSTRUMENT: A parity error was detected on the secondary processor at address #8001423f A mechanism lubrication was completed at 19:48 UT. Slit mechanism testing was conducted between 20:00 UT and 21:30 UT. CDS GROUND SYSTEM: Nominal. DAY PLAN: Monitor Proton levels / Instrument COMMENTS: CDS Safed Due to High Proton Levels ============================================================================= DATE:26-September-2001 DOY: 269 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: A. Fludra CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Monitor Proton levels / Instrument COMMENTS: CDS Safed Due to High Proton Levels ============================================================================= DATE:27-September-2001 DOY: 270 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: A. Fludra CDS INSTRUMENT: CDS was recovered at 21:15 UT. This included a full reboot and loading of GIS patches (v2.6) at 20:30 UT. Science plan will resume at 22:08 UT. CDS GROUND SYSTEM: Nominal. DAY PLAN: CDS Recovery, Science Operations COMMENTS: ============================================================================= DATE:28-September-2001 DOY: 271 OPERATIONS ENGINEER(S): C. Maroney SCIENTIST: A. Fludra CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations COMMENTS: ============================================================================= DATE:29-September-2001 DOY: 272 OPERATIONS ENGINEER(S): B. Donaldson SCIENTIST: A. Fludra CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations COMMENTS: ============================================================================= DATE:30-September-2001 DOY: 273 OPERATIONS ENGINEER(S): R. Yurow SCIENTIST: A. Fludra CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations COMMENTS: ============================================================================= From the CDS Operations Management Team in the Space Science & Technology Department at CCLRC Rutherford Appleton Laboratory Site maintained by John Rainnie. Last revised on Tuesday (17/Jul/2001) at 08:55. |