Scientific Operations | ||
|
September 2003============================================================================= DATE:1-Sep-2003 DOY: 244 OPERATIONS ENGINEER(S): R. Yurow SCIENTIST: P. Young (RAL) CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:2-Sep-2003 DOY: 245 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: P. Young (RAL) CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: The following changes were made to raster duration times: G2NS (RID/126 ,Var/2) 1286s - 1300s G2AL_V4B (RID/231, Var/1) 5570s - 5580s BP_W_1 (RID/13, Var/24) 630s - 640s. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:3-Sep-2003 DOY: 246 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: P. Young (RAL) CDS INSTRUMENT: A Mechanism lubrication was completed at 00:19 UT (DOY 247). CDS GROUND SYSTEM: SOC System Failover testing was conducted from 14-17 UT (During a gap in telemetry). SOC/CDS ground systems nominal. DAY PLAN: Mechanism Lubrication, Science Operations. COMMENTS: ============================================================================= DATE:4-Sep-2003 DOY: 247 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: P. Young (RAL) CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:5-Sep-2003 DOY: 248 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: P. Young (RAL) CDS INSTRUMENT: A Flat Field Calibrations was run at 22:13 UT. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:6-Sep-2003 DOY: 249 OPERATIONS ENGINEER(S): J. Seidel / C. King SCIENTIST: P. Young (RAL) CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:7-Sep-2003 DOY: 250 OPERATIONS ENGINEER(S): J. Seidel / C. King SCIENTIST: P. Young (RAL) CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:8-Sep-2003 DOY: 251 OPERATIONS ENGINEER(S): R. Yurow SCIENTIST: T. Kucera CDS INSTRUMENT: A parity error was detected in the Secondary memory space at address #8000715b. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:9-Sep-2003 DOY: 252 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: T. Kucera CDS INSTRUMENT: A NIS Setup Register A Failure was detected. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:10-Sep-2003 DOY: 253 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: T. Kucera CDS INSTRUMENT: The wavecal's for GIS GSETS 73 & 76 were updated. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:11-Sep-2003 DOY: 254 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: T. Kucera CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:12-Sep-2003 DOY: 255 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: T. Kucera CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:13-Sep-2003 DOY: 256 OPERATIONS ENGINEER(S): J. Seidel / C. King SCIENTIST: T. Kucera CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:14-Sep-2003 DOY: 257 OPERATIONS ENGINEER(S): J. Seidel / C. King SCIENTIST: T. Kucera CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:15-Sep-2003 DOY: 258 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: P. Gallagher CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:16-Sep-2003 DOY: 259 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: P. Gallagher CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: At 20:20 UT, the IWS software was restarted due to a lost connection between cdso7 and the SOC machines. Previously, during the gap (16:50 - 20:15 UT), SOCs were performing Fail-Over testing. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:17-Sep-2003 DOY: 260 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: P. Gallagher CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: A 4-day science plan was uploaded in case operations become impossible during hurricane Isabel. ============================================================================= DATE:18-Sep-2003 DOY: 261 OPERATIONS ENGINEER(S): C. Maroney SCIENTIST: P. Gallagher CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: Goddard closed at noon due to increased weather conditions of Isabel. ============================================================================= DATE:19-Sep-2003 DOY: 262 OPERATIONS ENGINEER(S): R. Yurow SCIENTIST: P. Gallagher CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: All of the CDS operations machines were taken down and rebooted at 23:05 UT to clear an error on cdso8. DAY PLAN: Science Operations. COMMENTS: Goddard closed due to hurricane Isabel. ============================================================================= DATE:20-Sep-2003 DOY: 263 OPERATIONS ENGINEER(S): J. Seidel / C. King SCIENTIST: P. Gallagher CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:21-Sep-2003 DOY: 264 OPERATIONS ENGINEER(S): J. Seidel / C. King SCIENTIST: P. Gallagher CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:22-Sep-2003 DOY: 265 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: A. Fludra CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:23-Sep-2003 DOY: 266 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: A. Fludra CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:24-Sep-2003 DOY: 267 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: A. Fludra CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:25-Sep-2003 DOY: 268 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: A. Fludra CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:26-Sep-2003 DOY: 269 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: A. Fludra CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:27-Sep-2003 DOY: 270 OPERATIONS ENGINEER(S): J. Seidel / C. King SCIENTIST: A. Fludra CDS INSTRUMENT: A parity error was detected in the Secondary (Science) Processor at memory location #80077037. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:28-Sep-2003 DOY: 271 OPERATIONS ENGINEER(S): J. Seidel / C. King SCIENTIST: A. Fludra CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:29-Sep-2003 DOY: 272 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: W. Thompson CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE:30-Sep-2003 DOY: 273 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: W. Thompson CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= From the CDS Operations Management Team in the Space Science & Technology Department at CCLRC Rutherford Appleton Laboratory Site maintained by John Rainnie. Last revised on Tuesday (17/Jul/2001) at 08:55. |