Scientific Operations
 Front Page
 Scientific Ops
  » Plans
  » Pointings
  » Report
  » Requests
  » Log
  » Notes
  » Tech Info
 Engineering
 Software
 Results
 Gallery
 Atlas
 Press
 Links
 Project
 Newsletter
 Copyright
September 2004
 
=============================================================================
DATE: 1-Sep-2004
DOY: 245
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: R. Milligan
CDS INSTRUMENT: 
  A parity error was detected on the Secondary (Science) Processor at
address location #80075a5b.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE: 2-Sep-2004
DOY: 246
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: R. Milligan
CDS INSTRUMENT: 
  A parity error was detected on the Secondary (Science) Processor at
address location #8007ac77.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE: 3-Sep-2004
DOY: 247
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: R. Milligan
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE: 4-Sep-2004
DOY: 248
OPERATIONS ENGINEER(S): B. Howell / C. King
SCIENTIST: R. Milligan
CDS INSTRUMENT: 
  A Parity error was detected on the Secondary (Science) Processor at
address location: #80008b0f.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE: 5-Sep-2004
DOY: 249
OPERATIONS ENGINEER(S): B. Howell / C. King
SCIENTIST: R. Milligan
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE: 6-Sep-2004
DOY: 250
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: D. Pike / P. Young (RAL)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE: 7-Sep-2004
DOY: 251
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: D. Pike / P. Young (RAL)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE: 8-Sep-2004
DOY: 252
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: D. Pike / P. Young (RAL)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE: 9-Sep-2004
DOY: 253
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: D. Pike / P. Young (RAL)
CDS INSTRUMENT: 
  A Setup NIS Register A Failure was detected.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE: 10-Sep-2004
DOY: 254
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: D. Pike / P. Young (RAL)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE: 11-Sep-2004
DOY: 255
OPERATIONS ENGINEER(S): B. Howell / C. King
SCIENTIST: D. Pike / P. Young (RAL)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE: 12-Sep-2004
DOY: 256
OPERATIONS ENGINEER(S): B. Howell / C. King
SCIENTIST: D. Pike / P. Young (RAL)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE: 13-Sep-2004
DOY: 257
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: D. Pike / P. Young (RAL)
CDS INSTRUMENT: 
  Parity errors were detected on the Primary Processor at address locations:
#8002d85f (Macro7) and #8006d85f (Unused Area).  A full CDS reset is
scheduled for tomorrow at 19 UT.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE: 14-Sep-2004
DOY: 258
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: D. Pike / P. Young (RAL)
CDS INSTRUMENT: 
  A full CDS reset was completed at 20:01 UT.  The science plan will resume
at 22:14 UT.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE: 15-Sep-2004
DOY: 259
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: D. Pike / P. Young (RAL)
CDS INSTRUMENT: 
  CIEG+5V exceeded its Yellow High Limits, toggling 8x between nominal limits
and 454.645418326693v from 20:22 UT - 20:44 UT.  Cause unknown at this time.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE: 16-Sep-2004
DOY: 260
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: D. Pike / P. Young (RAL)
CDS INSTRUMENT: 
  A Setup VDS Register A Failure was detected.
  An on-board Mechanism Lubrication study was run and completed by 15:30 UT.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE: 17-Sep-2004
DOY: 261
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: D. Pike / P. Young (RAL)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Limited (Keyhole) Science Operations.
COMMENTS: 
=============================================================================
DATE: 18-Sep-2004
DOY: 262
OPERATIONS ENGINEER(S): B. Howell / C. King
SCIENTIST: D. Pike / P. Young (RAL)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Limited (Keyhole) Science Operations.
COMMENTS: 
=============================================================================
DATE: 19-Sep-2004
DOY: 263
OPERATIONS ENGINEER(S): B. Howell / C. King
SCIENTIST: D. Pike / P. Young (RAL)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Limited (Keyhole) Science Operations.
COMMENTS: 
=============================================================================
DATE: 20-Sep-2004
DOY: 264
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: C. Maroney
CDS INSTRUMENT: 
  CDS Doors were closed at 14:46 UT for S/C Maneuvers.
  FOT disabled ESR flag for CDS at 14:57 UT.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Limited (Keyhole) Science Operations.
COMMENTS: 
=============================================================================
DATE: 21-Sep-2004
DOY: 265
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: C. Maroney
CDS INSTRUMENT: 
  CDS Doors Closed.
  SOHO Roll Maneuver to 0 Deg (last burn) was completed at ~19:51 UT.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Limited (Keyhole) Science Operations.
COMMENTS: 
=============================================================================
DATE: 22-Sep-2004
DOY: 266
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: C. Maroney
CDS INSTRUMENT: 
  CDS Doors were opened at 21:05 UT.
  FOT enabled ESR flag for CDS at 21:15 UT.
  Science plan will resume at 23:00 UT.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Limited (Keyhole) Science Operations.
COMMENTS: 
=============================================================================
DATE: 23-Sep-2004
DOY: 267
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: C. Maroney
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: 
  PDU Maintenance will take place from 15:45 UT - 19:45 UT.  CDS Ops machines
will be down during this period.
DAY PLAN: Limited (Keyhole) Science Operations.
COMMENTS: 
=============================================================================
DATE: 24-Sep-2004
DOY: 268
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: C. Maroney
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Limited (Keyhole) Science Operations.
COMMENTS: 
=============================================================================
DATE: 25-Sep-2004
DOY: 269
OPERATIONS ENGINEER(S): B. Howell / C. King
SCIENTIST: C. Maroney
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Limited (Keyhole) Science Operations.
COMMENTS: 
=============================================================================
DATE: 26-Sep-2004
DOY: 270
OPERATIONS ENGINEER(S): B. Howell / C. King
SCIENTIST: C. Maroney
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Limited (Keyhole) Science Operations.
COMMENTS: 
=============================================================================
DATE: 27-Sep-2004
DOY: 271
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: D. Bewsher
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Limited (Keyhole) Science Operations.
COMMENTS: 
=============================================================================
DATE: 28-Sep-2004
DOY: 272
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: D. Bewsher
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Limited (Keyhole) Science Operations.
COMMENTS: 
=============================================================================
DATE: 29-Sep-2004
DOY: 273
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: D. Bewsher
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Limited (Keyhole) Science Operations.
COMMENTS: 
=============================================================================
DATE: 30-Sep-2004
DOY: 274
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: D. Bewsher
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: 
  The following study was imported to the EOF:
    stre4w_111.def
DAY PLAN: Limited (Keyhole) Science Operations.
COMMENTS: 
=============================================================================



From the CDS Operations Management Team in the Space Science & Technology Department at CCLRC Rutherford Appleton Laboratory
Site maintained by John Rainnie.
Last revised on Tuesday (17/Jul/2001) at 08:55.