Scientific Operations | ||
|
September 2006============================================================================= DATE: 1-Sep-2006 DOY: 244 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: P. Young (RAL) CDS INSTRUMENT: A Mechanism Lubrication was performed at 16:30 UT. CDS GROUND SYSTEM: Nominal. DAY PLAN: Keyhole Operations. COMMENTS: ============================================================================= DATE: 2-Sep-2006 DOY: 245 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: P. Young (RAL) CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Keyhole Operations. COMMENTS: ============================================================================= DATE: 3-Sep-2006 DOY: 246 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: P. Young (RAL) CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Keyhole Operations. COMMENTS: ============================================================================= DATE: 4-Sep-2006 DOY: 247 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: P. Young (RAL) CDS INSTRUMENT: The following parity errors were detected on the primary processor: #800729d3 - Unused memory (safe) #80078457 - Sequence tables (probably safe) #8007c56b - Sequence tables (probably safe) CDS GROUND SYSTEM: Nominal. DAY PLAN: Keyhole Operations. COMMENTS: ============================================================================= DATE: 5-Sep-2006 DOY: 248 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: P. Young (RAL) CDS INSTRUMENT: CDS Doors were closed at 18:35 UT for S/C maneuvers. ESR flag for CDS were disabled by the FOT at 18:48 UT. CDS GROUND SYSTEM: Nominal. DAY PLAN: Closed Door Studies (FULLCCDs). COMMENTS: Doors Closed. ============================================================================= DATE: 6-Sep-2006 DOY: 249 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: P. Young (RAL) CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Closed Door Studies (FULLCCDs). COMMENTS: Doors Closed. ============================================================================= DATE: 7-Sep-2006 DOY: 250 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: P. Young (RAL) CDS INSTRUMENT: CDS Doors were opened at 20:24 UT. CDS GROUND SYSTEM: Nominal. DAY PLAN: Closed Door Studies (FULLCCDs) / Keyhole Operations. COMMENTS: ============================================================================= DATE: 8-Sep-2006 DOY: 251 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: P. Young (RAL) CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Keyhole Operations. COMMENTS: ============================================================================= DATE: 9-Sep-2006 DOY: 252 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: P. Young (RAL) CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Keyhole Operations. COMMENTS: ============================================================================= DATE: 10-Sep-2006 DOY: 253 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: P. Young (RAL) CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Keyhole Operations. COMMENTS: ============================================================================= DATE: 11-Sep-2006 DOY: 254 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: P. Young (RAL) CDS INSTRUMENT: A parity error was detected on the secondary (Science) processor at memory location #80076ad3. CDS GROUND SYSTEM: Nominal. DAY PLAN: Keyhole Operations. COMMENTS: Spacecraft Roll to "Normal Position" occurred from 14-17 UT. ============================================================================= DATE: 12-Sep-2006 DOY: 255 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: P. Young (RAL) CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Keyhole Operations. COMMENTS: ============================================================================= DATE: 13-Sep-2006 DOY: 256 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: P. Young (RAL) CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Keyhole Operations. COMMENTS: ============================================================================= DATE: 14-Sep-2006 DOY: 257 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: P. Young (RAL) CDS INSTRUMENT: A parity error was detected on the primary processor at address #800635ab - Packetization Module (safe). CDS GROUND SYSTEM: Nominal. DAY PLAN: Keyhole Operations. COMMENTS: ============================================================================= DATE: 15-Sep-2006 DOY: 258 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: P. Young (RAL) CDS INSTRUMENT: FOT notified CDS that GIS telemetry values violating RED Limits. A pass was obtained at 06:00 UT (DOY 251) to verify Realtime GIS data. During this time down time replay data showed that the GIS was nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Keyhole Operations. COMMENTS: ============================================================================= DATE: 16-Sep-2006 DOY: 259 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: P. Young (RAL) CDS INSTRUMENT: During the 06:00 UT pass, no telemetry was seen since SOHO was in record. The next pass scheduled for 17:00 UT was the next opportunity to repeat the problem reported last night. Again, CDS reported GIS as nominal, but the FOT did not. After running STM it was discovered that a parity error occurred in the primary processor at address #8000bcb3 - CDS HK Module (unsafe). It was determined that this was the cause of this anomally. A reboot will be performed next pass. CDS GROUND SYSTEM: Nominal. DAY PLAN: Keyhole Operations. COMMENTS: ============================================================================= DATE: 17-Sep-2006 DOY: 260 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: P. Young (RAL) CDS INSTRUMENT: A CDS Reboot was performed beginning at 22:04 UT and completed at 23:22 UT. CDS is nominal after the reboot. FOT reports that they are receiving CDS telemetry. CDS GROUND SYSTEM: Nominal. DAY PLAN: Keyhole Operations. COMMENTS: ============================================================================= DATE: 18-Sep-2006 DOY: 261 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: P. Young (RAL) CDS INSTRUMENT: A telemetry submode change (from 5 to 6) occured at 20:45 UT. CDS is nominal. Science plan will resume at 00:00 UT (DOY 262). CDS GROUND SYSTEM: Nominal. DAY PLAN: Keyhole Operations. COMMENTS: ============================================================================= DATE: 19-Sep-2006 DOY: 262 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: P. Young (RAL) CDS INSTRUMENT: Due to problems with the DSN network, contact with SOHO was last at ~23:16 UT. As a result, the command load that was running had to be aborted. No further attempt was made to upload during this pass due to lack of time. The science plan upload was loaded on the subsequent pass. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: 26m Keyhole Ends ============================================================================= DATE: 20-Sep-2006 DOY: 263 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: P. Young (RAL) CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE: 21-Sep-2006 DOY: 264 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: P. Young (RAL) CDS INSTRUMENT: A parity error was detected on the secondary (Science) processor at address #8006721f. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE: 22-Sep-2006 DOY: 265 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: P. Young (RAL) CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE: 23-Sep-2006 DOY: 266 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: P. Young (RAL) CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: Solar B Launch ============================================================================= DATE: 24-Sep-2006 DOY: 267 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: P. Young (RAL) CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE: 25-Sep-2006 DOY: 268 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: T. Kucera (GSFC) CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE: 26-Sep-2006 DOY: 269 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: T. Kucera (GSFC) CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE: 27-Sep-2006 DOY: 270 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: T. Kucera (GSFC) CDS INSTRUMENT: A primary parity error was detected at #8002f0fb - Macro7 Module (probably safe). CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE: 28-Sep-2006 DOY: 271 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: T. Kucera (GSFC) CDS INSTRUMENT: A secondary parity error was detected at #8007dbf3. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE: 29-Sep-2006 DOY: 272 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: T. Kucera (GSFC) CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= DATE: 30-Sep-2006 DOY: 273 OPERATIONS ENGINEER(S): C. Maroney / R. Yurow SCIENTIST: T. Kucera (GSFC) CDS INSTRUMENT: Nominal. CDS GROUND SYSTEM: Nominal. DAY PLAN: Science Operations. COMMENTS: ============================================================================= From the CDS Operations Management Team in the Space Science & Technology Department at CCLRC Rutherford Appleton Laboratory Site maintained by John Rainnie. Last revised on Friday (20/Jan/2006) at 08:52. |