September 2006
 
=============================================================================
DATE: 1-Sep-2006
DOY: 244
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: P. Young (RAL)
CDS INSTRUMENT: 
  A Mechanism Lubrication was performed at 16:30 UT.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Keyhole Operations.
COMMENTS: 
=============================================================================
DATE: 2-Sep-2006
DOY: 245
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: P. Young (RAL)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Keyhole Operations.
COMMENTS: 
=============================================================================
DATE: 3-Sep-2006
DOY: 246
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: P. Young (RAL)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Keyhole Operations.
COMMENTS: 
=============================================================================
DATE: 4-Sep-2006
DOY: 247
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: P. Young (RAL)
CDS INSTRUMENT: 
  The following parity errors were detected on the primary processor:
    #800729d3 - Unused memory (safe)
    #80078457 - Sequence tables (probably safe)
    #8007c56b - Sequence tables (probably safe)
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Keyhole Operations.
COMMENTS: 
=============================================================================
DATE: 5-Sep-2006
DOY: 248
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: P. Young (RAL)
CDS INSTRUMENT: 
  CDS Doors were closed at 18:35 UT for S/C maneuvers.
  ESR flag for CDS were disabled by the FOT at 18:48 UT.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Closed Door Studies (FULLCCDs).
COMMENTS: Doors Closed.
=============================================================================
DATE: 6-Sep-2006
DOY: 249
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: P. Young (RAL)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Closed Door Studies (FULLCCDs).
COMMENTS: Doors Closed.
=============================================================================
DATE: 7-Sep-2006
DOY: 250
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: P. Young (RAL)
CDS INSTRUMENT: 
  CDS Doors were opened at 20:24 UT.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Closed Door Studies (FULLCCDs) / Keyhole Operations.
COMMENTS: 
=============================================================================
DATE: 8-Sep-2006
DOY: 251
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: P. Young (RAL)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Keyhole Operations.
COMMENTS: 
=============================================================================
DATE: 9-Sep-2006
DOY: 252
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: P. Young (RAL)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Keyhole Operations.
COMMENTS: 
=============================================================================
DATE: 10-Sep-2006
DOY: 253
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: P. Young (RAL)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Keyhole Operations.
COMMENTS: 
=============================================================================
DATE: 11-Sep-2006
DOY: 254
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: P. Young (RAL)
CDS INSTRUMENT:
  A parity error was detected on the secondary (Science) processor at memory
location #80076ad3.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Keyhole Operations.
COMMENTS: Spacecraft Roll to "Normal Position" occurred from 14-17 UT.
=============================================================================
DATE: 12-Sep-2006
DOY: 255
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: P. Young (RAL)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Keyhole Operations.
COMMENTS: 
=============================================================================
DATE: 13-Sep-2006
DOY: 256
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: P. Young (RAL)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Keyhole Operations.
COMMENTS: 
=============================================================================
DATE: 14-Sep-2006
DOY: 257
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: P. Young (RAL)
CDS INSTRUMENT: 
  A parity error was detected on the primary processor at address #800635ab -
Packetization Module (safe).
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Keyhole Operations.
COMMENTS: 
=============================================================================
DATE: 15-Sep-2006
DOY: 258
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: P. Young (RAL)
CDS INSTRUMENT: 
  FOT notified CDS that GIS telemetry values violating RED Limits.  A pass
was obtained at 06:00 UT (DOY 251) to verify Realtime GIS data.  During this 
time down time replay data showed that the GIS was nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Keyhole Operations.
COMMENTS: 
=============================================================================
DATE: 16-Sep-2006
DOY: 259
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: P. Young (RAL)
CDS INSTRUMENT: 
  During the 06:00 UT pass, no telemetry was seen since SOHO was in record.
  The next pass scheduled for 17:00 UT was the next opportunity to repeat the
problem reported last night.  Again, CDS reported GIS as nominal, but the FOT
did not.  After running STM it was discovered that a parity error occurred in
the primary processor at address #8000bcb3 - CDS HK Module (unsafe).  It was
determined that this was the cause of this anomally.  A reboot will be
performed next pass.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Keyhole Operations.
COMMENTS: 
=============================================================================
DATE: 17-Sep-2006
DOY: 260
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: P. Young (RAL)
CDS INSTRUMENT: 
  A CDS Reboot was performed beginning at 22:04 UT and completed at 23:22 UT.
CDS is nominal after the reboot.  FOT reports that they are receiving CDS
telemetry.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Keyhole Operations.
COMMENTS: 
=============================================================================
DATE: 18-Sep-2006
DOY: 261
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: P. Young (RAL)
CDS INSTRUMENT: 
  A telemetry submode change (from 5 to 6) occured at 20:45 UT.
CDS is nominal.  Science plan will resume at 00:00 UT (DOY 262).
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Keyhole Operations.
COMMENTS: 
=============================================================================
DATE: 19-Sep-2006
DOY: 262
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: P. Young (RAL)
CDS INSTRUMENT: 
  Due to problems with the DSN network, contact with SOHO was last at 
~23:16 UT.  As a result, the command load that was running had to be aborted.
  No further attempt was made to upload during this pass due to lack of time.
The science plan upload was loaded on the subsequent pass.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 26m Keyhole Ends
=============================================================================
DATE: 20-Sep-2006
DOY: 263
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: P. Young (RAL)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE: 21-Sep-2006
DOY: 264
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: P. Young (RAL)
CDS INSTRUMENT: 
  A parity error was detected on the secondary (Science) processor at
address #8006721f.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE: 22-Sep-2006
DOY: 265
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: P. Young (RAL)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE: 23-Sep-2006
DOY: 266
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: P. Young (RAL)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: Solar B Launch
=============================================================================
DATE: 24-Sep-2006
DOY: 267
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: P. Young (RAL)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE: 25-Sep-2006
DOY: 268
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: T. Kucera (GSFC)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE: 26-Sep-2006
DOY: 269
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: T. Kucera (GSFC)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE: 27-Sep-2006
DOY: 270
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: T. Kucera (GSFC)
CDS INSTRUMENT: 
  A primary parity error was detected at #8002f0fb - Macro7 Module 
(probably safe).
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE: 28-Sep-2006
DOY: 271
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: T. Kucera (GSFC)
CDS INSTRUMENT: 
  A secondary parity error was detected at #8007dbf3.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE: 29-Sep-2006
DOY: 272
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: T. Kucera (GSFC)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================
DATE: 30-Sep-2006
DOY: 273
OPERATIONS ENGINEER(S): C. Maroney / R. Yurow
SCIENTIST: T. Kucera (GSFC)
CDS INSTRUMENT: Nominal.
CDS GROUND SYSTEM: Nominal.
DAY PLAN: Science Operations.
COMMENTS: 
=============================================================================